Statura IntelligenceStatura IntelligenceBETA
← Meeting Prep
Resolution· R7 L· Commission Meeting· Wed, Jun 28, 2023

Resolution R7 L

Status
pending
Importance
78/100
Track
Statura briefing · workspace aware

Ask Statura about this item

ResolutionintroducedCommission Meeting

What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.

Lifecycle

IntroducedJun 28, 2023
Adopted
Effective

Registered lobbying that may relate

Apogee Condominium Association via GONZALEZ, Logan A · “Design Review Board improvements · possible match on improvement · source ↗
Matt Alvarez via HECKLER, Alexander P · “Capital Project, Engineering Contracts · possible match on engineering · source ↗
Alton Road Homeowners & Residents Registration of Neighborhood via KRAVITZ, Adam M · “Registration of Neighborhood · possible match on neighborhood · source ↗
Issue-text match against Miami Beach's lobbyist registry. See the full registry on the Lobbyists tab.

Item text

A resolution of the mayor and city commission of the city of miami beach, florida, approving for the north shore d neighborhood improvement (north beach town center) project, pursuant to the agreement request for proposals (RFQ) 2018-312-kb master design consultant for integrated water management between the city and jacobs engineering group, INC. And authorizing a task order to complete the engineering and

Show the full text (2K chars)

A resolution of the mayor and city commission of the city of miami beach, florida, approving for the north shore d neighborhood improvement (north beach town center) project, pursuant to the agreement request for proposals (RFQ) 2018-312-kb master design consultant for integrated water management between the city and jacobs engineering group, INC. And authorizing a task order to complete the engineering and consulting services required for the basis of design for services including: (1) design analysis for potable water, sanitary sewer, and stormwater infrastructure needs; (2) the sizing and location of future stormwater pump station(s) and water quality structures; (3) the construction phasing for completing the required improvements; (4) support services for public outreach and communications with project stakeholders and residents in the amount not to exceed of $1,825,978.52 performed by jacobs engineering group, INC. And ces consulting, INC.; and approving hazen and sawyer, p.c., as a new subconsultant, to perform specialized ancillary services for hydraulic modeling and associated analysis for potable water and sanitary sewer infrastructure in the amount not to exceed of $327,978.88; and approving brizaga, INC., as a new subconsultant, to perform specialized ancillary services for public outreach and stakeholder communication services in the amount not to exceed of $124,602.54; and approving longitude surveyors, LLC, as a new subconsultant, to perform specialized ancillary services for surveying in the total amount not to exceed of $352,565.00; and approving psi technologies, INC., as a new subconsultant, to perform ancillary specialized services for geotechnical investigations in the amount not to exceed of $22,694.52, for a total project not to exceed amount of $2,653,819.46. Public works

Official documents

City legislative record from the city's public agenda system. The Ask-Statura brief is an automated interpretation grounded in this item's metadata, not legal advice.