Resolution· C7 C· City Commission Meeting· Wed, Mar 9, 2022

Authorize change order for affordable housing rehabilitation

Status
pending
Importance
70/100
Track
Statura briefing · workspace aware

Ask Statura about this item

ResolutionintroducedCity Commission Meeting

What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.

Lifecycle

IntroducedMar 9, 2022
Adopted
Effective

Registered lobbying that may relate

Builders Assoc. of South Florida via BURTON, Truly · “All building and construction related · possible match on construction · source ↗
Matt Alvarez via HECKLER, Alexander P · “Capital Project, Engineering Contracts · possible match on engineering · source ↗
MIAMI DESIGN PRESERVATION via LOUSTEAU, Meg · “December 17, 2025 City Commission · possible match on commission · source ↗
Issue-text match against Miami Beach's lobbyist registry. See the full registry on the Lobbyists tab.

Item text

A resolution of the mayor and city commission of the city of miami beach, florida, approving and authorizing the city manager to execute change order no. 1 to the contract between the city and florida construction & engineering, INC., relating to the rehabilitation of the city's affordable housing project known as the madeleine village apartments, located at 7861-7871 crespi boulevard; said change order including

Show the full text (2K chars)

A resolution of the mayor and city commission of the city of miami beach, florida, approving and authorizing the city manager to execute change order no. 1 to the contract between the city and florida construction & engineering, INC., relating to the rehabilitation of the city's affordable housing project known as the madeleine village apartments, located at 7861-7871 crespi boulevard; said change order including the following additional scope of work: 1) performing moving services for tenants who are displaced as a result of the construction work, in the amount of $14,400; 2) supplying and installing new flooring in all sixteen units, in the amount of $69,776; 3) removing and relocating two (2) existing junction boxes and their respective conduits, in the amount of $8,807.50; 4) performing electrical modifications of the kitchen area in all units, in the amount of $11,992.50; 5) supplying and installing two (2) ADA handrails in rear apartments, in the amount of $595.00; 6) supplying and installing concrete pavers on the southern walkway to provide an additional escape route, as requested by the city's fire department, in the amount of $3,654.72; 7) installing fire pads on existing boxes within fire walls in adjacent units to meet the fire code, in the amount of $852.80; 8) supplying and installing conflex sherlastic elastomeric coating to the outdoor façade of all four buildings, in the amount of $14,895.38; 9) removing and replacing the bathtub, tiles, faucets and drain for one of the units, in the amount of $5,398.67; and 10) extending the contract time by 60 days, for a total change order amount of $130,372.57, that increases the contract amount from $609,687.00 to $740,059.57. Housing and community services

Official documents

City legislative record from the city's public agenda system. The Ask-Statura brief is an automated interpretation grounded in this item's metadata, not legal advice.