Approve engineering task order for Star Island force main replacement
Ask Statura about this item
What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.
Lifecycle
Registered lobbying that may relate
Item text
A resolution of the mayor and city commission of the city of miami beach, florida, approving for the star island force main replacement project, pursuant to the agreement request for proposals (RFQ) 2022-122-nd for engineering services for water and wastewater system projects between the city and hazen and sawyer, p.c. And authorizing a task order to complete the engineering and consulting services required for the…
Show the full text (1K chars)
A resolution of the mayor and city commission of the city of miami beach, florida, approving for the star island force main replacement project, pursuant to the agreement request for proposals (RFQ) 2022-122-nd for engineering services for water and wastewater system projects between the city and hazen and sawyer, p.c. And authorizing a task order to complete the engineering and consulting services required for the design and post design services including: (1) preparation of design criteria package of the replacement of an aging subaqueous force main infrastructure from pump station no. 2 located at the median of star island to a connection point located in the vicinity of 10th street and alton road in the amount not to exceed $331,774 necessary for the civil engineering services; (2) utilize longitude surveyors, LLC to perform vacuum excavations and topographic and hydrographic survey in the amount not to exceed $66,090; (3) utilize langan engineering and environmental services, INC to perform geotechnical testing, analysis, and reporting services in the amount not to exceed $231,500; (4) approving olin hydrographic solutions, INC. To perform specialized benthic survey in the amount not to exceed $5,000; (5) approving environmental solutions international, LLC. To perform submerged lands and easement research in the amount not to exceed $5,000, for a total project not to exceed amount of $642,364. Public works
Official documents
City legislative record from the city's public agenda system. The Ask-Statura brief is an automated interpretation grounded in this item's metadata, not legal advice.