Statura IntelligenceStatura IntelligenceBETA
← Meeting Prep
Resolution· 3.· Village Council· Tue, Jan 10, 2023

Authorize $275,032 amendment with H&R Paving for water construction

Dollar impact
$275K
Status
pending
Importance
61/100
Track
Statura briefing · workspace aware

Ask Statura about this item

Resolution$275,032introducedVillage Council

What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.

Lifecycle

IntroducedJan 4, 2023
Adopted
Effective

Item text

RESOLUTION NO. 2023- A RESOLUTION OF THE VILLAGE OF PINECREST, FLORIDA, AUTHORIZING THE VILLAGE MANAGER TO EXECUTE AN AMENDMENT TO AN AGREEMENT WITH H&R PAVING, INC., FOR THE POTABLE WATER CONSTRUCTION PROJECT; PROVIDING FOR AN EFFECTIVE DATE. BE IT RESOLVED BY THE VILLAGE COUNCIL OF PINECREST, FLORIDA, AS FOLLOWS: Section 1. That the Village Council hereby authorizes the Village Manager to execute the

Show the full text (8K chars)

RESOLUTION NO. 2023- A RESOLUTION OF THE VILLAGE OF PINECREST, FLORIDA, AUTHORIZING THE VILLAGE MANAGER TO EXECUTE AN AMENDMENT TO AN AGREEMENT WITH H&R PAVING, INC., FOR THE POTABLE WATER CONSTRUCTION PROJECT; PROVIDING FOR AN EFFECTIVE DATE.

BE IT RESOLVED BY THE VILLAGE COUNCIL OF PINECREST, FLORIDA, AS FOLLOWS: Section 1. That the Village Council hereby authorizes the Village Manager to execute the attached amendment to the agreement with H&R Paving, Inc. for the potable water project. Section 2. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 10th day of January, 2023. Joseph M. Corradino, Mayor Attest: ____________________________ Priscilla Torres, CMC Village Clerk Approved as to Form and Legal Sufficiency: ____________________________ Mitchell Bierman Village Attorney Consent Agenda DATE: January 3, 2023 TO: The Honorable Mayor and Members of the Village Council FROM: Yocelyn Galiano, ICMA-CM, Village Manager RE: Resolution Approving Request for Change Order for Potable Water Project ______________________________________________________________________________ Attached for your consideration, please find a Request for Change Order by H&R Paving dated December 13, 2022. This request for a change order covers the additional pipe necessary to complete the Potable Water Project and represents the difference between the bid quantity and the pipe quantity added after the contract was awarded due to Miami- Dade Water and Sewer Department permit requirements. The unit price for the pipe represented in this change order request is the same as the previously Council approved adjusted price from Change Order 1. Due to market volatility and supply chain issues the price was increased to $43.79 per unit for standard pipe and $47.69 per unit for coated zinc pipe. I hereby respectfully recommend the Village Council adopt the attached resolution authorizing the Village Manager to execute a change order with H&R Paving in the amount of $275,032 to cover the additional cost of the potable water project due to project changes that arose during the permitting process with the Miami-Dade Water and Sewer Department. Project: Pinecrest Water Main Contract No: 2020-006 Description: 8" DIP Overrun Date: 13-Dec-22 RCO # 06 Unit Qty Unit Price Total Comments 1.01 Furnish and Install 8-inch diameter DI Standard Pipe Water Main including fittings, offsets, tapping sleeves, tapping charges, restrained fittings, valves, thrust blocks, stub-outs, blowoffs, connections to existing mains, bacteriological tests, pressure tests, and all required restoration. This Item is to be paid 70% upon pipe installation/backfill and the remaining 30% upon final accepted restoration including passing compaction tests, temporary asphalt, sod, sidewalk, curb, tree & driveway restoration. 2,314.00 LF 84.82 $ 196,273.48 $ Overrun Price for Standard Pipe 1.01 Furnish and Install 8-inch diameter DI Coated Zinc Pipe Water Main including fittings, offsets, tapping sleeves, tapping charges, restrained fittings, valves, thrust blocks, stub-outs, blowoffs, connections to existing mains, bacteriological tests, pressure tests, and all required restoration. This Item is to be paid 70% upon pipe installation/backfill and the remaining 30% upon final accepted restoration including passing compaction tests, temporary asphalt, sod, sidewalk, curb, tree & driveway restoration. 3,100.00 LF 88.72 $ 275,032.00 $ Overrun Price for Zinc Coated Pipe 471,305.48 $ Explanation of revised prices 1.01 Furnish and Install 8-inch diameter DIP Water Main including fittings, offsets, tapping sleeves, tapping charges, restrained fittings, valves, thrust blocks, stub-outs, blowoffs, connections to existing mains, bacteriological tests, pressure tests, and all required restoration. This Item is to be paid 70% upon pipe installation/backfill and the remaining 30% upon final accepted restoration including passing compaction tests, temporary asphalt, sod, sidewalk, curb, tree & driveway restoration. 1.00 LF 64.53 $ 64.53 $ Contract Price 1.01 Pipe price included in our contract 1 LF 23.50 $ 23.50 $ Contract Pipe Price 1.01 Overrun Standar Pipe Price (Tax Included) 1 LF 43.79 $ 43.79 $ Std Pipe Current Price 1.01 Overrun Coated Zinc Pipe Price (Tax Included) 1 LF 47.69 $ 47.69 $ Zinc Pipe Current Price Difference in Standart Pipe 1 LF 20.29 $ 20.29 $ Std Pipe Increase on the contract price Difference in Coated Zinc Pipe 1 LF 24.19 $ 24.19 $ Zinc Pipe Increase on the contract price 1.01 Revised Contract Item Price using Standard Pipe 1 LF 84.82 $ 84.82 $ Stad Pipe Revised Unit Price 1.01 Revised Contract Item Price using Coated Zinc Pipe 1 LF 88.72 $ 88.72 $ Zinc Pipe Revised Unit Price Caledar Days Requsted 30 Days ________________________________________ Santiago Lopez, PROJECT MANAGER REFERENCE DOCUMENTS: 1 Fortiline Proposal H&R Paving, Inc. Total RCO No 6 Item Description Area Ricky's spreadsheet (to be updated using 12/1/22 quantities) 11/22/22 takeoff from plan summary sheet Manual takeoff from profile views 12/1/22 As-builts Notes 1A 2,841 2,786 2,757 2,757 1B 7,516 7,478 7,492 7,485 1C 9,240 9,915 9,400 1D 11,775 12,810 12,401 2A 5,291 5,291 4,935 errors found in profile quantity 2B 9,440 9,950 9,361 errors found in profile quantity 2C 16,982 16,982 17,187 2D 2,461 2,461 2,462 3A 4,279 4,279 4,303 3B 3,593 3,593 3,600 3C 4,243 4,243 4,253 3D 9,160 9,660 9,162 4A 0 6,635 6,364 Not yet approved by MDWASD 4B 0 3,479 3,494 4C 0 3,294 3,317 4D 0 2,964 2,307 105,820 102,795 Contract: 97,381 LF Revision: 102,795 Overrun: 5,414 LF Standard: 2,314 LF Zinc Coated: 3,100 LF BIDCNEW QUOTE DATE QUOTE NO PAGE CUSTOMER PROJECT INFORMATION QTY DESCRIPTION UOM UNIT PRICE TOTAL PRICE CUSTOMER NO QUOTING BRANCH ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date. After 7 days for PVC and HDPE or 30 days for all other material, ALL quoted prices are subject to review based on current market conditions. LINE Due to the continued cost and supply challenges in the DUCTILE IRON PIPE, PVC and HDPE markets, the pricing of these products will be based solely on the availability at the time of shipment. Also, given the volatility in these markets we will not be responsible for product availability and shipment delays, as they are out of our control. Bid prices should be considered an estimate, materials will only be priced at time of shipment until the current supply chain challenges are resolved. These terms are in leu of our standard terms. We appreciate your partnership. QUOTE 12/08/22 6278045 H&R PAVING INC 1955 NW 110TH AVE MIAMI, FL 33172 219178 8" TJ DIP PR350 8" TJ DIP ZINC PR350 8" TJ DIP ZINC PR350 2320 800 1600 ****************************** GIVEN THE CURRENT PRICING AND SUPPLY CHAIN CHALLENGES ALL MATERIAL WILL BE PRICED AT TIME OF SHIPMENT AND THE PRICES BELOW ARE TO BE USED AS AN ESTIMATE FOR BID PURPOSES ONLY ****************************** 1-2 WEEKS ETA IN STOCK IN STOCK 40 60 110 FT FT FT 41.3100 44.9900 44.9900 95,839.20 35,992.00 71,984.00 1 Subtotal: Tax: Bid Total: 203,815.20 12,278.91 216,094.11 Ent By FR1 12/12/22 20:52:16 8" T350 PIPE FORTILINE MIAMI AB Pipe Lead Time