Authorize Metro Express contract for fire access road construction
Ask Statura about this item
What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.
Lifecycle
Item text
RESOLUTION NO. 2023- A RESOLUTION OF THE VILLAGE OF PINECREST, FLORIDA, AUTHORIZING THE VILLAGE MANAGER TO ENTER INTO A CONTRACT WITH METRO EXPRESS FOR CONSTRUCTION OF A FIRE ACCESS ROAD FROM THE PUBLIC WORKS YARD TO THE COMMUNITY CENTER FIELD; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Village Manager wishes to enter into a contract with Metro Express for milling and resurfacing; NOW,…
Show the full text (4K chars)
RESOLUTION NO. 2023- A RESOLUTION OF THE VILLAGE OF PINECREST, FLORIDA, AUTHORIZING THE VILLAGE MANAGER TO ENTER INTO A CONTRACT WITH METRO EXPRESS FOR CONSTRUCTION OF A FIRE ACCESS ROAD FROM THE PUBLIC WORKS YARD TO THE COMMUNITY CENTER FIELD; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Village Manager wishes to enter into a contract with Metro Express for milling and resurfacing;
NOW, THEREFORE,
BE IT RESOLVED BY THE VILLAGE COUNCIL OF PINECREST, FLORIDA, AS FOLLOWS: Section 1. That the Village Council hereby authorizes the Village Manager to enter into an agreement with Metro Express for Constructing a Fire Access Road for Pinecrest Gardens from the Public Works Yard to the Community Center Field. Section 2. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 12th day of December, 2023. Joseph M. Corradino, Mayor Attest: ____________________________ Priscilla Torres, MMC Village Clerk Approved as to Form and Legal Sufficiency: ____________________________ Mitchell Bierman Village Attorney CONSENT AGENDA DATE: December 4, 2023 TO: The Honorable Mayor and Members of the Village Council FROM: Yocelyn Galiano, ICMA CM, Village Manager RE: Resolution to Approve a construction proposal from Metro Express for Constructing a Fire Acsess Road for Pinecrest Gardens from the Public Works Yard to the Community Center Field ______________________________________________________________________ Attached for your consideration, please find the construction proposal from Metro Express for the subject work. The proposal is based on a piggyback contract Metro Express has with the Village. I hereby respectfully recommend the Village Council adopt the attached resolution authorizing the Village Manager to accept the proposal authorizing the work. Metro Express, Inc. State Wide General Engineering Contractors CGCO50965- E-201301 Licensed Insured Bonded Quote No. Date: To: Contact Phone: Fax: 305-669-6919 Job: between PW facility and Community Center Unit Qty UP Total LS 1 6,120.00 6,120.00 SY 720 15.00 10,800.00 SY 720 9.00 6,480.00 SY 720 25.00 18,000.00 SY 720 36.00 25,920.00 TOTAL 67,320.00 Authorized Signature: A.F. ACCEPTANCE OF PROPOSAL ACCEPTED BY: name signature DATE: The above prices, specifications and conditions are hereby accepted. You are authorized to do work as specified. Payment will be made as outilne above and interest charges may be charged upon deliquent accounts. ***Important: basic restoration as of backfilling back of sidewalk with dirt is included for sidewalk work, however, there is No sodding included and if needed this will be an additional charge We hereby propose to furnish labor and materials, complete in accordance with above specifications, for the sum showm above, with payment to be made within 30 days after work completed. THIS PROPOSAL SUBJECT TO ACCEPTANCE WITHIN 30 DAYS AND IS VOID THREAFTER AT THE OPTION OF METRO EXPRESS INC. **All work to be performed in regular daily operation hours during weekdays. Village to remove all stored debris and materials on both sides of Road Notes: **All other job not listed above will be billed at additional charge. **Price do not include any permit (to be obtained by others), MOT, surveying, tree removal, valve adjustment, testing, layout, marking, painting, as-built, regrading, landscaping, etc **Not responsible for area not ready, cars or any other obstacle in the area of work. Charles R. Carr 305-669-6916 Fire Access Road connection We hereby propose to furnish all labor, material and equipment subject to terms and conditions as follows: The job will include and be limited to the following: 160-4 Subgrade Compaction Stabilization 285-70-4 New Limerock Base 334-2-2 Asphlat Hot Mix: Traffic B SP-12.5, 2" avg Mobilization (10%) 120-1-2 Clearing, Scraping and Disposal of Soil Pinecrest, FL 33156 PROPOSAL PI-113023-01 11/30/2023 Village of Pinecrest (Public Works Department) 10800 Red Rd 9390 N.W. 109th. ST – Medley, Florida 33178- Telephone: (305) 885-1330 / Fax (305) 885-1327 An equal opportunity employer
Official documents
City legislative record from the city's public agenda system. The Ask-Statura brief is an automated interpretation grounded in this item's metadata, not legal advice.