Contract with Florida Sidewalk Solutions for sidewalk survey and repair
Ask Statura about this item
What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.
Lifecycle
Item text
RESOLUTION NO. 2024- A RESOLUTION OF THE VILLAGE OF PINECREST, FLORIDA, AUTHORIZING THE VILLAGE MANAGER TO ENTER INTO A CONTRACT WITH FLORIDA SIDEWALK SOLUTIONS FOR SIDEWALK SURVEY AND REPAIR SERVICES; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Town of Miami Lakes conducted a competitive bidding process for the procurement of Repair of Sidewalk Trip Hazards and awarded a bid to Florida Sidewalk…
Show the full text (192K chars)
RESOLUTION NO. 2024- A RESOLUTION OF THE VILLAGE OF PINECREST, FLORIDA, AUTHORIZING THE VILLAGE MANAGER TO ENTER INTO A CONTRACT WITH FLORIDA SIDEWALK SOLUTIONS FOR SIDEWALK SURVEY AND REPAIR SERVICES; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Town of Miami Lakes conducted a competitive bidding process for the procurement of Repair of Sidewalk Trip Hazards and awarded a bid to Florida Sidewalk Solutions; and WHEREAS, pursuant to Section 2-287 of the Code of Ordinances, the Village Manager is authorized to execute contracts, as entered into by other governmental authorities, provided that the governmental authority has followed a competitive bidding procedure leading to the award of the bid or contract in question; and WHEREAS, the Village Manager wishes to enter into a contract with Florida Sidewalk Solutions for Sidewalk Survey and Repair Services;
NOW, THEREFORE,
BE IT RESOLVED BY THE VILLAGE COUNCIL OF PINECREST, FLORIDA, AS FOLLOWS: Section 1. That the Village Council hereby authorizes the Village Manager, pursuant to Section 2-287 of the Code of Ordinances, to “piggyback” on an existing contract between Town of Miami Lakes and Florida Sidewalk Solutions (Bid No. 2023-36R), and enter into an agreement with Florida Sidewalk Solutions; for Sidewalk Survey and Repair Services. Section 2. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 13th day of February, 2024. Joseph M. Corradino, Mayor Attest: ____________________________ Priscilla Torres, MMC Village Clerk Approved as to Form and Legal Sufficiency: ____________________________ Mitchell Bierman Village Attorney Consent Agenda DATE: February 5, 2024 TO: The Honorable Mayor and Members of the Village Council FROM: Yocelyn Galiano, ICMA-CM, Village Manager RE: Resolution Authorizing Contract with Florida Sidewalk Solutions for Sidewalk Survey and Repair Services ______________________________________________________________________________ The Village Council authorized funding for a comprehensive evaluation of the sidewalk system and miscellaneous sidewalk repair projects at various locations throughout the Village as part of the Fiscal Year 2024 budget. Attached for your consideration is a resolution authorizing the Village Manager to enter into a piggy-back contract with Florida Sidewalk Solutions, LLC commencing February 15, 2024 for sidewalk survey and repair services. The original contract with the City of Miami Lakes was competitively bid in September 2023 and awarded on October 24, 2023 in compliance with Pinecrest procurement policy. I hereby respectfully recommend the Village Council approve the attached resolution authorizing the piggy-back contract commencing on February 15, 2024 for an amount not to exceed $500,000. INVITATION TO BID REPAIR OF SIDEWALK TRIP HAZARDS ITB No. 2023-36R The Town of Miami Lakes Council: Mayor Manny Cid Vice Mayor Carlos O. Alvarez Councilmember Luis E. Collazo Councilmember Josh Dieguez Councilmember Tony Fernandez Councilmember Ray Garcia Councilmember Marilyn Ruano Edward Pidermann, Town Manager The Town of Miami Lakes 6601 Main Street Miami Lakes, Florida 33014 Date Advertised August 31, 2023 Bids Due 11:00 AM EST, September 21, 2023 Repair of Sidewalk Trip Hazards Bid No. 2023-36R Repair of Sidewalk Trip Hazards ITB 2023-36R Table of Contents Section A. NOTICE TO BIDDERS ........................................................................................................... 6 Section B. INSTRUCTIONS TO BIDDERS ............................................................................................... 8 B1 DEFINITION OF TERMS ........................................................................................................................................ 8 B2 BID PROCESS ........................................................................................................................................................ 9 B2.01 GENERAL REQUIREMENTS FOR BID PROCESS ............................................................................................ 9 B2.02 PREPARATION OF BID ............................................................................................................................... 10 B2.03 ESTIMATED QUANTITIES ........................................................................................................................... 10 B2.04 LINE-ITEM QUANTITIES ............................................................................................................................. 10 B2.05 ADDITIONAL LINE-ITEM PRICING .............................................................................................................. 10 B2.06 BID PREPARATION COSTS AND RELATED COSTS ...................................................................................... 10 B2.07 QUALIFICATION OF BIDDERS .................................................................................................................... 11 B2.08 EXAMINATION OF CONTRACT DOCUMENTS ........................................................................................... 11 B2.09 INTERPRETATIONS AND CLARIFICATIONS ................................................................................................ 11 B2.10 POSTPONEMENT OF BID OPENING DATE ................................................................................................. 11 B2.11 ACCEPTANCE OR REJECTION OF BIDS ....................................................................................................... 11 B2.12 WITHDRAWAL OF BID ............................................................................................................................... 12 B2.13 OPENING OF BIDS ..................................................................................................................................... 12 B2.14 LOCAL PREFERENCE .................................................................................................................................. 12 B2.15 TIE BIDS ..................................................................................................................................................... 12 B2.16 AWARD OF CONTRACT(S) ......................................................................................................................... 12 B2.17 BID PROTEST PROCESS .............................................................................................................................. 13 B2.18 EXECUTION OF CONTRACT ....................................................................................................................... 13 B3 REQUIRED FORMS & AFFIDAVITS ...................................................................................................................... 13 B3.01 COLLUSION ............................................................................................................................................... 13 B3.02 RELATIONSHIPS WITH THE TOWN AFFIDAVIT .......................................................................................... 13 B3.03 CONFLICT OF INTEREST/ANTI-KICKBACK .................................................................................................. 13 B3.04 PUBLIC RECORDS AFFIDAVIT..................................................................................................................... 14 B3.05 PUBLIC ENTITY CRIMES ACT ...................................................................................................................... 14 Repair of Sidewalk Trip Hazards Bid No. 2023-36R Section C. GENERAL TERMS & CONDITIONS ...................................................................................... 15 C1 GENERAL REQUIREMENTS ................................................................................................................................. 15 C1.01 GENERALLY ............................................................................................................................................... 15 C1.02 RULES AND REGULATIONS ........................................................................................................................ 15 C1.03 HOURS FOR PERFORMING WORK ............................................................................................................ 15 C1.04 SUBCONTRACTORS ................................................................................................................................... 15 C1.05 CONSULTANT SERVICES ............................................................................................................................ 16 C1.06 AUTHORITY OF THE PROJECT MANAGER ................................................................................................. 16 C1.07 INDEPENDENT CONTRACTOR ................................................................................................................... 17 C1.08 THIRD-PARTY BENEFICIARIES .................................................................................................................... 17 C1.09 ASSIGNMENT OR SALE OF CONTRACT ...................................................................................................... 17 C1.10 TIME FOR COMPLETION ........................................................................................................................... 17 C1.11 APPLICABLE LAW AND VENUE OF LITIGATION ......................................................................................... 17 C1.12 NON-EXCLUSIVE CONTRACT ..................................................................................................................... 17 C1.13 SEVERABILITY ............................................................................................................................................ 18 C1.14 CONTRACT DOCUMENTS CONTAIN ALL TERMS ....................................................................................... 18 C1.15 ENTIRE AGREEMENT ................................................................................................................................. 18 C1.16 INTENTION OF THE TOWN ........................................................................................................................ 18 C1.17 PRIORITY OF PROVISIONS ......................................................................................................................... 18 C1.18 ROYALTIES AND PATENTS ......................................................................................................................... 19 C1.19 PURCHASE AND DELIVERY, STORAGE, AND INSTALLATION ..................................................................... 19 C1.20 VEHICLES & EQUIPMENT .......................................................................................................................... 19 C1.21 SUBSTITUTIONS ........................................................................................................................................ 19 C1.22 OWNERSHIP OF THE WORK ...................................................................................................................... 19 C1.23 TOWN LICENSES, PERMITS AND FEES ....................................................................................................... 20 C1.24 TAXES ........................................................................................................................................................ 20 C1.25 REMOVAL OF UNSATISFACTORY PERSONNEL .......................................................................................... 20 C1.26 DEFECTIVE OR NON-COMPLIANT WORK .................................................................................................. 20 C1.27 COMPLIANCE WITH APPLICABLE LAWS .................................................................................................... 21 C1.28 NONDISCRIMINATION, EQUAL EMPLOYMENT OPPORTUNITY, & ADA .................................................... 21 C1.29 NOTICES .................................................................................................................................................... 21 C2 INDEMNITY & INSURANCE ................................................................................................................................. 22 Repair of Sidewalk Trip Hazards Bid No. 2023-36R C2.01 INDEMNIFICATION .................................................................................................................................... 22 C2.02 CONTRACTOR’S RESPONSIBILITY FOR DAMAGES TO THE WORK ............................................................. 22 C2.03 DEFENSE OF CLAIMS ................................................................................................................................. 23 C2.04 INSURANCE ............................................................................................................................................... 23 C3 PUBLIC RECORDS ............................................................................................................................................... 25 C3.01 ACCESS, REVIEW AND RELEASE OF RECORDS ........................................................................................... 25 C4 CONTRACT MODIFICATION AND DISPUTE PROCESS ......................................................................................... 25 C4.01 CHANGE ORDERS ...................................................................................................................................... 25 C4.02 FORCE MAJEURE ....................................................................................................................................... 26 C4.03 EXTENSION OF TIME ................................................................................................................................. 27 C4.04 EXCUSABLE DELAY, NON-COMPENSABLE ................................................................................................. 28 C4.05 CLAIMS ...................................................................................................................................................... 28 C4.06 CONTINUING THE WORK .......................................................................................................................... 29 C4.07 FRAUD AND MISREPRESENTATION .......................................................................................................... 29 C4.08 STOP WORK ORDER .................................................................................................................................. 29 C4.09 MATERIALITY AND WAIVER OF BREACH ................................................................................................... 30 C4.10 TIME IN WHICH TO BRING ACTION AGAINST THE TOWN ........................................................................ 30 C4.11 CONTRACT EXTENSION ............................................................................................................................. 30 C5 EARLY TERMINATION & DEFAULT ...................................................................................................................... 30 C5.01 SET-OFFS, WITHOLDING, AND DEDUCTIONS ............................................................................................ 30 C5.02 CONTRACTOR DEFAULT ............................................................................................................................ 30 C5.03 TERMINATION FOR CONVENIENCE........................................................................................................... 31 C5.04 REMEDIES AVAILABLE TO THE TOWN ....................................................................................................... 32 C5.05 FUNDS AVAILABILITY ................................................................................................................................ 32 C6 PAYMENT PROCESS............................................................................................................................................ 32 C6.01 COMPENSATION ....................................................................................................................................... 32 C6.02 ESTIMATED QUANTITIES ........................................................................................................................... 33 C6.03 LINE-ITEM PRICING ................................................................................................................................... 33 C6.04 LINE-ITEM QUANTITIES ............................................................................................................................. 33 C6.05 ADDITIONAL LINE-ITEM PRICING .............................................................................................................. 33 C6.06 REIMBURSIBLE EXPENSES ......................................................................................................................... 33 Section D. SPECIAL TERMS & CONDITIONS ........................................................................................ 35 Repair of Sidewalk Trip Hazards Bid No. 2023-36R D1 OVERVIEW ......................................................................................................................................................... 35 D2 SCOPE OF WORK ................................................................................................................................................ 35 D2.01 SURVEY SPECIFICATIONS .......................................................................................................................... 35 D2.02 CONCRETE CUTTING SPECIFICATIONS ...................................................................................................... 35 D2.03 LIMITATIONS ............................................................................................................................................. 36 D2.04 METHOD OF MEASUREMENT ................................................................................................................... 36 D2.05 LOCATION OF WORK ................................................................................................................................ 36 D3 CONTRACT TERM ............................................................................................................................................... 37 D4 COMPENSATION ................................................................................................................................................ 37 D5 GENERAL REQUIREMENTS ................................................................................................................................. 37 D5.01 HURRICANE PREPAREDNESS .................................................................................................................... 37 D5.02 INSPECTION OF THE WORK ...................................................................................................................... 37 D5.03 UNCOVERING FINISHED WORK ................................................................................................................ 38 D6 PRELIMINARY STEPS .......................................................................................................................................... 38 D6.01 CONTRACTOR’S PRE-START REPRESENTATION ........................................................................................ 38 D6.02 PRE-CONSTRUCTION CONFERENCE .......................................................................................................... 38 D6.03 PROJECT SCHEDULE .................................................................................................................................. 38 D6.04 SCHEDULE OF VALUES .............................................................................................................................. 39 D6.05 CONSTRUCTION PHOTOGRAPHS .............................................................................................................. 39 D6.06 STAGING SITE ............................................................................................................................................ 39 D6.07 PROJECT SIGNAGE .................................................................................................................................... 40 D6.08 COORDINATION WITH TOWN RESIDENTS ................................................................................................ 40 D7 SITE ISSUES ........................................................................................................................................................ 40 D7.01 SITE INVESTIGATION AND REPRESENTATION ........................................................................................... 40 D7.02 METHOD OF PERFORMING THE WORK .................................................................................................... 41 D7.03 DIFFERING SITE CONDITIONS ................................................................................................................... 42 D7.04 PROTECTION OF PROPERTY, UTILITIES, AND THE PUBLIC ........................................................................ 42 D7.05 CONTRACTOR’S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE .............................................. 42 D7.06 ACCESS TO WATER AND UTILITIES ........................................................................................................... 43 D7.07 COORDINATION OF THE WORK ................................................................................................................ 43 D7.08 ACCESS TO THE PROJECT SITE(S) .............................................................................................................. 44 D7.09 CLEANING UP; TOWN’S RIGHT TO CLEAN UP ........................................................................................... 44 Repair of Sidewalk Trip Hazards Bid No. 2023-36R D7.10 SANITARY PROVISIONS ............................................................................................................................. 44 D7.11 MAINTENANCE OF TRAFFIC ...................................................................................................................... 44 D8 SAFETY ISSUES ................................................................................................................................................... 45 D8.01 SAFETY PRECAUTIONS .............................................................................................................................. 45 D8.02 TRENCH SAFETY ACT ................................................................................................................................. 45 D8.03 MATERIAL SAFETY DATA SHEETS .............................................................................................................. 46 D9 PLANS, DOCUMENTS, & RECORDS .................................................................................................................... 46 D9.01 CONTRACTOR TO CHECK PLANS, SPECIFICATIONS, & DATA .................................................................... 46 D9.02 SHOP DRAWINGS AND SUBMITTALS ........................................................................................................ 46 D9.03 TOWN FURNISHED DRAWINGS, SUPPLEMENTAL DRAWINGS, & INSTRUCTIONS ................................... 47 D9.04 AS-BUILT DRAWINGS ................................................................................................................................ 47 D9.05 RECORD SET .............................................................................................................................................. 48 D10 CONTRACTOR RESPONSIBILITIES ..................................................................................................................... 48 D10.01 LABOR & MATERIALS .............................................................................................................................. 48 D10.02 SUPERVISIONS OF THE WORK ................................................................................................................ 49 D10.03 RELEASE OF LIENS/SUBCONTRACTOR’S STATEMENT OF SATISFACTION ............................................... 49 D10.04 PROGRESS PAYMENTS ............................................................................................................................ 50 D10.05 OWNERSHIP OF THE WORK .................................................................................................................... 50 D11 LIQUIDATED DAMAGES ................................................................................................................................... 50 D12 REQUESTS FOR INFORMATION ....................................................................................................................... 51 D13 WARRANTY ...................................................................................................................................................... 51 D14 SUBSTANTIAL COMPLETION, PUNCHLIST & FINAL COMPLETION ................................................................... 52 D15 ACCEPTANCE AND FINAL PAYMENT ................................................................................................................ 52 D16 NDPES REQUIREMENTS ................................................................................................................................... 53 Section E. FORMS ..................................................................................... Error! Bookmark not defined. BID FORM ................................................................................................ Error! Bookmark not defined. Company Qualification Questionnaire ...................................................... Error! Bookmark not defined. CONTRACT EXECUTION FORM .................................................................. Error! Bookmark not defined. CORPORATE RESOLUTION ........................................................................ Error! Bookmark not defined. CORPORATE RESOLUTION ........................................................................ Error! Bookmark not defined. FORM CRL - CLIENT REFERENCE LETTER ................................................................... Error! Bookmark not defined. Repair of Sidewalk Trip Hazards Bid No. 2023-36R SECTION A. NOTICE TO BIDDERS ITB Name: Repair of Sidewalk Trip Hazards ITB No.: 2023-36R Bids Due: 11:00 AM EST, September 21, 2023 Solicitation Overview: The Town of Miami Lakes (the “Town”) will be accepting sealed Bids from qualified firms to provide sidewalk repair services (“Services”). The Town of Miami Lakes requires a licensed Contractor to inspect and repair sidewalk trip hazards in order to maintain the quality of the Town’s sidewalks and limit the Town’s liability for trip hazards. When the Town becomes aware of developing trip hazards, the Town will assess whether the damaged sidewalk flag is so extensive that it merits replacement of the whole flag, or if the flag can be salvaged through the process of sidewalk grinding. If the flag can be salvaged, the Town will utilize this Contract to repair trip hazards, returning the sidewalk flag to a safe condition. Bidders are to submit one (1) original and two (2) physical copies of their Bid, with original signatures together with one (1) additional virtual copy of the Bid on a Flash Drive. Sealed Bids, including the Flash Drive must be received by the Town of Miami Lakes, Town Clerk at 6601 Main Street, Miami Lakes, Florida no later than 11:00 AM EST on September 21, 2023, at which time the Bids will be opened. General Instructions: Bidders must carefully review all the materials contained herein and prepare their Bids accordingly. The detailed requirements set forth below will be used to evaluate the Bids and failure of a Bidder to provide the information requested for a specific requirement may render their Bid non-responsive and will result in rejection. Copies of the ITB will only be made available on the Town’s website, Public Purchase, and the Onvia DemandStar (“DemandStar”) website. Copies of the ITB, including all related documents can be obtained by visiting the Town’s website at http://www.miamilakes-fl.gov/, under Current Solicitations on the Procurement Department page, on Public Purchase at www.publicpurchase.com, or on DemandStar’s website at www.demandstar.com. If you use Public Purchase or DemandStar, it is strongly recommended that you register with them to receive notifications about this solicitation. Minimum Requirements to Submit a Response: To be eligible for award of this project, bidders must: 1. Possess a minimum of five (5) years of experience performing sidewalk trip hazard repair projects; 2. Must provide at least three (3) verifiable client references for successful completion of three (3) distinct sidewalk repair contracts with other public agencies of similar scope and value performed within the last five (5) years utilizing Form CRL – Client Reference Letter; and 3. Possess a valid certified license as a General Contractor from the State of Florida, or a Certificate of Competency from the Miami-Dade County’s Construction Trade Qualifying Board as a General Engineering Contractor or a Specialty Engineering Contractor. The Town will consider a Bid as responsive where a Bidder has less than the stipulated minimum number of years of experience solely where the Bidder has undergone a name change and such change of name has been filed with the State of Florida. Pursuant to subsection (t) “Cone of Silence” of Section 2-11.1 “Conflict of Interest and Code of Ethics Ordinance” of Miami Dade County, public notice is hereby given that a “Cone of Silence” is imposed concerning this solicitation. The “Cone of Silence” prohibits certain communications concerning the substance of RFP’s, RFQ’s or Bids, until such time as the Town Manager makes a written recommendation to the Town Council concerning the solicitation. Any questions concerning the substance of this, or any other solicitation advertised by the Town must Repair of Sidewalk Trip Hazards Bid No. 2023-36R be submitted in writing to procurement@miamilakes-fl.gov while the Cone of Silence is in effect. No other communications, oral or otherwise, will be accepted. Failure to comply with the Cone of Silence may result in the rejection of a Submittal. For additional information concerning the Cone of Silence please refer to Section 2-11.1 of Miami-Dade County Code. Repair of Sidewalk Trip Hazards Bid No. 2023-36R SECTION B. INSTRUCTIONS TO BIDDERS B1 DEFINITION OF TERMS 1. Award means that the Town Manager or Town Council, as applicable, has approved the award of a contract. 2. Bid means the Submittal tendered by a Bidder in response to this solicitation, which includes the price, authorized signature and all other information or documentation required by the Invitation to Bid (“ITB”) at the time of submittal. 3. Bid Form means the form that contains the goods or services to be purchased and that must be completed and submitted with the Bid. 4. Bidder means any person, firm or corporation, or its duly authorized representative tendering a Submittal in response to this solicitation. 5. Change Order means a written document ordering a change in the Contract price or Contract time or a material change in the Work. 6. Completion Time means the number of calendar days specified for Final Completion of the Project. 7. Cone of Silence means the time period and method of communications as required by Section 2- 11.1 of the Miami-Dade County Code, which state that the Cone of Silence shall be in effect from the date the ITB is issued until the Town Manager issues a written recommendation. 8. Consultant means a firm that has entered into a separate agreement with the Town for the provision of professional services. 9. Contract means the ITB, the addendum, and the Bid documents that have been executed by the Bidder and the Town subsequent to approval of award by the Town. 10. Contract Documents means the Contract as may be amended from time to time, and plans, specifications, addendum, clarifications, directives, Change Orders, payments, and other such documents issued under or relating to the Contract. 11. Contractor means the Successful Bidder who is issued a Purchase Order, Contract, Blanket Purchase Order agreement, or Term Contract to provide goods or services to the Town and who will be responsible for the acceptable performance of any Work and for the payment of all legal debts pertaining to the Work under the Contract. 12. Cure means the action taken by the Contractor promptly, after receipt of written notice from the Town of a breach of the Contract Documents, which must be performed at no cost to the Town, to repair, replace, correct, or remedy all material, equipment, or other elements of the Work or the Contract Documents affected by such breach, or to otherwise make good and eliminate such breach. 13. Cure Period means the period of time in which the Contractor is required to remedy deficiencies in the Work or compliance with the Contract Documents after receipt of a written Notice to Cure from the Town identifying the deficiencies and the time to Cure. 14. Days mean calendar days unless otherwise specifically stated in the Contract Documents. 15. Defective Work means (a) Work that is unsatisfactory, deficient, or damaged, does not conform to the Contract Documents, or does not meet the requirements of any inspection, test, or approval, or (b) Work associated with punch list items that the Contractor fails to complete within a reasonable time after issuance of the punch list by the Project Manager. 16. Design Documents, Plans or Sketch means any construction plans and specifications, or graphic representation included as part of the Contract. 17. Field Directive means a written directive to effect changes to the Work, issued by the Project Manager, Consultant or the Town Department Director that may affect the ITB Contract price or time. Repair of Sidewalk Trip Hazards Bid No. 2023-36R 18. Final Completion means the date the Contractor has completed all the Work and submitted all documentation required by the Contract Documents. 19. Inspector means an authorized representative of the Town assigned to make necessary inspections of materials furnished by Design-Build Firm and of the Work performed by the Contractor. The Town, at is sole discretion, may hire a professional consultant to perform the inspections. 20. Materials mean goods or equipment incorporated into the Work or used or consumed in the performance of the Work. 21. Notice of Award means any correspondence from the Town that informs the successful bidder of a contract award for this ITB. 22. Project means a task or series of tasks that the Contractor must complete in accordance with the Contract Documents. 23. Project Manager means the individual assigned by the Town Manager or designee to manage a Project. 24. Request for Information (RFI) means a request from the Contractor seeking an interpretation or clarification relative to the Contract Documents. The RFI, which must be clearly marked RFI, must clearly and concisely set forth the issue(s) or item(s) requiring clarification or interpretation and why the response is required. The RFI must set forth the Contractor’s interpretation or understanding of the document(s) in question, along with the reason for such understanding. 25. Responsive Bidder means the Bidder whose Bid conforms in all material respects to the terms and conditions included in the ITB. 26. Responsible Bidder means a Bidder who has the capability in all respects to perform in full the contract requirements, as stated in the ITB, and integrity and reliability that will assure good faith performance. 27. Subcontractor means a person, firm or corporation having a direct contract with Contractor, including one who furnishes material, equipment, or services necessary to perform the Work. 28. Submittal means the documents prepared and submitted by the Bidder in response to this ITB. 29. Substantial Completion means that point at which the Project is at a level of completion in substantial compliance with the Contract Documents and is fit for use in its intended purpose. Substantial Compliance will not be deemed to have occurred until any and all governmental entities, with regulatory authority or which have jurisdiction over the Work, have conducted all final inspections, and approved the Work. Beneficial use or occupancy will not be the sole factor in determining whether Substantial Completion has been achieved unless a temporary certificate of completion has been issued. 30. Town means the Town Council of the Town of Miami Lakes or the Town Manager, as applicable. 31. Town Manager means the duly appointed chief administrative officer of the Town of Miami Lakes or designee. 32. Unbalanced Bid means pricing that is not consistent with pricing in the industry or with market conditions and a comparison to the pricing submitted by other Bidders. 33. Work as used herein refers to all reasonably necessary and inferable labor, material, equipment, and services, whether or not specifically stated, to be provided by the Contractor to fulfill its obligations under the Contract Documents. B2 BID PROCESS B2.01 GENERAL REQUIREMENTS FOR BID PROCESS The ITB, Bid Form and any addendum that may be issued constitute the complete set of requirements for this ITB. The Bid Form page(s), and all forms contained in the ITB must be Repair of Sidewalk Trip Hazards Bid No. 2023-36R completed, signed, and submitted in accordance with the requirements of Section B. All Bids must be typewritten or filled in with pen and ink and must be signed in blue ink by an officer or employee having authority to bind the company or firm. Errors, corrections, or changes on any document must be initialed by the signatory of the Bid. Bidder will not be allowed to modify its Bid after the opening time and date. (i) Joint Venture or Teaming Agreements Joint venture firms or teaming agreements will not be considered for award under this ITB. B2.02 PREPARATION OF BID The Bid Form contains multiple line items, and the Bidder must provide prices for all line items and must provide the price for the total Bid amount. Failure to include pricing on all line items as well as the total Bid Amount will result in the Bid being found non-responsive. Bidder must use the blank Town forms provided herein. The Bid must be signed and acknowledged by the Bidder in accordance with the directions within this ITB. Failure to utilize or fully complete the Town’s forms may result in a determination that the Bid is non-responsive. A Bid will be considered non-responsive if it is conditioned on modifications, changes, or revisions to the terms and conditions of the ITB. All Bid prices are to include the furnishing of all labor, materials, equipment, all overhead/indirect expenses, and profit, necessary for the completion of the Work, except as may be otherwise expressly provided for in the Contract Documents. B2.03 ESTIMATED QUANTITIES The quantities stated on the Bid Form are solely estimates of what the Town anticipates its needs are for the initial year of the Contract. The stated quantities do not reflect the actual quantities to be ordered and the Town has not established any minimum quantities and no guarantee is expressed or implied as to the total quantity of Work to be issued to a Contractor. The Town reserves the right, at its sole discretion, to make adjustment to the number and/or location of the Bid items. The failure of the Town to order any minimum quantities does not form any basis for a claim by the Contractor for lost work or profits. B2.04 LINE-ITEM QUANTITIES The estimated quantities will be used solely for bid comparison purposes for the Town to determine the lowest responsive and responsible. No guarantee is expressed or implied as to the total quantity of Work to be issued to a Contractor. B2.05 ADDITIONAL LINE-ITEM PRICING The Town reserves the right to request price quotes for additional items not contained in the initial award. Should the Town add any additional line items the Town will do so through the Change Order process. B2.06 BID PREPARATION COSTS AND RELATED COSTS All costs involved in the preparation and submission of a Bid to the Town, or any work performed in connection therewith is the sole responsibility of the Bidder(s). No payment will be made for any Bid received, or for any other effort required of or made by the Bidder prior to commencement of Work as defined by any contract duly approved by the Town Council or Town Manager. The Town will bear no responsibility for any cost associated with any judicial proceedings resulting from the ITB process. Repair of Sidewalk Trip Hazards Bid No. 2023-36R B2.07 QUALIFICATION OF BIDDERS Bidder, by virtue of submitting its Bid, certifies that it is qualified and capable of performing the Work required under the Contract. To qualify for award, Bidder must meet the minimum qualification requirements stated in Section A. Bidders must complete the attached Questionnaire Form and include it with their Bid. Failure to complete and submit this form or to meet the minimum qualifications will result in the Bid being deemed non-responsive. The Town may at its sole discretion allow a Bidder to amend an incomplete Questionnaire during the evaluation process provided that the Bidder has included the Questionnaire in its Bid. B2.08 EXAMINATION OF CONTRACT DOCUMENTS It is the responsibility of each Bidder, before submitting a Bid in response to this ITB to: a. Carefully review the ITB, including any Addendum and notify the Town of any conflicts, errors, or discrepancies. b. Take into account federal, state and local, including, without limitation, the Town’s Code, and Miami-Dade County and the State of Florida’s statutes laws, rules, regulations, and ordinances that may affect a Bidder’s ability to perform the Work. c. Study and carefully correlate Contractor's observations with the requirements of the ITB. The submission of a Bid in response to this solicitation constitutes an incontrovertible representation by Bidder that it will comply with the requirements of the Contract Documents and that without exception, the Bid is premised upon performing and furnishing the Work required under the Contract Documents and that the Contract Documents are sufficient in detail to indicate and convey understanding of all terms and conditions for the performance of the Work. B2.09 INTERPRETATIONS AND CLARIFICATIONS All questions about the meaning or intent of the ITB must be directed in writing and submitted by e-mail to the Procurement Office, at procurement@miamilakes-fl.gov. Interpretation or clarifications considered necessary by the Town in response to such questions will be issued by means of an addendum. All addenda will be posted on the Town’s website, Public Purchase, and DemandStar. It is the sole responsibility of the Bidder to obtain all addenda by visiting the Town’s website. Written questions must be received no less than ten (10) days prior to bid opening. Only questions answered by written addenda will be binding. Verbal interpretation or clarifications will be without legal effect. B2.10 POSTPONEMENT OF BID OPENING DATE The Town reserves the right to postpone the date for receipt and opening of Bids and will make a reasonable effort to give at least five (5) calendar days’ notice prior to the Bid opening date of any such postponement to prospective Bidders. Any such postponement will be announced through the issuance of an addendum posted to the Town’s website. B2.11 ACCEPTANCE OR REJECTION OF BIDS The Town reserves the right to reject any and all Bids, with or without cause, to waive technical errors and informalities, or to cancel or re-issue this solicitation. The Town also reserves the right to reject the Bid of any Bidder who has failed to previously perform under a contract or who is in arrears to the Town. (i) Unbalanced Bids The Town reserves the right to reject any Bid where the line-item pricing is determined to be unbalanced. Such determination will be made at the sole discretion of the Town. An Unbalanced Bid price, which will be determined at the sole discretion of the Town, includes, but Repair of Sidewalk Trip Hazards Bid No. 2023-36R is not limited to, pricing that is not consistent with pricing in the industry or with market conditions and a comparison to the pricing submitted by other Bidders. An Unbalanced Bid typically occurs where the prices for one or more line items are too low a price to cover the actual cost to perform the Work (including overhead and profit) or too high a price where excessive profit will occur. B2.12 WITHDRAWAL OF BID Bidder warrants, by virtue of bidding, that its Bid and the prices quoted in its Bid are firm and irrevocable for acceptance by the Town for a period of one hundred twenty (120) calendar days from the date of the Bid submittal deadline. Bidder may change or withdraw its Bid prior to the Bid submittal deadline. All changes or withdrawals must be made in writing to the Town Clerk. Oral/Verbal modifications will not be valid. Once the Town makes an Award, the Bid cannot be withdrawn. B2.13 OPENING OF BIDS Bids will be publicly opened at the appointed time and place stated in the ITB and the names of the Bidders will be announced. The Town at its sole option may read the Bid prices. Late Bids will not be opened. Town staff is not responsible for the premature opening of a Bid if the Bid is not properly sealed, addressed and labeled. Bidders or their authorized agents are invited to be present at the Bid opening. Any additional information on the Bid Submittals will be made available in accordance with Florida Statute 119.071, Paragraph (b) of subsection (1), item 2, as amended. Review of the Bid Submittals by Town staff will determine the lowest responsive and responsible Bidder(s). B2.14 LOCAL PREFERENCE This ITB is subject to local preference under Section 13 of Town Ordinance 17-203. In order to qualify, Bidders seeking preference must submit the Local Vendor Preference Certification Form with all required supporting documentation. The Local Vendor Preference Certification Form can be found on the Town’s website at Town of Miami Lakes - Growing Beautifully - Local Preference (miamilakes-fl.gov). B2.15 TIE BIDS Preference shall be given to businesses with Drug-Free Workplace programs. Whenever two (2) or more bids which are equal in price, the Award will be determined in accordance with Florida Statute 287.133(2)(a), the Drug-Free Workplace Act. Where tie Bids still exist, the Award will be made to one of the Bidders at the sole discretion of the Town Manager. B2.16 AWARD OF CONTRACT(S) The Town anticipates awarding a contract to the lowest responsive and responsible Bidder(s) that is in the best interest of the Town. The Town may require demonstration of competency and, at its sole discretion, conduct site visit(s) and inspections of the Bidder’s place of business, require the Bidder to furnish documentation or require the Bidder to attend a meeting to determine the Bidder’s qualifications and ability to meet the terms and conditions of this Contract. The Town will consider, but not be limited to, such factors as financial capability, labor force, equipment, experience, knowledge of the trade work to be performed, the quantity of Work being performed by the Contractor and past performance on Town and other contracts. In no case will the Award be made until all necessary investigations have been made into the responsibility of the Bidder and the Town is satisfied that the Bidder(s) is qualified to perform the Work. Repair of Sidewalk Trip Hazards Bid No. 2023-36R B2.17 BID PROTEST PROCESS Any Bidder wishing to file a protest as to the requirements or award of this ITB must do so in accordance with Town Ordinance 17-203, Section 16, which is available at Town of Miami Lakes - Growing Beautifully - Home (miamilakes-fl.gov). B2.18 EXECUTION OF CONTRACT The Bidder(s) must complete and sign the Contract Execution Form, Form CE, and include it in its Bid. The Contract Execution Form must be signed by an individual authorized to sign on behalf of the Bidder(s). The Bidder must submit proof of signing authority in the form of the Certificate of Authority form included with this ITB, or another properly executed instrument that demonstrates signing authority such as a Corporate Resolution. The Town will execute a Contract with the Bidder(s) selected to provide the work requested herein (the “Successful Bidder(s)”) within sixty (60) days of an award authorization from the Town Council, or the Town Manager’s concurrence with Procurement’s recommendation where applicable (See Town Ordinance 17- 203, as amended from time to time, for guidance on the Town Manager’s signing authority). B3 REQUIRED FORMS & AFFIDAVITS B3.01 COLLUSION Where two (2) or more related parties, as defined in this Article, each submit a response to an ITB, such submissions will be presumed to be collusive. The foregoing presumption may be rebutted by the presentation of evidence as to the extent of ownership, control, and management of such related parties in preparation and submission under such ITB. Related parties means employees, officers or the principals thereof which have a direct or indirect ownership interest in another firm or in which a parent company or the principals thereof of one Bidder have a direct or indirect ownership interest in another Bidder for the same project. ITB responses found to be collusive will be rejected. Bids must be developed independently. Where two or more Bidders have worked together, discussed the details of their bids prior to submission of their Bids or worked together in independently submitting Bids such actions will be deemed to be collusion. B3.02 RELATIONSHIPS WITH THE TOWN AFFIDAVIT The Bidder must identify any relationship the owners or employees have with the Town’s elected officials or staff using the Relationships with the Town affidavit found in Section H, Required Attachments. B3.03 CONFLICT OF INTEREST/ANTI-KICKBACK Bidder must complete and submit the Conflict of Interest, Anti-Kickback and Proposer’s Relationships to the Town Affidavits found in Section H, Required Attachments, in its Bid. Bidder certifies that its Bid is made independently of any assistance or participation from any Town employee, elected official, or contractor working for or on behalf of the Town, who assisted in any aspect with the development, evaluation, or award if this or any solicitation issued by the Town. Town employees may not contract with the Town through any corporation, or business entity in which they or their immediate family members hold a controlling financial interest (e.g., ownership of five (5) percent or more). Immediate family members, including spouse, parents, and children are also prohibited from contracting with the Town without the prior approval of the Town Council. Miami-Dade County Ordinance 2-11.1, Conflict of Interest & Code of Ethics ordinance or the provisions of Chapter 112, Part III, Fla. Stat., Code of Ethics for Public Officers, and Employees, as applicable and as amended are hereby included into and made a part of this solicitation. Repair of Sidewalk Trip Hazards Bid No. 2023-36R B3.04 PUBLIC RECORDS AFFIDAVIT The Town shall comply with the Public Records Law as provided by Chapter 119, Florida Statutes, and all applicable amendments. Applicants must invoke the exemptions to disclosure provided by law in the response to the solicitation and must identify the data or other materials to be protected by separate envelope and must state the reasons why such exclusion from public disclosure is necessary. The submission of a response authorizes release of your firm’s credit data to the Town. All prospective Bidders must complete and submit the Compliance with Public Records Law affidavit with their Bid. Failure to submit the completed affidavit may result in the Bid being deemed non-responsive. Bidders, by submitting the Compliance with Public Records Law affidavit, specifically acknowledge their obligation to comply with
0701, Florida Statutes. B3.05 PUBLIC ENTITY CRIMES ACT In accordance with the Public Entity Crimes Act, (
133, Florida Statutes) a person or affiliate who is a contractor, who had been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the Town, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases or real property to the Town, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with the Town in excess of the threshold amount provided in
917, Florida Statutes, for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. Violation of this section by the Contractor will result in rejection of the Bid, termination of the contract, and may cause Contractor debarment. END OF SECTION Repair of Sidewalk Trip Hazards Bid No. 2023-36R SECTION C. GENERAL TERMS & CONDITIONS C1 GENERAL REQUIREMENTS C1.01 GENERALLY The employee(s) of the Contractor will be considered to be at all times its employee(s), and not employee(s) or agent(s) of the Town or any of its departments. The Contractor agrees that the Contractor will at all times employ, maintain and assign to the performance of the Contract a sufficient number of competent and qualified professionals and other personnel to meet the requirements of the Work to be performed. The Contractor agrees to adjust staffing levels or to replace any staff personnel if so requested by the Town Manager or designee, should the Town Manager or designee make a determination that said staffing is unacceptable or that any individual is not performing in a manner consistent with the requirements for such a position. The Contractor represents that its staff personnel have the proper skills, training, background, knowledge, experience, rights, authorizations, integrity, character, and licenses necessary to perform the Work, in a competent and professional manner. The Contractor must at all times cooperate with the Town, or the Consultant (if any) and coordinate its respective Work efforts to most effectively and efficiently progress the performance of the Work. The Town, the Consultant (if any) and other agencies authorized by the Town, must have full access to the Project site at all times. The apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished, will be regarded as meaning that only best practices are to prevail and only materials and workmanship of the best quality are to be used in the performance of the Work. C1.02 RULES AND REGULATIONS The Contractor must comply with all laws and regulations applicable to provision of services specified in the Contract Documents. The Contractor must be familiar with all federal, state, and local laws, rules, regulations, codes, and ordinances that affect the Work. Where portions of the Work traverse or cross federal, state, county or local highways, roads, streets, or waterways, and the agency in control of such property has established standard specifications, rules or regulations governing items of Work that differ from these specifications, the most stringent specifications, rules, and regulations will apply. C1.03 HOURS FOR PERFORMING WORK All Work must be performed in accordance with the Town’s Noise Ordinance No. 04-50 unless specifically stated otherwise herein or in a Work Order. Work to be performed outside these hours will require the prior written approval of the Project Manager. C1.04 SUBCONTRACTORS Contractor is solely responsible for all acts and omissions of its Subcontractors. Nothing in the Contract Documents creates any contractual relationship between any Subcontractor and the Town. Contractor is responsible for the timely payment of its Subcontractors and suppliers as required by Florida Statute Chapter 218.735. Failure to comply with these payment requirements will place the Contractor in default of the Contract. Repair of Sidewalk Trip Hazards Bid No. 2023-36R Contractor must not employ any subcontractor against whom Town may have a reasonable objection. Contractor must utilize the Subcontractors identified in their Bid submission. The replacement, addition, or deletion of any Subcontractor(s) will be subject to the prior written approval of the Project Manager. Bidders that will be using a temporary labor company to provide staffing for the Project must complete the Leased Employees Affidavit Form and include it with their Bid. Failure to include this form may result in the Bid being rejected as non-responsive. C1.05 CONSULTANT SERVICES The Town, at its sole discretion, may hire a Consultant who may serve as the Town’s representative for the Contract. Where a Consultant has been identified, the Consultant and the Project Manager will both have authority to act on behalf of the Town to the extent provided for in the Contract Documents, and where such authority has been delegated in writing by the Town Manager. C1.06 AUTHORITY OF THE PROJECT MANAGER The Town Manager hereby authorizes the Project Manager to determine, all questions of any nature whatsoever arising out of, under or in connection with, or in any way relating to or on account of the Work, and questions as to the interpretation of the Work to be performed under the Contract Documents. The Project Manager may delegate some of the authority contained in this Article to a designee. The Contractor is bound by all determinations or orders of the Project Manager and must promptly respond to requests of the Project Manager, including the withdrawal or modification of any previous order, and regardless of whether the Contractor agrees with the Project Manager’s determination or requests. Where requests are made orally, the Project Manager will follow up in writing, as soon thereafter as is practicable. The Project Manager and/or designee shall have authority to act on behalf of the Town to the extent provided for by the Contract Documents, unless otherwise modified in writing by the Town. All instructions to the Contractor will be issued in writing through the Town Manager, Project Manager, or designee. The Project Manager will not be responsible for the means, methods, techniques, sequences, or procedures employed, or for safety precautions and programs in connection with the Work and will not be responsible for the Contractor’s failure to carry out the Work in accordance with the Contract Documents. All interpretations and recommendations of the Project Manager and Consultant will be consistent with the intent of the Contract Documents. Interpretation of the Contract terms and conditions will be issued by the Town’s Procurement Manager. The Project Manager and/or designee will have authority to reject Work that does not conform to the Contract Documents. Whenever, in their opinion, it is considered necessary or advisable to ensure the proper completion of the Work the Project Manager or Consultant have authority to require special inspections or testing of the Work, whether or not such Work is fabricated, installed or completed. The Project Manager’s authority to act under this paragraph, or any decision made in good faith either to exercise or not to exercise such authority, shall not give rise to any duty or responsibility of the Project Manager owed to the Contractor, any subcontractor, supplier or any of their agents, employees, or any other person performing any of the Work. Repair of Sidewalk Trip Hazards Bid No. 2023-36R The Project Manager is not responsible for the acts or omissions of the Contractor, any Subcontractor, or any of their agents or employees, or any other persons performing any of the Work. C1.07 INDEPENDENT CONTRACTOR The Contractor is engaged as an independent business and agrees to perform Work as an independent contractor. In accordance with the status of an independent contractor, the Contractor covenants and agrees that the Contractor will conduct business in a manner consistent with that status, that the Contractor will not claim to be an officer or employee of the Town for any right or privilege applicable to an officer or employee of the Town, including, but not limited to: worker’s compensation coverage; unemployment insurance benefits; social security coverage; retirement membership, or credit. C1.08 THIRD-PARTY BENEFICIARIES Neither Contractor nor Town intends to directly or substantially benefit a third party by this Contract. Therefore, the parties agree that there are no third-party beneficiaries to this Contract and that no third party will be entitled to assert a claim against either of them based upon this Contract. C1.09 ASSIGNMENT OR SALE OF CONTRACT The performance of this Contract will not be transferred pledged, sold, delegated, or assigned, in whole or in part, by the Contractor without the prior written consent of the Town. It is understood that a sale of the majority of the stock or partnership shares of the Contractor, a merger or bulk sale, an assignment for the benefit of creditors will each be deemed transactions that would constitute an assignment or sale hereunder. The Town may request any information it deems necessary to review any request for assignment or sale of the Contract. The Contractor must notify the Project Manager prior to any Assignment of the Contract, which must be approved by the Town for the transfer of the Contract. The Town may, at its sole discretion, elect not to approve the transfer of the Contract, which will result in the Contract being terminated in accordance with the Termination for Convenience provision of the Contract. Any transfer without Town approval will be cause for the Town to terminate this Contract for default and the Contractor will have no recourse from such termination. Nothing herein will either restrict the right of the Contractor to assign monies due to, or to become due or be construed to hinder, prevent, or affect any assignment by the Contractor for the benefit of its creditors, made pursuant to applicable law. C1.10 TIME FOR COMPLETION Time is of the essence with regard to completion of the Work to be performed under the Contract. Delays and extensions of time may be allowed only in accordance with the provisions of the Contract. The time allowed for completion is provided for in the Special Terms & Conditions. C1.11 APPLICABLE LAW AND VENUE OF LITIGATION This Contract will be enforceable in Miami-Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions the sole venue will be Miami-Dade County, Florida. C1.12 NON-EXCLUSIVE CONTRACT This Contract shall not be deemed to create an exclusive relationship between the Town and the Contractor(s). The Town, in its sole discretion, reserves the right to perform, solicit or employ other parties or its own staff to perform Work or Services comparable to those covered herein. Repair of Sidewalk Trip Hazards Bid No. 2023-36R C1.13 SEVERABILITY In the event any provision of the Contract Documents is determined by a Court of competent jurisdiction to be illegal or unenforceable, then such unenforceable or unlawful provision will be excised from this Contract, and the remainder of the Contract Documents will continue in full force and effect. Notwithstanding the foregoing, if the result of the deletion of such provision will materially and adversely affect the rights of either party, such party may elect, at its option, to terminate the Contract in its entirety. An election to terminate the Contract based upon this provision must be made within seven (7) calendar days after the finding by the Court becomes final. C1.14 CONTRACT DOCUMENTS CONTAIN ALL TERMS The Contract Documents and all documents incorporated herein by reference contain all the terms and conditions agreed upon by the parties hereto, and no other agreement, oral or otherwise, regarding the subject matter of the Contract Documents will be deemed to exist or to bind any of the parties hereto, or to vary any of the terms contained herein. C1.15 ENTIRE AGREEMENT The Contract Documents, as they may be amended from time to time, represent the entire and integrated Contract between the Town and the Contractor and supersede all prior negotiations, representations, or agreements, written or oral. This Contract may not be amended, changed, modified, or otherwise altered in any respect, at any time after the execution hereof, except by a written document executed with the same formality and equal dignity herewith. Waiver by either party of a breach of any provision of the Contract Documents will not be deemed to be a waiver of any other breach of any provision of the Contract Documents. C1.16 INTENTION OF THE TOWN It is the intent of the Town to describe in the ITB the Work to be completed in accordance with all codes and regulations governing all the Work to be performed under this Contract. Any work, labor, materials and/or equipment that may reasonably be inferred from the Contract as being required to produce the intended results must be supplied by Contractor whether or not specifically called for in the Contract Documents. Where words, which have well-known technical or trade meanings are used to describe Work, materials or equipment, such words will be interpreted in accordance with that meaning. Reference to standard specifications, manuals, or codes of any technical society, organization, or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, will mean the latest standard specification, manual, code or laws or regulations in effect at the time of opening of Bids and Contractor must comply therewith. Town will have no duties other than those duties and obligations expressly set forth within the Contract Documents. C1.17 PRIORITY OF PROVISIONS If there is a conflict or inconsistency between any term, statement requirement, or provision of any exhibit attached hereto, any document or events referred to herein, or any document incorporated into the Contract Documents by reference and a term, statement, requirement, the specifications or any plans, or provision of the Contract Documents the following order of precedence will apply: 1. In the event of conflicts in the Contract Documents the priorities stated below will govern; 2. Revisions and Change Orders to the Contract will govern over the Contract; 3. The Contract Documents will govern over the Contract; 4. The Special Conditions will govern over the General Conditions of the Contract; and 5. Addendum to an ITB will govern over the ITB. Repair of Sidewalk Trip Hazards Bid No. 2023-36R In the event that Drawings and specifications are provided with the Contract the priorities stated below will govern: 1. Scope of Work and Specifications will govern over Plans and Drawings; 2. Schedules, when identified as such will govern over all other portions of the Plans; 3. Specific notes will govern over all other notes, and all other portions of the Plans, unless specifically stated otherwise; 4. Larger scale drawings will govern over smaller scale drawings; 5. Figured or numerical dimensions will govern over dimensions obtained by scaling; and 6. Where provisions of codes, manufacturer’s specifications or industry standards are in conflict, the more restrictive, strict, or higher quality will govern. C1.18 ROYALTIES AND PATENTS All fees, royalties, and claims for any invention, or pretended inventions, or patent of any article, material, arrangement, appliance, or method that may be used upon or in any manner be connected with the Work or appurtenances, are hereby included in the prices stipulated in the Contract for said Work. C1.19 PURCHASE AND DELIVERY, STORAGE, AND INSTALLATION All materials must be F.O.B. delivered and included in the cost of the Work. The Contractor is solely responsible for the purchase, delivery, off-loading and installation of all equipment and material(s). Contractor must make all arrangement for delivery. Contractor is liable for replacing and damaged equipment or material(s) and filing any and all claims with suppliers. All transportation must comply with all federal, FDOT, Miami-Dade County, and Town rules and regulations. No materials will be stored on site without the prior written approval, using the appropriate Town form, by the Project Manager. The Town’s Forms are available on the Town’s website. C1.20 VEHICLES & EQUIPMENT Contractor must have on hand at all times clean and in good working order such vehicles, machinery, tools, accessories, and other items necessary to perform the Work under this Contract. The Town may require the repair or replacement of equipment as reasonably necessary. C1.21 SUBSTITUTIONS Substitution of any specified material or equipment requires the prior written acceptance of the Project Manager. It is the sole responsibility of the Contractor to provide sufficient information and documentation to the Project Manager to allow for a thorough review and determination on the acceptability of the substitution. Approval of a substitution does not waive or mitigate the Contractor’s sole responsibility to meet the requirements of the Contract Documents. The Town may require an adjustment in price based on any proposed substitution. The Contractor may request the Town to approve substitution where the specified materials are not available. Such requests must be submitted in writing to the Project Manager in advance with sufficient information to evaluate the substitution. The Contractor must provide the substitute materials plant designation, type, grade, quality, and size. Acceptance of substitutions will be at the sole discretion of the Town. The Town may require an adjustment in price based on any proposed substitution. C1.22 OWNERSHIP OF THE WORK The Contractor is solely responsible for all Work, until Final Completion of the Work. Contractor is liable for all damage, theft, maintenance, and safety until such time as the Town issues a notice of Final Completion of the Work. Repair of Sidewalk Trip Hazards Bid No. 2023-36R C1.23 TOWN LICENSES, PERMITS AND FEES In accordance with the Public Bid Disclosure Act, 218.80, Florida Statutes, each license, permit, or fee the Contractor will have to pay the Town before or during the Work or the percentage method or unit method of all licenses, permits and fees required by the Town and payable to the Town by virtue of the Work as part of the Contract are as follows: 1. Contractor must have and maintain during the term of this Contract all appropriate Town licenses. Fees for which must be paid in full in accordance with the Town’s Fee structure for such licenses. THERE WILL NOT BE ANY PERCENTAGE REDUCTION OR WAIVING OF TOWN LICENSE FEES. 2. During the performance of this Contract there may be times when the Contractor will be required to obtain a Town permit for such Work. It is the responsibility of the Contractor to ensure that he has the appropriate Town permits to perform such work as may become necessary during the performance of the Work. Any fees related to Town required permits in connection with this Contract will be the responsibility of the Contractor and will be reimbursed by the Town. Licenses, permits, and fees that may be required by County, State or Federal entities are not included in the above list. C1.24 TAXES Contractor must pay all applicable sales, consumer, use, and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. Contractor shall include all sales and other taxes for which it is liable in its Bid price. C1.25 REMOVAL OF UNSATISFACTORY PERSONNEL Contractor must at all times enforce strict discipline and good order among its employees and subcontractors at the Project(s) site(s) and must not employ on any Work any unfit person or anyone not skilled in the Work to which they are assigned. The Town may make written request to the Contractor for the prompt removal and replacement of any personnel employed or retained by the Contractor, or any or Subcontractor engaged by the Contractor to provide and perform services or Work pursuant to the requirements of the Contract Documents. The Contractor must respond to the Town within five (5) calendar days of receipt of such request with either the removal and replacement of such personnel or written justification as to why that may not occur. The Town will make the final determination as to the removal of unsatisfactory personnel from the Work. The Contractor agrees that the removal of any of such individual(s) does not require the termination or demotion of said individual(s). C1.26 DEFECTIVE OR NON-COMPLIANT WORK The Project Manager has the authority to reject or disapprove Work that is found to be defective or not in compliance with the requirements of the Contract. If required, the Contractor will promptly either correct all defective or non-compliant Work or remove such defective Work and replace it with non-defective/non-compliant Work. Contractor will bear all direct, indirect, and consequential costs of such removal or corrections. Re-examination of any of the Work may be ordered by the Project Manager and if so ordered, the Work must be uncovered by Contractor. If such Work is found to be in accordance with the Contract Documents, the Town will pay the cost of reexamination and replacement by means of a Change Order. If such Work is not in accordance with the Contract Documents, Contractor will pay such cost. Repair of Sidewalk Trip Hazards Bid No. 2023-36R Should Contractor fail or refuse to remove or correct any defective or non-compliant Work or to make any necessary repairs in accordance with the requirements of the Contract Documents within the time indicated in writing by the Project Manager, the Project Manager has the authority to cause the defective/non-compliant Work to be removed or corrected or make such repairs or corrections as may be necessary at Contractor's expense. Any expense incurred by the Town in making such removals, corrections, or repairs, will be paid for out of any monies due or which may become due the Contractor. In the event of failure of the Contractor to make all necessary repairs promptly and fully, the Town Manager or designee may declare the Contractor in default. If, within the warranty period required by the Contract Documents, or by any specific provision of the Contract, any of the Work is found to be defective or not in accordance with the Contract Documents, Contractor, after receipt of written notice from Town, must promptly correct such defective or nonconforming Work within the time specified by Town, without cost to Town. Should the Contractor fail to take such action the Town may take any necessary and appropriate action and hold the Contractor liable and responsible for all costs. The Town may take any action allowed under this Contract or in law to recover all such costs. Nothing contained herein will be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents, including but not limited to, any claim regarding latent defects. Failure to reject any defective Work or material does not, in any way, prevent later rejection when such defect is discovered, or obligate the Town to accept the defective Work. C1.27 COMPLIANCE WITH APPLICABLE LAWS The Contractor must comply with the most recent editions and requirements of all applicable laws, rule, regulations, codes, and ordinances of the Federal government, the State of Florida, Miami-Dade County, and the Town. C1.28 NONDISCRIMINATION, EQUAL EMPLOYMENT OPPORTUNITY, & ADA Contractor will not unlawfully discriminate against any person, will provide equal opportunities for employment, and comply with all applicable provisions of the Americans with Disabilities Act in its performance of the Work under the Contact. Contractor will comply with all applicable federal, State of Florida, Miami-Dade County, and Town rules regulations, laws, and ordinance as applicable. C1.29 NOTICES Whenever either party desires to give written notice to the other relating to the Contract, such must be addressed to the party for whom it is intended at the place specified below; and the place for giving the notice will remain until it has been changed by written notice in compliance with the provisions of this Article. Notice will be deemed given on the date received or within 3 days of mailing, if mailed through the United States Postal Service. Notice will be deemed given on the date sent via e-mail or facsimile. Notice will be deemed given via courier/delivery service upon the initial delivery date by the courier/delivery service. For the present, the parties designate the following as the respective places for giving of notice: For Town: Mr. Edward Pidermann Lorenzo Cobiella Town Manager Deputy Town Attorney Town of Miami Lakes Town of Miami Lakes 6601 Main Street 6601 Main Street Miami Lakes, Florida 33014 Miami Lakes, Florida 33014 Repair of Sidewalk Trip Hazards Bid No. 2023-36R pidermanne@miamilakes-fl.gov cobiellal@miamilakes-fl.gov For Contractor: Steven Sdankus President Florida Sidewalk Solutions 7051 SW 22nd Court Davie, FL 33317 crystal@floridasidewalksolutions.com Space intentionally left blank During the Work the Contractor must maintain continuing communications with designated Town representative(s). The Contractor must keep the Town fully informed as to the progress of the Work under the Contract. C2 INDEMNITY & INSURANCE C2.01 INDEMNIFICATION The Contractor must indemnify and hold harmless the Town, its officers, agents and employees from and against all liability, claims, damages, losses and expenses, including reasonable attorney's fees and costs at both trial and appellate levels arising out of or resulting from the performance of the Work under this Contract, caused by negligence, recklessness, intentional misconduct, or any act or omission of the Contractor or anyone directly or indirectly employed by Contractor or anyone for whose acts Contractor may be liable. The Contractor expressly understands and agrees that any insurance protection required by this Contract or otherwise provided by Contractor will in no way limit the responsibility to indemnify, keep and save harmless and defend the Town or its officers, employees, agents, and instrumentalities as herein provided. The Contractor agrees and recognizes that the Town will not be held liable or responsible for any claims which may result from any actions or omissions of the Contractor in which the Town participated either through review or concurrence of the Contractor's actions. In reviewing, approving or rejecting any submissions by the Contractor or other acts of the Contractor, the Town in no way assumes or shares any responsibility or liability of the Contractor or Subcontractor, under this Contract. The Contractor will defend the Town or provide for such defense at its own expense, at the Town’s option. This indemnification obligation will survive the expiration or termination of this Contract. The Town has provided specific consideration for the indemnification of $10.00 from the sums due to the Contractor under this Contract. C2.02 CONTRACTOR’S RESPONSIBILITY FOR DAMAGES TO THE WORK Contractor accepts full responsibility for Work against all losses or damages of whatever nature sustained until acceptance by Town Manager or designee, and must promptly repair or replace, at no additional cost to the Town any Work, materials, equipment, or supplies damaged, lost, stolen, or destroyed from any cause whatsoever. Contractor is full responsible for Work against all losses or damages of whatever nature sustained until acceptance by Town, and must promptly repair or replace, at no additional cost to the Town any Work, materials, equipment, or supplies damaged, lost, stolen, or destroyed from any cause whatsoever. Repair of Sidewalk Trip Hazards Bid No. 2023-36R C2.03 DEFENSE OF CLAIMS Should any claim be made, or any legal action brought in any way relating to the Work under the Contract, the Contractor will diligently render to the Town all assistance which the Town may require of the Contractor. C2.04 INSURANCE Without limiting any of the other obligations or liabilities of Contractor, the Contractor must secure and maintain throughout the duration of this Contract, insurance of such type and in such amounts necessary to protect its interest and the interest of the Town against hazards or risks of loss as specified below. The underwriter of such insurance must be qualified to do business in the State of Florida, be rated “B” as to management and “Class V” as to strength or better as rated by the latest edition of Best’s Insurance Guide, published by A.M. Best Company, Oldwick, New Jersey, or its equivalent, the insurance carrier must have agents upon whom service of process may be made in the State of Florida. The insurance coverage will be primary insurance with respect to the Town, its officials, employees, agents, and volunteers. Any insurance maintained by the Town will be in excess of the Contractor’s insurance and will not contribute to the Contractor’s insurance. The insurance coverages must include a minimum of: a. Worker’s Compensation and Employer’s Liability Insurance: Coverage to apply for all employees for statutory limits as required by the State of Florida’s Statutory Workers’ Compensation Law and all applicable Federal laws. The policy(ies) must include Employer’s Liability with minimum limits of $500,000 for each accident and a waiver of subrogation. b. Comprehensive Business Automobile and Vehicle Liability Insurance: This insurance must be written in comprehensive form and must protect the Contractor and the Town against claims for injuries to members of the public and/or damages to property of others arising from the Contractor’s use of motor vehicles or any other equipment and must cover operation with respect to onsite and offsite operations and insurance coverage must extend to any motor vehicles or other equipment irrespective of whether the same is owned, non-owned, or hired. The limit of liability must not be less than $500,000 per occurrence, combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a form no more restrictive than the latest edition of the Business Automobile Liability Policy, without restrictive endorsement, as filed by the Insurance Services Office. c. Commercial General Liability (“CGL”): This insurance must be written in comprehensive form and must protect the Contractor and the Town against claims arising from injuries to members of the public or damage to property of others arising out of any act or omission to act of the Contractor or any of its agents, employees, or subcontractors. The limit of liability must not be less than $1,000,000 per occurrence, combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a primary and non-contributory basis and with a coverage form no more restrictive than the latest edition of the Commercial General Liability Policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: (1) Premises and/or Operations; (2) Independent contractors and Products and/or completed Operations; (3) Broad Form Property Damage, Personal Injury and a Contractual Liability Endorsement, including any hold harmless and/or indemnification agreement. Repair of Sidewalk Trip Hazards Bid No. 2023-36R (1st) Products and/or Completed Operations for contracts with an Aggregate Limit of One Million Dollars ($1,000,000) per project. Contractor must maintain in force until at least three years after completion of all Work required under the Contract, coverage for Products and Completed Operations, including Broad Form Property Damage. (2nd) Personal and Advertising Injury with an aggregate limit of One Million Dollars ($1,000,000). (3rd) CGL Required Endorsements: a) Employees included as insured b) Contingent Liability/Independent Contractors Coverage c) Contractual Liability d) Waiver of Subrogation e) Premises and/or Operations f) Explosion, Collapse and Underground Hazards (if not specifically covered under the policy) g) Loading and Unloading h) Mobile Equipment (Contractor’s Equipment) whether owned, leased, borrowed, or rented by Contractor or employees of the Contractor. d. Certificate of Insurance Contractor must provide the Town Manager or designee with Certificates of Insurance for all required policies within fifteen (15) days of notification of a conditional award by the Town. The Certificates of Insurance must not only name the types of policy(ies) provided, but also must specifically cite this Contract and must state that such insurance is as required by this Contract. The Town reserves the right to require the Contractor to provide a certified copy of such policies, upon written request by the Town. Each policy certificate must be endorsed with a provision that not less than thirty (30) calendar days’ written notice must be provided to the Town before any policy or coverage is cancelled, restricted, or a material change is made. Acceptance of the Certificate(s) is subject to approval of the Town Manager or designee. e. Additional Insured The Town is to be specifically included as an Additional Insured for the liability of the Town resulting from operations performed by or on behalf of Contractor in performance of this Contract. The Town must be named as additional insured under the CGL, business automobile insurance and umbrella policies. Town must be named as an additional insured under Contractor’s insurance, including that applicable to the Town as an Additional Insured, must apply on a primary basis and any other insurance maintained by the Town will be in excess of and will not contribute to Contractor’s insurance. Contractor’s insurance must contain a severability of interest provision providing that, except with respect to the total limits of liability, the insurance must apply to each Insured or Additional Insured in the same manner as if separate policies had been issued to each. All deductibles or self-insured retentions must be declared to and be approved by the Town Manager. The Contractor will be responsible for the payment of any deductible or self-insured retention in the event of any claim. Repair of Sidewalk Trip Hazards Bid No. 2023-36R C3 PUBLIC RECORDS C3.01 ACCESS, REVIEW AND RELEASE OF RECORDS Town will have the right to inspect and copy, at Town’s expense, the books, records, and accounts of Contractor which relate in any way to the Contract. The Contractor agrees to maintain an accounting system that provides for accounting records that are supported with adequate documentation and adequate procedures for determining allowable costs. f. Public Records Bidder affirms, by virtue of bidding, that its Bid is a public record, and the public will have access to all documents and information pertaining to the bid and the solicitation, subject to the provisions of Chapter 119, Florida Statutes. Bidder acknowledges that the Town may provide public access to or provide copies of all documents subject to disclosure under applicable law. If the Project is funded by grants, either partially or fully, records will be made available to the granting agency in accordance with that agency’s requirements, when necessary. Bidder is responsible for claiming applicable exemptions to disclosure as provided by Chapter 119, Florida Statutes, in its Bid by identifying the materials to be protected and providing a reason for why such exclusion from public disclosure is necessary and legal. g. Retention and Transfer of Public Records Upon termination by the Town or final completion of the Contract the Contractor must, in accordance with
0701 of the Florida Statutes, transfer to the Town, at no cost, all public records in possession of the Contractor and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All public record stored electronically must be provided in .pdf format or another format acceptable to the Town. Any payments due the Contractor will not be made until the Town receives the public records. Failure to return such documents will result in the documents being subject Chapter 119 of the Florida Statutes The Contractor must comply with the applicable provisions of Chapter 119, Florida Statutes, and Town will have the right to immediately terminate this Contract for the refusal by the Contractor to comply with Chapter 119, Florida Statutes. The Contractor must retain all other records associated with this Contract for a period of five (5) years from the date of termination. Should the Contractor have any questions related to the application of Chapter 119, Florida Statutes, to the Contractor’s duty to provide public records relating to this Contract, contact the Town’s custodian of public records at the Office of the Town Clerk 6601 Main Street, Miami Lakes, Florida 33014 either in writing to by telephone at (305) 364-6100 or clerk@miamilakes-fl.gov. C4 CONTRACT MODIFICATION AND DISPUTE PROCESS C4.01 CHANGE ORDERS Without invalidating the Contract Documents, and without notice to any Surety, the Town reserves the right to make increases, decreases or other changes in the character or quantity of the Work under the Contract Documents as may be considered necessary or desirable to complete the Work in a manner satisfactory to the Town. The Town reserves the right to order changes which may result in additions to or reductions from the amount, type or value of the Work shown in the Contract, and which are within the general scope of the Contract Documents, Repair of Sidewalk Trip Hazards Bid No. 2023-36R and all such changes will be authorized only by a Change Order approved in advance and issued in accordance with provisions of the Town. The Contractor is required to provide the Project Manager with a detailed Change Proposal Request (“CPR”) or Request for Change Order (“RCO”), utilizing the Town’s standard form, which must include requested revisions to the Contract, including but not limited to adjustments in this Contract Price and Contract Time. The Contractor is required to provide sufficient data in support of the cost proposal demonstrating its reasonableness. In furtherance of this obligation, the Town may require that the Contractor submit any or all of the following: a cost breakdown of material costs, labor costs, labor rates by trade, and Work classification and overhead rates in support of Contractor's CPR/RCO. The Contractor’s CPR/RCO must include any schedule revisions and an explanation of the cost and schedule impact of the proposed change on the Project. If the Contractor fails to notify the Project Manager of any schedule changes associated with the proposed change, it will be deemed to be an acknowledgment by Contractor that the proposed work will not have any scheduling consequences. Any changes to the Contract must be contained in a written Change order, using the Town’s Change Order Form, executed by both parties. However, under circumstances determined necessary by the Town, a Change Order may be issued unilaterally by Town. In the event a satisfactory adjustment cannot be reached, and a Change Order has not been issued or time is of the essence, the Town reserves the right, at its sole option to direct the Contractor to proceed on a time and materials basis or make such arrangements as may be deemed necessary to complete the proposed additional Work. Where the Town directs the Contractor to proceed on a time and materials basis, Contractor must maintain detailed records of all labor and material costs for review by the Town. For all Change Orders the Contractor will be entitled to a combined profit and overhead rate for Change Orders that will not be in excess of ten (10%) percent inclusive of all direct/indirect costs including labor, material, and equipment costs, unless the Procurement Manager determines that the complexity and risk of the Change Order work is such that an additional factor is appropriate. The final amount to be paid to the Contractor for Change Order Work is subject to negotiation between the Town and the Contractor. Failure by the Contractor to proceed with Change Order Work when so directed by the Town Manager or designee may result in the Contractor being found in default of the Contract. Contractor must utilize the Town’s standard requests for change orders and change order forms unless otherwise specifically approved by the Town’s Procurement Manager. The Town’s Forms are available on the Town’s website. C4.02 FORCE MAJEURE Should any failure to perform on the part of Contractor be due to a condition of Force Majeure as that term is interpreted under Florida law, then, the Town may allow an extension of time reasonably commensurate with the cause of such failure to perform or cure. If the Contractor is delayed in performing any obligation under the Contract Documents due to a force majeure condition, the Contractor must request a time extension from the Town within two (2) working days of said Force Majeure occurrence. Any time extension will be subject to mutual agreement and will not be cause for any claim by the Contractor for extra compensation unless additional services are required by the Town. A Force Majeure event does not include inclement weather except for significant weather events that adversely impact the critical path of the Project Schedule, if required, or completion of the work, and does not include the acts or omissions of Subcontractors or suppliers. Repair of Sidewalk Trip Hazards Bid No. 2023-36R C4.03 EXTENSION OF TIME Any reference in this Article to the Contractor will be deemed to include suppliers, and permitted Subcontractors, whether or not in privity of contract with the Contractor for the purpose of this Article. If the Contractor is delayed at any time during the progress of the Work beyond the time frame or date provided for Final Completion by the neglect or failure of the Town or by a Force Majeure, then the Contract Time set forth in the Contract will be extended by the Town subject to the following conditions: 1. The cause of the delay arises after issuance of the NTP and could not have been anticipated by the Contractor by reasonable investigation before proceeding with the Work; 2. The Contractor demonstrates that the completion of the Work will be actually and necessarily delayed; 3. The effect of such cause cannot be avoided or mitigated by the exercise of all reasonable precautions, efforts, and measures whether before or after the occurrence of the cause of delay. A delay meeting all the conditions of the above will be deemed an Excusable Delay. The Town reserves the right to rescind or shorten any extension previously granted if subsequently, the Project Manager determines that any information provided by the Contractor in support of a request for an extension of time was erroneous; provided however, that such information or facts, if known, would have resulted in a denial of the request for an Excusable Delay. Notwithstanding the above, the Project Manager will not rescind or shorten any extension previously granted if the Contractor acted in reliance upon the granting of such extension and such extension was based on information which, although later found to have been erroneous, was submitted in good faith by the Contractor. The request for an Excusable Delay must be made within five (5) calendar days after the time when the Contractor knows or should have known of any cause for a specific event, for which it may claim an extension of time and must provide any actual or potential basis for an extension of time, identifying such causes and describing, as fully as practicable at that time, the nature and expected duration of the delay and its effect on the completion of that part of the Work identified in the request. The Project Manager may require the Contractor to furnish such additional information or documentation, as the Project Manager will reasonably deem necessary or helpful in considering the requested extension. The Contractor will not be entitled to an extension of time unless the Contractor affirmatively demonstrates that it is entitled to such extension. The Project Manager will endeavor to review and respond to the Contractor’s request for Excusable Delays in a reasonable period of time; however, the Contractor is obligated to continue to perform the Work required regardless of whether the Project Manager has issued a decision or whether the Contractor agrees or disagrees with that decision. With regard to an injunction, strike or interference of public origin which may delay the Project, the Contractor must promptly give the Project Manager a copy of the injunction or other orders and copies of the papers upon which the same was granted. The Town must be afforded the right to intervene and become a party to any suit or proceeding in which any such injunction has been obtained and move to dissolve the same or otherwise, as the Town may deem proper. Where the Contractor is delayed for any period of time by two or more of the causes mentioned in Article C4.04, Excusable Delay, Non-Compensable, the Contractor will not be entitled to a separate extension for each one of the causes, only one period of extension will be granted for the delay. Repair of Sidewalk Trip Hazards Bid No. 2023-36R Any extension of time granted by the Town will be processed through the Change Order provisions of the Contract. The permitting of the Contractor to proceed with the Work subsequent to the date specified in the Contract (as such date may have been extended by a change order), the making of any payment to the Contractor, the issuance of any Change Order, will not waive the Town's rights under the Contract, including but not limited to the assessment of liquidated damages or declaring Contractor in default. C4.04 EXCUSABLE DELAY, NON-COMPENSABLE Excusable Delay is delay caused by either of the following: (i) circumstances that could not be foreseen and are beyond the reasonable control of Contractor, its subcontractors, or suppliers; or (ii) joint or concurrent action by Contractor, its subcontractors, suppliers or vendors and the Town. Then Contractor will be entitled only to a time extension and no compensation for the delay. Contractor is entitled to a time extension of the Contract time for each day the Work is delayed due to Excusable Delay. Contractor must document its claim for any time extension as provided in Article C4.05. Failure of Contractor to comply with Article C4.05, as to any particular event of delay will be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. C4.05 CLAIMS Contractor will only be entitled to submit a claim after submitting its request for additional compensation or time in accordance with Articles C4.03 and C4.04 of the Contract and the request(s) have been denied or the Contractor does not agree with the decision of the Town. Any claim for a change in the Contract time for completion of any Work, the Contract Term, or Contract price must be made by written notice by Contractor to the Town representatives identified in Article C1.26 within the timeframe established in Article C4.04, effective with the commencement of the event giving rise to the claim stating the general nature and cause of the claim. Thereafter, within twenty (20) calendar days of the termination of the event giving rise to the claim, written notice of the extent of the claim with supporting information and documentation must be provided unless the Procurement Manager allows an additional period of time to ascertain more accurate data in support of the claim. The written notice must be accompanied by Contractor's written notarized statement that the adjustment(s) claimed is the entire adjustment to which the Contractor has reason to believe it is entitled as a result of the occurrence of said event. All claims and disputes will be determined in accordance with the Contract. It is expressly and specifically agreed that any and all claims for changes to the Contract will be waived if not submitted in strict accordance with the requirements of this Article. The Town may require the Contract to submit its claim utilizing a specific format or forms to facilitate the Town’s evaluation of the claim. The Town at its sole discretion may require that additional documentation or information be provided by the Contractor to assist in its review and evaluation of the claim. The Contract time will be extended in an amount equal to time lost on critical Work items due to delays beyond the control of and through no fault or negligence of Contractor if a claim is made as provided in this Article. Such delays include, but are not limited to, acts or neglect by any separate contractor employed by Town, fires, floods, labor disputes beyond the control of the Contractor, epidemics, abnormal weather conditions (if applicable), or acts of God. Repair of Sidewalk Trip Hazards Bid No. 2023-36R The Contractor will not be entitled to an increase in the Contract price or payment or compensation of any kind from the Town for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference or hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance be it reasonable or unreasonable, foreseeable or unforeseeable, avoidable or unavoidable. Contractor will only be entitled to an extension of the Contract Time for completion of the Work, as the sole and exclusive remedy for such resulting excusable delay. The Contractor agrees to make no claim for damages for delay of any kind in the performance of the Contract Documents whether occasioned by any act or omission of the Town or any of its representatives and the Contractor agrees that any such claim will be compensated solely by an extension of time to complete performance of the Work due to an Excusable Delay as defined in Articles C4.03, and Article C4.04. The Contractor alone specifically assumes the risk of such delays, including, without limitation: delays in processing or approving any submittals to the Town or by the Town, or the failure to render determinations, approvals, replies, inspections, in a timely manner. Contractor will not receive monetary compensation for Town delay(s). Failure of Contractor to comply with this Article as to any particular event of claim will be deemed conclusively to constitute a waiver of any and all claims resulting from that particular event. C4.06 CONTINUING THE WORK Contractor must continue to perform all Work under the Contract Documents during all disputes or disagreements with Town, including disputes or disagreements concerning a request for a Change Order and no Work must not be delayed or postponed pending resolution of any disputes or disagreements. C4.07 FRAUD AND MISREPRESENTATION The Town may terminate this Contract or any other contracts with the Town with any person, individual, corporation, entity, or affiliate that attempts to meet its contractual obligations with the Town through fraud, misrepresentation, or material misstatement. Such person, individual, corporation, entity, or affiliate will be responsible for all direct or indirect costs associated with termination or cancellation. C4.08 STOP WORK ORDER The Town may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the Work for a period of up to ninety (90) days (or any lesser period), commencing no sooner than the date the order is delivered to the Contractor, and for any further period to which the parties may agree. Any such order will be specifically identified as a “Stop Work Order” issued pursuant to this paragraph. Within the period of ninety (90) days (or the lesser period specified) after a Stop Work Order is delivered to the Contractor, or within any extension to which the parties have agreed the Town will either: 1. Cancel the Stop Work Order; or 2. Terminate the Work covered by such order as provided in Article C5.03, Termination for Convenience. If a Stop Work Order issued under this Article is canceled or the period of the order or any extension thereof expires, the Contractor must resume the Work without compensation to the Contractor for such suspension other than extending the time to complete any Work under the Contract or extending the Contract Term to the extent that, in the opinion of the Project Manager, the Contractor may have been delayed by such suspension. In the event the Project Manger determines that the suspension of Work was necessary due to Contractor’s defective or incorrect Work, unsafe Work conditions caused by the Contractor, or any other reason caused by Repair of Sidewalk Trip Hazards Bid No. 2023-36R Contractor’s fault or omission, the Contractor will not be entitled to an extension of time or Contract Term or (Time) as a result of the issuance of a Stop Work Order. Suspension of the Work caused by a threatened or actual storm event, regardless of whether the Town has directed such suspension, will entitle the Contractor to additional Contract time as non- compensable, Excusable Delay, and will not give rise to a claim for compensable delay. C4.09 MATERIALITY AND WAIVER OF BREACH Town and Contractor agree that each requirement, duty, and obligation set forth in the Contract Documents is substantial and important to the formation of the Contract Documents and, therefore, is a material term hereof. The Town's failure to enforce any provision of the Contract Documents will not be deemed a waiver of such provision or modification of the Contract Documents. A waiver of any breach of a provision of the Contract Documents will not be deemed a waiver of any subsequent breach and will not be construed to be a modification of the terms of the Contract Documents. C4.10 TIME IN WHICH TO BRING ACTION AGAINST THE TOWN In the event the Contractor may be deemed to have a cause of action against the Town, no action will lie or be maintained by the Contractor against the Town upon any claim arising out of or based upon the Contract Documents by reason of any act or omission or requirement of the Town or its agents, unless such action is commenced within six (6) months after the date of issuance of a final payment under the Contract, or if the Contract is terminated under the provisions of the Contract, unless such action is commenced within six (6) months after the date of such termination by the Town. C4.11 CONTRACT EXTENSION The Town reserves the right to extend the Contract for up to ninety (90) calendar days beyond the original Contract period, inclusive of any Options to Renew exercised by the Town. In such event, the Town will notify the Contractor in writing of such extensions. C5 EARLY TERMINATION & DEFAULT C5.01 SET-OFFS, WITHOLDING, AND DEDUCTIONS The Town may set-off, deduct or withhold from any payment due the Contractor, such sums as may be specifically allowed in the Contract or by applicable law including, without limitation, the following: 1. Any amount of any claim by a third party; 2. Any Liquidated Damages, and/or; 3. Any unpaid legally enforceable debt owed by the Contractor to the Town. The Town will notify the Contractor in writing of any such withholdings. Any withholding, which is ultimately held to have been wrongful, will be paid to the Contractor in accordance with the Local Government Prompt Payment Act C5.02 CONTRACTOR DEFAULT a. Event of Default An event of default means a breach of the Contract by the Contractor. Without limiting the generality of the foregoing and in addition to those instances referred to herein as a breach, an Event of Default, includes but is not limited to, the following: 1. The Contractor has not performed the Work in a timely manner; Repair of Sidewalk Trip Hazards Bid No. 2023-36R 2. The Contractor has refused or failed to supply properly skilled staff or provided sufficient quantities of staff to perform the Work; 3. The Contractor has failed to make prompt payment to Subcontractors or suppliers for any services, materials, or supplies provided to Contractor; 4. The Contractor has become insolvent or has assigned the proceeds received for the benefit of the Contractor’s creditors, or the Contractor has taken advantage of any insolvency statute or debtor/creditor law or if the Contractor’s affairs have been put in the hands of a receiver; 5. The Contractor has failed to obtain the approval of the Town where required by the Contract Documents; 6. The Contractor has failed in the representation of any warranties stated herein; 7. When, in the opinion of the Town, reasonable grounds for uncertainty exist with respect to the Contractor’s ability to perform the Work. b. Notice of Default – Opportunity to Cure Where an Event of Default (“Default”) occurs under the Contract, the Town may at its sole discretion notify the Contractor, specifying the basis for such Default, and advising the Contractor that such Default must be cured within a time frame specified by the Town; or, the Contract with the Town may be terminated. The Town is under no obligation to issue such notification. The Town may grant an extension to the cure period if the Town deems it appropriate and in the best interest of the Town, without waiver of any of the Town’s rights hereunder. The Town, at its sole discretion, may have a default corrected by its own forces or another contractor and any such costs incurred will be deducted from any sums due the Contractor under any contract with the Town. The Town Manager or designee may also suspend any payment or part thereof or order a Work stoppage until such time as the issue(s) concerning compliance are resolved. c. Termination for Default Where a Default is not cured within the time specified to cure the Default, the Town Manager in addition to all remedies available by law, may immediately, upon written notice to Contractor, terminate this Contract. Contractor understands and agrees that termination of this Contract under this Article will not release Contractor from any obligation accruing prior to the effective date of termination. In the event of termination by the Town Manager or designee, the Town Manager or designee may immediately take possession of all applicable documentation and data, material, equipment, and supplies to which it is entitled to under the Contract or by law. Where the Town erroneously terminates the Contract for default, the terminations will be converted to a Termination for Convenience, and the Contractor will have no further recourse of any nature for wrongful termination. C5.03 TERMINATION FOR CONVENIENCE In addition to cancellation or termination as otherwise provided for in the Contract, the Town may at any time, in its sole discretion, with or without cause, terminate the Contract by written notice to the Contractor. Such Written Notice will state the date upon which Contractor must cease all Work under the Contract, and if applicable vacate the Project(s) site(s). Upon receipt of such notice, unless otherwise directed by the Town, the Contractor must Stop all Work on the date specified in the notice (“the Effective Date”); 1. Take such action as may be necessary for the protection and preservation of the Town’s materials and property; 2. Cancel all cancelable orders for materials and equipment; Repair of Sidewalk Trip Hazards Bid No. 2023-36R 3. Remove all materials, supplies or equipment that may be used by the Contractor on other work; 4. Assign to the Town and deliver to the Town, at a site(s) specified by the Town, any non- cancelable orders for materials and equipment that can not otherwise be used by the Contactor on other work; 5. Take no action that will increase the amounts payable by the Town under the Contract Documents; and take reasonable measures to mitigate the Town’s liability under the Contract Documents; and 6. All documents, including electronic documents, related to Work authorized under the Contract, whether finished or not, must be turned over to the Town. Failure to timely deliver the documentation will be cause to withhold any payments due without recourse by Contractor until all documentation is delivered to the Town. In the event that the Town exercises its right to terminate the Contract pursuant to the Contract Documents, the Town will pay the Contractor for the actual cost, or the fair and reasonable value, as substantiated by invoice documentation, of any non-cancelable material(s) and equipment that cannot be used elsewhere by the Contractor in the performance of its work. In no event, will any payments under this Paragraph exceed the maximum cost set forth in the Contract and the amount due hereunder may be offset by payments made to the Contractor or any claims made against the Contractor. Contractor will not be entitled to lost profits, overhead or consequential damages as a result of a Termination for Convenience. C5.04 REMEDIES AVAILABLE TO THE TOWN The Town may avail itself of each and every remedy stated in the Contract Documents or existing at law or in equity. The exercise or the beginning of the exercise of one remedy will not be deemed a waiver of the right to exercise, at the same time or thereafter, of any other remedy. C5.05 FUNDS AVAILABILITY Funding for this Contract is contingent on the availability of funds and the Contract is subject to amendment or termination due to lack of funds, reduction of funds and/or change in regulations, upon thirty (30) days’ notice. C6 PAYMENT PROCESS C6.01 COMPENSATION Contractor can submit an invoice for payment for Work performed once per month for work completed and acceptance by the Project Manager. Contractor may not invoice more than once per month. Contractor must use the Town’s Contractor Payment Application (“Invoice”) for all payment requests. Failure to use the Invoice form and fully complete the required information will delay payment. Payments will not be made based on statements of accounts. The Invoice Form is available on the Town’s website at Town of Miami Lakes - Growing Beautifully - Invoice (miamilakes-fl.gov). The Town will take action to pay, reject or make partial payment on an Invoice in accordance with the Florida Local Government Prompt Payment Act. No payments will be due or payable for Work not performed or materials not furnished or where the Work has not been accepted by the Town. If there is a dispute with regard to an invoice, the Town will pay the amount not in dispute and reject the remainder that is in dispute. Contractor is responsible for paying its Subcontractors and suppliers in accordance with the Florida Local Government Prompt Payment Act. Repair of Sidewalk Trip Hazards Bid No. 2023-36R The Contractor will be compensated based on actual Work performed at the prices specified in the Contract. The acceptance of final payment for a Project constitutes a waiver of all claims by Contractor related to that Project, except those previously made in strict accordance with the provisions of the Contract and identified by Contractor as unsettled at the time of the application for payment. C6.02 ESTIMATED QUANTITIES The stated quantities do not reflect the actual quantities to be ordered and the Town has not established any minimum quantities and no guarantee is expressed or implied as to the total quantity of Work to be issued to a Contractor. The Town reserves the right, at its sole discretion, to make adjustment to the number and/or location of the Bid items. The failure of the Town to order any minimum quantities does not form any basis for a claim by the Contractor for lost work or profits. C6.03 LINE-ITEM PRICING Line-item pricing must include all costs, both direct and indirect to perform the Work except for those costs specifically identified as reimbursable costs as stated in Article B9.06. This includes any incidental costs associated with the Work not specifically stated, i.e., the installation of drainage may require backfill and patching, whether permanent or temporary. The Bid Form contains line-item prices and the Bidder is required to Bid on all line items. Where a Bidder fails to provide line-item prices for all line items the Bid will be rejected as non- responsive. C6.04 LINE-ITEM QUANTITIES The estimated quantities will be used solely for bid comparison purposes for the Town to determine the lowest responsive and responsible. No guarantee is expressed or implied as to the total quantity of Work to be issued to a Contractor. C6.05 ADDITIONAL LINE-ITEM PRICING The Town reserves the right to request price quotes for additional items not contained in the initial award. Should the Town add any additional line items the Town will do so through the Change Order process. C6.06 REIMBURSIBLE EXPENSES Certain Project expenses may or will not be known at the time of award of a Project. The Town will reimburse the Contractor for such costs, which includes: 1. Permits 2. Police Officer costs when not provided by the Town 3. WASD fees 4. DERM fees Where a permit or the Town requires the Contractor to use a police officer(s) during the performance of the Work the Town will make every effort to furnish police officers at no cost to the Contractor. Where the Town is not able to provide the required police officers the Town will reimburse the Contractor based on the actual cost to the Contractor and the cost is not include in the unit price per item. To be reimbursed the Contractor must submit a copy of documentation substantiating both the cost as well as proof of payment. Contractor will only be reimbursed for the actual direct cost, without any mark-up. END OF SECTION Repair of Sidewalk Trip Hazards Bid No. 2023-36R Repair of Sidewalk Trip Hazards Bid No. 2023-36R SECTION D. SPECIAL TERMS & CONDITIONS D1 OVERVIEW The Town of Miami Lakes requires a licensed Contractor to inspect and repair sidewalk trip hazards in order to maintain the quality of the Town’s sidewalks and limit the Town’s liability for trip hazards. When the Town becomes aware of developing trip hazards, the Town will assess whether the damaged sidewalk flag is so extensive that it merits replacement of the whole flag, or if the flag can be salvaged through the process of sidewalk grinding. If the flag can be salvaged, the Town will utilize this Contract to repair trip hazards, returning the sidewalk flag to a safe condition. D2 SCOPE OF WORK The Work consists of the inspection of Town sidewalks and repair of sidewalk trip hazards. Based on the criteria established by the Town, the Contractor shall visually inspect, pre-identify, measure, and record sidewalk trip hazards suitable for repairs throughout the project area. The Contractor shall identify and record sections of sidewalk that meet Town criteria for slab removal and replacement throughout the project area. After the inspection is complete, and upon approval of the Town, the Contractor shall repair sidewalk trip hazards identified in order to achieve a contiguous level surface between slabs. The Contractor must furnish all labor, materials, equipment, and supervision required for the inspection of sidewalks and repair of sidewalk trip hazards. D2.01 SURVEY SPECIFICATIONS Before any repair work takes place, the Contractor shall survey the zone identified by the Town that work shall take place in and identify all vertical trip hazards in the project area that have slab displacements greater than 0.25" that would be candidates for repair. The Contractor shall note any slab with a displacement of greater than 2" and provide a report of such locations to the Town for replacement. During the survey, each identified location shall be assigned and marked with a site number. This number shall also be used to reference each site on the report. After the survey is complete, a report shall be submitted to the Town for review and approval before any work is to commence. The report shall include: • A list of all identified displacements categorized by site number, address, size of displacement, and estimated cost of repair for each location. • A list of all identified slabs with displacement in excess of 2” or meeting Town criteria for slab removal and replacement. Note these locations for the Town to consider for removal and replacement and provide a report with site number, address, GPS coordinates, and dimensions (ft) of slab replacement for each location. • A total number of trip hazards to be addressed and remedied. • A map with all identified site numbers included in the survey, as well as a KML file of the locations for Town use. D2.02 CONCRETE CUTTING SPECIFICATIONS After the survey, once approval is given by the Town, Contractor shall repair the sidewalk deviation to achieve a level surface. All equipment used in the process of repairing the sidewalk must fit on the sidewalk and not overhang the sidewalk which may adversely affect landscaped areas. Contractor shall not cause damages to landscaping, retaining walls, curbs, sprinkler heads, utilities, etc., and shall be responsible for repair costs for any damages and restored to their pre- existing state. Repair of Sidewalk Trip Hazards Bid No. 2023-36R D2.03 LIMITATIONS • No storing of equipment or materials on public right-of-way or private property shall be allowed. • All sidewalk repairs started in residential areas shall be completed by the end of the same workday in which they started. Sidewalk repairs through driveways of adjoining business properties shall be completed within two (2) hours. • The Town may direct repairs at locations other than construction joints. Repairs directed by the Town will be paid for at the Contract unit price bid. • At no time shall the Contractor cause excessive dust – in the sole opinion of the Town – to be airborne. Any dust created by the repair process must be damped with water or immediately consumed by a vacuum system. If dust is remediated with water, any and all debris or slurry created as a result of the process must be cleaned the same day. Slurry must be immediately contained and will not be permitted to stand on the sidewalk or run into the parkway or residential property. • The Contractor shall take precautions during repair operations to not disfigure, scar, impair, or damage any surrounding surfaces including, but not limited to, sidewalk, driveway, roadway, steps, walls, railings, light poles, turf, or any public or private installations such as trees, irrigation, sprinkler heads, electric fences, etc. • All potential trip hazards marked for repair must be removed in accordance with the American with Disabilities Act (ADA) requirements with the resulting finish being ADA compliant. Each offset must be tapered at 1:12 slope and must have smooth uniform appearance and texture. • The finished result of each repair shall be taken to a zero point of differential settlement along the entire length of the repair and to both edges of the sidewalk to eliminate the potential for trip hazards the full width of the sidewalk. • The Contractor shall have an employee safety plan and shall employ safety procedures that ensure that bystanders or passersby will not be injured from the implementation of the work. After completion of repairs, the Contractor shall submit an invoice listing all trip hazard repairs made in the project area to match the survey. This list should include the survey site number, address, size of displacement, and final cost of repair for each location, as well as the total number of trip hazards remedied. D2.04 METHOD OF MEASUREMENT Repairs of sidewalks will be measured for payment in inch-feet of sidewalk repaired. The cost of cleaning each worksite shall be included in the price bid. The quantity of sidewalk repair will be determined by multiplying the average sidewalk vertical separation height by the length of repair along the joint on each vertical separation in inch-feet. The Contractor is required to record and submit, with each invoice, the exact dimensions of each vertical separation removed per location. Depth shall be measured to the nearest 1/8 inch. D2.05 LOCATION OF WORK Work for this Contract shall take place within the corporate limits of the Town of Miami Lakes. Specific maintenance areas and zones for each Work Order are to be established by the Public Works Department. Once the Contractor receives approval from the Town to begin work, work shall be continuous until all work is complete. Any costs incurred for mobilization are considered incidental to this Contract. This Contract may be terminated at any time for any reason by the Town. Work will generally cease when all identified locations for survey and repair have been addressed by the Contractor, or when the Town’s allocated funds have been expended. Repair of Sidewalk Trip Hazards Bid No. 2023-36R D3 CONTRACT TERM This Agreement will be effective upon execution by both parties and will continue for a term of three (3) years from the date of execution. The provisions of this Agreement will remain effective until all Services required under Work Orders issued under this Agreement have been completed. The Town, by action of the Town Manager, will have the option to extend the term for two (2) additional period(s) of one (1) year each, subject to continued satisfactory performance as determined by the Town Manager, and to the availability and appropriation of funds. In no event shall the term of this Agreement exceed five (5) years from its commencement date. Town Commission authorization of this Agreement includes delegation of authority to the Town Manager to administratively approve said extensions. D4 COMPENSATION This work shall be paid for at the Contract unit price per inch-feet for sidewalk repairs. Price shall be payment in full for all labor, equipment, tools, materials, mobilizations, survey, generation of lists for mitigated and non-mitigated vertical separations, and all other costs associated with such work as specified herein. The Town anticipates approximately 10,000 inch-feet to be included in this Contract. This is in no way a guaranteed minimum or maximum quantity. Actual quantities will be based on field conditions identified in the survey. D5 GENERAL REQUIREMENTS D5.01 HURRICANE PREPAREDNESS During such periods of time as are designated by the United States Weather Bureau or Miami Dade County as being a severe weather event, including a hurricane watch or warning, the Contractor, at no cost to the Town, must take all precautions necessary to secure any Work in response to all threatened storm events, regardless of whether the Contractor has given notice of same, in accordance with the Miami-Dade County Code. Compliance with any specific severe weather event or alert precautions will not constitute additional work. Suspension of the Work caused by a threatened or actual storm event, regardless of whether the Town has directed such suspension, will entitle the Contractor to additional Contract time as non- compensable, Excusable Delay, and will not give rise to a claim for compensable delay. D5.02 INSPECTION OF THE WORK The Project Manager, other Town representatives, and inspectors representing the Town and other public entities having jurisdiction over the Work must at all times have access to the Work Should the Contract Documents, or any laws, ordinances, or any public authority require any of the Work to be tested, Contractor must provide timely notice of readiness of the Work for testing and timely notice must be given of the date fixed for such testing so that the appropriate representatives of the Town, DERM, or other entities can be present for such testing. Contractor will be responsible for making arrangements for all tests and for all associated costs for all required testing. The original copies of all testing reports are to be sent directly to the Project Manager by the testing firm, with a copy to the Contractor. The Town, at its sole discretion may conduct testing in addition to the required testing. In such instances the Town will pay all testing costs unless the tests determine that the material, Work, or equipment is not compliant with the requirements of the Contract Documents. In such instances the Contractor must reimburse the Town for all incurred testing costs and the Contractor will be responsible for any costs associated with re-testing to ensure compliance. Repair of Sidewalk Trip Hazards Bid No. 2023-36R Inspectors have no authority to permit deviations from, or to relax any of the provisions of the Contract Documents or to delay the Work by failure to inspect the materials and Work with reasonable promptness without the written permission or instruction of Project Manager D5.03 UNCOVERING FINISHED WORK The Project Manager’s right to make inspections includes the right to order the Contractor to uncover or take down portions of finished Work. The Project Manager will notify the Contractor in writing concerning all uncovered finished Work. Should the Work prove to be in accordance with the Contract, the uncovering or taking down and the replacing and the restoration of the parts removed will be treated as additional Work for the purpose of computing additional compensation and an extension of time. Should the Work examined prove unsatisfactory, such uncovering, taking down, replacing and restoration will be at the expense of the Contractor. Such expenses will also include repayment to the Town for any and all expenses or costs incurred by it, including employee salaries or related cost, in connection with such uncovering, taking down, replacing and restoration at the Project site. D6 PRELIMINARY STEPS D6.01 CONTRACTOR’S PRE-START REPRESENTATION Contractor represents that it has familiarized itself with and assumes full responsibility for having familiarized itself with the nature and extent of the Contract Documents, Work, location of the Work, all local conditions, and any federal, state, county, and local laws, ordinances, rules, and regulations that may, in any manner, affect performance of the Work, and represents that it has combined its inspections and observations with the requirements of the Contract Documents. Contractor further represents that it has studied all surveys, document, and reports of including those of any subsurface and latent physical conditions referred to in the specifications and made such additional inspections and investigations as it deems necessary for the performance of the Work and that he has coordinated the results of all such data, inspections, and investigations with the requirements of the Contract Documents. D6.02 PRE-CONSTRUCTION CONFERENCE Within fourteen (14) calendar days after Contractor execution of the Contract by the Town, and before any Work is performed at the Project site, a pre-construction conference will be held. Prior to this meeting the Contractor should have submitted its Project Schedule and Schedule of Values so they and other details of the project can be discussed. D6.03 PROJECT SCHEDULE Contractor must submit a proposed Project schedule as follows: 1. Schedule identifying the schedule for each location. The proposed Project schedule must be submitted within ten (10) calendar days of the Notice of Award and such submittal will be subject to the Project Manager’s review. Subsequent to such review of said schedule the Contractor will establish said schedule as the baseline schedule. 2. All updates of schedules must be tracked against the baseline schedule and must be at a minimum submitted with each pay application. An updated schedule against the baseline must also be submitted upon execution of each change order that impacts the Contract Documents Time for completion. Failure to submit such schedules will result in the rejection of any submitted payment application. 3. All Project Schedules must be prepared in Microsoft Project 2007 or earlier unless otherwise approved by the Project Manager. At the time of submission of schedules, Contractor must submit a hard copy as well as an electronic version. Electronic versions must not be submitted in a .pdf format. Repair of Sidewalk Trip Hazards Bid No. 2023-36R In addition to the Project Schedule the Contractor must provide a two (2) week look-ahead schedule that reflects the Work to be performed during the two (2) week period. The look-ahead schedule must be provided to the Project Manager and Consultant every other Thursday prior to the start of the two-week period. This schedule will, at a minimum, include the area(s) where Work is to be performed and the Work to be performed in the area(s). D6.04 SCHEDULE OF VALUES The Contractor must submit two copies of a Schedule of Values, which must be submitted within ten (10) calendar days of the issuance of the Notice of Award. The Schedule of Values shall indicate a complete breakdown of labor and material of all categories of Work on the Project. Contractor’s overhead and profit should be listed as separate line items. Each line item must be identified with the number and title of the major specification section or major components of the items. The Project Manager may require further breakdown after review of the Contractor’s submittal. The Town reserves the right to require such information from the Contractor as may be necessary to determine the accuracy of the Schedule of Values. The combined total value for mobilization under the Schedule of Values shall not exceed 5% of the value of the Contract. The accepted Schedule of Values must be incorporated into the Contractor’s payment application form. D6.05 CONSTRUCTION PHOTOGRAPHS Prior to commencement of the Work the Contractor must take digital photographs and color audio-video recording to document existing conditions and submit copies in an acceptable format to the Town prior to commencement of the Work. Contractor must submit with each application for payment photographs that accurately reflect the progress of all aspects of the Work. The number of photographs to be taken will be based on the magnitude of the Work being performed. Contractor must submit one copy of each photograph in print and digitally. The photographs must be printed on 8” X 10” high resolution glossy commercial grade and weight color photographic print paper or in a format acceptable to the Town. Each photograph must be imprinted on its face with the title of the Project, the date, and time the picture was taken. Digital photographs must be taken using .jpeg format and will be submitted on a flash drive clearly identifying the name of the Project, the name of the Contractor, and the timeframe in which the pictures were taken. Initial set up prints will be submitted in a three-ring binder with each picture protected by a clear plastic sleeve. Subsequent prints are to be submitted in clear plastic sleeves that can be added to the binder. The three-ring binder must be of such size to be able to hold all print pictures. D6.06 STAGING SITE The Contractor is solely responsible for making all arrangements for any staging site(s) that may be necessary for the performance of the Work and the Contractor is responsible for all site security, including any fencing of the site, and any loss, damage or theft to its equipment and materials. Any fencing of the Staging Site is subject to the prior written approval of the Project Manager. The Town at its sole discretion may make a staging site available for use by the Contractor. If such site is made available by the Town, the Town assumes no responsibility or liability, and the Contractor will be responsible for any loss, damage or theft to its equipment and materials. The Contractor is also responsible for restoring the site to its pre-existing condition prior to the Contractor’s use of the site. The Contractor may be required to provide or may choose to use an office trailer for the duration of the Project. The Project Manager will authorize the use of any office trailer and the placement location for the office trailer. The Contractor must obtain all required permits from the appropriate regulatory agencies. Repair of Sidewalk Trip Hazards Bid No. 2023-36R No parking is permitted in the Staging Site without the prior written approval of the Project Manager. D6.07 PROJECT SIGNAGE Contractor must furnish and install two (2) Project signs at the Project Site in accordance with the requirements provided by the Project Manager. D6.08 COORDINATION WITH TOWN RESIDENTS Contractor will, be responsible to provide written notification to the Town residents impacted by the Work at least seven (7) days prior to the commencement of the Work. Notification shall be made using a flyer, in a format acceptable to the Project Manager, and must be delivered by mail or by personal delivery. Contractor must maintain a record of the date(s) of notification and provide such information to the Project Manager. Contractor must not commence Work until notification to residents is provided in a manner acceptable to the Town. Contractor must also coordinate with the residents all Work that impacts residents’ driveway approaches. Additionally, the Contractor may be required to attend resident informational meetings. D7 SITE ISSUES D7.01 SITE INVESTIGATION AND REPRESENTATION It is the responsibility of the Contractor to satisfy itself as to the nature and location(s) of the Work prior to commencement of Work on the site, the general and local conditions, particularly those bearing upon availability of installation, transportation, disposal, handling and storage of materials, and all other matters which can in any way affect the Work or the cost thereof under the Contract Documents. Work site(s) may have existing utilities, such as, but not limited to, irrigation, phone, water, and sewer, CATV, traffic signals, electrical, and storm sewer. Known utilities and structures adjacent to or encountered in the Work will be shown on the Drawings. The locations shown are taken from existing records and the best information available from existing plans and utility investigations; however, it is expected that there may be some discrepancies and omissions in the locations and quantities of utilities and structures shown. Those shown are for the convenience of the Contractor only, and no responsibility is assumed by the Town for their accuracy or completeness. No request for additional compensation or Contract time resulting from encountering utilities not shown will be considered. It is the responsibility of the Contractor to verify the location of all such utilities, structures, etc., by hand excavation or other appropriate measures before performing any Work. The Contractor must call Sunshine State One Call of Florida, Inc., and other appropriate agencies, as applicable, prior to the commencement of any excavation or digging to determine the locations of existing utilities prior to the commencement of any Work. The Contractor is responsible for any and all claims resulting from the damage caused to any utilities, identified or not. Should the Contractor identify any utilities, structures, etc., which will or may be encountered during the performance of the Work, the Town must be consulted immediately in order for a decision to be made on the potential relocation or other action(s) to be taken as it relates to the work. Should the Town direct the Contractor to relocate any utilities that would be impacted by any Work then the Town will compensate the Contractor for such relocation in accordance with the Change Order provisions of the Contract. The Contractor will not purposefully disrupt or disconnect any type of utility whatsoever without first obtaining the prior written approval of the Town or applicable utility owner. Requests for any disconnection, including those required of other utilities, must be in writing and received by Repair of Sidewalk Trip Hazards Bid No. 2023-36R the Town at least seventy-two (72) hours prior to the time of the requested interruption. The Town may require that the Contractor notify, in writing, any property owners to be impacted by service interruptions to their utilities. Any failure by the Contractor to familiarize itself with any utilities that may impact the performance of the Work will not relieve Contractor from responsibility for properly estimating the difficulty or cost of performing the Work and will not entitle the Contractor to any additional compensation. D7.02 METHOD OF PERFORMING THE WORK The apparent silence of the Contract Documents as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished, will be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used, and interpretation of the Contract Documents will be made upon that basis. The Contractor must comply with the manufacturer’s requirements for the handling, delivery and storage of all equipment and materials. Contractor must inspect all equipment and materials immediately prior to installation and must not install any damaged or defective items. Contractor must comply with the manufacturer’s applicable instructions and recommendations for the performance of the Work, to the extent that these instructions and recommendations are more explicit or more stringent than requirements indicated in the Contract Documents. The Contractor must familiarize itself with normal Town operations where the Work is to be performed so that it can conduct the Work in the best possible manner to the complete satisfaction of the Project Manager. The Work to be performed must be done in such a manner so as not to interfere with the normal Town operations. The manner in which the Work is performed will be subject to the approval of the Project Manager, whom, if necessary, will have the authority to require changes in the manner in which the Work is performed. There must be no obstruction of Town services without the prior written approval of the Project Manager. All requests for such interruption or obstruction must be given in writing to the Project Manager twenty-four (24) hours in advance of the interruption of Town operations. If the Project Manager or Consultant reasonably determines the rate of progress of the Work is not such as to ensure its completion within the designated completion time, or if, in the opinion of the Project Manager, the Contractor is not proceeding with the Work diligently or expeditiously or is not performing all or any part of the Work according to the Project schedule accepted by or determined by the Project Manager, the Project Manager will have the right to order the Contractor to do either or both of the following: (1) improve its work force; and/or (2) improve its performance in accordance with the schedule to ensure completion of the Project within the specified time. The Contractor must immediately comply with such orders at no additional cost to the Town. (3) The Town at its sole option may also have Work performed by a third-party contractor and deduct such cost from any monies due the Contractor. Where materials are transported in the performance of the Work, vehicles must not be loaded beyond the capacity recommended by the vehicle manufacturer or permitted by Federal, State or local law(s). When it is necessary to cross curbing or sidewalks, protection against damage must be provided by the Contractor and any damaged curbing, drainage, grass areas, sidewalks or other areas must be repaired at the expense of the Contractor to the satisfaction of the Project Manager. Contractor is responsible to control dust and preventing it from becoming a public nuisance or causing off-site damage. Contractor must take all necessary and prudent measure to control dust. Repair of Sidewalk Trip Hazards Bid No. 2023-36R Depending on the nature of the Work the Project Manager may require a staging plan be submitted to and approved by the Project Manager prior to the start of construction and issuance of the Notice to Proceed. Such staging plan must be revised and resubmitted as necessary during construction. D7.03 DIFFERING SITE CONDITIONS In the event that during the course of the Work on a Project the Contractor encounters subsurface or concealed conditions at the Project site which differ materially from those shown in the Contract Documents, and from those ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents, Contractor, without disturbing the conditions and before performing any Work affected by such conditions, must, within twenty- four (24) hours of its discovery, notify the Project Manager and/or Consultant in writing of the existence of the aforesaid conditions. Project Manager or the Consultant must, within two (2) business days after receipt of Contractor's written notice, investigate the site conditions identified by Contractor. If, in the sole opinion of Project Manager or the Consultant, the conditions do materially so differ and cause an increase or decrease in Contractor's cost of, or the time required for, the performance of any part of the Work, whether or not charged as a result of the conditions, Project Manager or Consultant will recommend an equitable adjustment to cost of the Work or the time to complete the Work, or both. If the Project Manager and Contractor cannot agree on an adjustment in the Contract Price and/or Contract Time, the adjustment will be referred to the Town’s Procurement Manager for determination. Should the Town’s Procurement Manager determine that the conditions of the Project site are not so materially different to justify a change in the terms of the Contract Documents, the Procurement Manager will so notify the Project Manager, Consultant, and Contractor in writing, stating the reasons, and such determination will be final and binding upon the parties hereto. No request by Contractor for an equitable adjustment to the Contract Documents under this provision will be allowed unless Contractor has given written notice in strict accordance with the provisions of this Article. No request for an equitable adjustment or change to the Contract Price or Contract Time for differing site conditions will be allowed if made after the date certified by Consultant or Project Manager as the date of substantial completion. D7.04 PROTECTION OF PROPERTY, UTILITIES, AND THE PUBLIC The Contractor must continuously maintain adequate protection of all its Work from all losses or damage and must protect public and private property, and utilities from injury or loss arising in connection with the Work, and take all necessary precautions to prevent accidents, injuries, or damage to persons or property on or near the Work. Contractor is solely responsible to restore all areas impacted by the Work, including but not limited to swale areas, existing structures, driveways and approaches, landscaping, drainage, and lighting to pre-existing conditions to the satisfaction of the Project Manager. D7.05 CONTRACTOR’S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE Where the Contractor’s operations could cause damage or inconvenience to telephone, fiber optic, television, electrical power, oil, gas, water, sewer, or irrigation systems, the Contractor must make all arrangements necessary for the protection of these utilities and services or any other known utilities. Notify all utility companies that are affected by the construction operation at least forty-eight (48) hours in advance. Under no circumstance will expose any utility without first obtaining permission from the appropriate agency. Once permission has been granted, locate, expose, and provide temporary support for all existing underground utilities and utility poles where necessary. Repair of Sidewalk Trip Hazards Bid No. 2023-36R The Contractor and its Subcontractors will be solely and directly responsible to the owner and operators of such properties for any damage, injury, expense, loss, inconvenience, delay, suits, actions, or claims of any character brought because of any injuries or damage which may result from the construction operations under the Contract Documents. Neither the Town nor its officers or agents will be responsible to the Contractor for damages as a result of the Contractor’s failure to protect property encountered in the Work. In the event of interruption to domestic water, sewer, storm drain, or other utility services as a result of accidental breakage due to construction operations, Contractor must promptly notify the owner, any required regulatory authority, and the Project Manager. Cooperate with said authority in restoration of service as promptly as possible and bear all costs of repair and any required interim measures to ensure safety. In no event will interruption of any utility service be allowed unless granted by the owner of the utility. In the event water service lines that interfere with trenching are encountered, the Contractor may, by obtaining prior approval of the water utility, cut the service, dig through, and restore the service with similar and equal materials at the Contractor’s expense and as approved by the Project Manager. Replace, with material approved by the Project Manager or Consultant, at Contractor’s expense, any and all other laterals, existing utilities or structures removed or damaged during construction, unless otherwise provided for in the Contract Documents and as approved by the Project Manager or Consultant. Replace with material approved by the Project Manager or Consultant, at Contractor’s expense, any existing utilities damaged during the Work. D7.06 ACCESS TO WATER AND UTILITIES The Contractor is responsible for providing all water and power required for the performance of the Work, including the use of a generator. The use of a generator may be subject to the prior approval of the Town’s representative should the Work be in a primarily residential neighborhood. Electrical power required during construction shall be installed by a qualified electrical contractor approved by the Project Manager. The Town may at its sole discretion provide access to Town utilities or water should such be available at the Work site. However, the Contractor is responsible to ascertain the location and accessibility of any utilities and potable water sources necessary to perform the Work. D7.07 COORDINATION OF THE WORK Prior to the commencement of the Work, the Project Manager will make every effort, based on available information, to notify the Contractor of any ongoing or scheduled project(s) that will be ongoing or commence during the Work on a Project that may require coordination. The Contractor will be solely responsible for coordinating the Work with any other project(s) to minimize any potential adverse impact. Contractor will not be entitled to any days of delay for failure to properly coordinate the Work. The Project Manager may assist the Contractor in coordinating the Work. However, any such assistance, or lack thereof will not form the basis for any claim for delay or increased cost. If any part of Contractor’s Work depends for proper execution or results upon the work of any other persons, Contractor must inspect and promptly report to Project Manager any defects in such work that render it unsuitable for such proper execution and results. Contractor’s failure to so inspect and report will constitute an acceptance of the other person's work as fit and proper for the reception of Contractor’s Work, except as to defects which may develop in other contractor's work after the execution of Contractor’s Work. Repair of Sidewalk Trip Hazards Bid No. 2023-36R Contractor must conduct its operations and take all reasonable steps to coordinate the prosecution of the Work so as to create no interference or impact on any other contractor on the site. Should such interference or impact occur, Contractor will be liable to the affected contractor for the cost of such interference or impact. To ensure the proper execution of subsequent Work, Contractor must inspect the Work already in place and must at once report to Project Manager any discrepancy between the executed Work and the requirements of the Contract Documents. D7.08 ACCESS TO THE PROJECT SITE(S) Town will provide the lands upon which the Work is to be performed, rights-of-way and easements for access thereto and such other lands as are designated by Town for the use of Contractor. Contractor must provide, at Contractor’s own expense and without liability to the Town, any additional land and access thereto that may be required for temporary construction facilities, or for storage of materials. Contractor must furnish to the Town copies of written permission obtained by Contractor from the owners of such facilities. D7.09 CLEANING UP; TOWN’S RIGHT TO CLEAN UP Contractor must at all times keep the Work site(s) free from accumulation of excess materials, waste materials or rubbish caused by its operations. At the completion of Work at a work site(s), Contractor must remove all its excess materials, waste materials and rubbish from and about the Project(s) as well as any tools, equipment, machinery and surplus materials or supplies. If Contractor fails to clean up during the performance of the Work or at the completion of the Work, Town may do so, and the cost incurred will be charged to the Contractor. Any combustible waste materials must be removed from the work site(s) at the end of each day. Should the Contractor leave any open trenches at any time that Work is not being performed, the Town may have the open trenches covered and deduct any cost incurred from any outstanding payments due or to become due to the Contractor. The Town may also invoice the Contractor for all costs incurred in mitigating any open trenches. D7.10 SANITARY PROVISIONS The Contractor must provide on-site all necessary toilet conveniences, secluded from public observation, for use of all personnel on the Work, whether or not in its employ. Contractor must be kept in a clean and sanitary condition and must comply with the requirements and regulations of the public authorities having jurisdiction. Contractor must commit no public nuisance. Sanitary facilities must be removed by the Contractor at its own expense upon completion of the Work, and the premises must be left clean. D7.11 MAINTENANCE OF TRAFFIC Maintenance of Traffic (“MOT”) must be performed in accordance with the applicable FDOT Index Numbers (600 Series) and as further stated herein. The manual on Uniform Traffic Control Devises for Streets and Highways (U.S. Department of Transportation, FHWA), must be followed in the design, application, installation, maintenance and removal of all traffic control devices, warning devices and barriers necessary to protect the public and workmen from hazards with the Project limits. Pedestrian and vehicular traffic must be maintained and protected at all times. Prior to commencement of the Work Contractor must provide the Project Manager with the proposed MOT plan for review. The Project Manager may require revisions to the proposed MOT plan. The MOT plan must be updated by the Contractor every two weeks. Repair of Sidewalk Trip Hazards Bid No. 2023-36R Failure by the Contractor to comply with the Maintenance of Traffic requirements will result in the Town issuing a stop work order until corrective action is taken. The Contractor will not be entitled to any additional time resulting in any delays due to issuance of a stop work order. 1.01-1(a) WORK IN STREET, HIGHWAY, & OTHER RIGHTS-OF-WAY Excavation, grading, fill, storm drainage, paving and any other construction or installations in rights-of-way of streets, highways, public carrier lines, utility lines either aerial, surface, or subsurface, etc., must be done in accordance with requirements of the Contract Documents or, if not mentioned, must be restored to their original condition or better. All Work performed is subject to the approval of the Project Manager. D8 SAFETY ISSUES D8.01 SAFETY PRECAUTIONS Contractor is solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor must take all necessary precautions for the safety of, and must provide the necessary protection to prevent damage, injury, or loss to: 1. All employees on the Project site and other persons who may be affected thereby; 2. All the Work and all materials or equipment to be incorporated therein, whether in storage on or off the Project site; and 3. Other property at the Project site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities not designated for removal, relocation, or replacement in the course of construction. The Contractor must take all necessary precautions for the safety of employees in the performance of the Work on, about or adjacent to the premises, and must comply with all applicable provisions of Federal, State, and local laws, including, but not limited to the requirements of the Occupational Safety and Health Act of 1970, and amendments thereto, to prevent accidents or injury to persons on, about or adjacent to the premises where the Work is being performed. Contractor must notify owners of adjacent property and utilities when prosecution of the Work may affect them. The Contractor must comply with the OSHA “Federal Right to Know” Regulation, 29 CFR 1910, 1915, 1917, 1918, and 1926, regarding informing employees of toxic substances in the workplace, providing training, and emergency procedures. Contractor must adhere to applicable environmental protection guidelines for the duration of the Work. The Contractor must comply with all codes, ordinances, rules, orders, and other legal requirements of public authorities (including OSHA, EPA, DERM, the Town, Miami-Dade County, State of Florida), which bear on the performance of the Work All open trenches or holes must be properly marked and barricaded to assure the safety of both vehicular and pedestrian traffic. No open trenches or holes are to be left open during night-time or non-working hours without the prior written approval of the Project Manager. The Contractor must provide such equipment and facilities as are necessary or required, in the case of accidents, for first aid service to person who may be injured during the Project(s) duration. Contractor's duties and responsibilities for the safety and protection of the Work must continue until such time as all the completion of the Contract. D8.02 TRENCH SAFETY ACT Pursuant to Chapter 90-96 (CS/SB 2626), Laws of Florida, "Trench Safety Act", any person submitting a Bid is required to comply with the requirements of the FLORIDA TRENCH SAFETY ACT Repair of Sidewalk Trip Hazards Bid No. 2023-36R (90-96, LAWS OF FLORIDA), Where a Project requires trenching the Contractor must complete the Trench Safety Act Form (“Form”) and return the Form to the Project Manager before commencing any Work. Failure to submit said Form will result in the Contractor not being able to proceed with the Work and potentially be in default of its Contract. Any costs identified on the Form are not a pay item. The purpose of this form is to gather information on the costs associated with trench safety measures and to ensure that the Bidder has considered these costs and included them in its Bid prices. Failure to complete this form may result in the Bid being declared non-responsive. D8.03 MATERIAL SAFETY DATA SHEETS In compliance with Chapter 442, Florida Statutes, any toxic substance listed in Section 38F-41.03 of the Florida Administrative Code delivered as a part of the Project must be accompanied by a Material Safety Data Sheet (MSDS) which must be obtained from the manufacturer. The MSDS must include the following information: 1. The chemical name and the common name of the substance. 2. The hazards or other risks in the use of the substance, including: a. The potential for fire, explosion, corrosion, and reaction; b. The known acute and chronic health effects of risks from exposure, including the medical conditions which are generally recognized as being aggravated by exposure to the substance; and c. The primary routes of entry and symptoms of overexposure. 3. The proper precautions, handling practices, necessary personal protective equipment, and other safety precautions in the use of or exposure to the substances, including appropriate emergency treatment in case of overexposure. 4. The emergency procedure for spills, fire, disposal, and first aid. 5. A description in lay terms of the known specific potential health risks posed by the substance intended to alert any person reading this information. The year and month, if available, that the information was compiled and the name, address, and emergency telephone number of the manufacturer responsible for preparing the information. D9 PLANS, DOCUMENTS, & RECORDS D9.01 CONTRACTOR TO CHECK PLANS, SPECIFICATIONS, & DATA Contractor must verify all dimensions, quantities and details shown on any plans, specifications or other data received from Project Manager and must notify the Project Manager of all errors, omissions and discrepancies found therein within three (3) calendar days of discovery. Contractor will not be allowed to take advantage of any error, omission or discrepancy, as full instructions will be furnished to the Project Manager. Contractor will not be liable for damages resulting from errors, omissions, or discrepancies in the Contract Documents unless Contractor recognized such error, omission or discrepancy and knowingly failed to report it to Project Manager. D9.02 SHOP DRAWINGS AND SUBMITTALS Contractor is required to submit shop drawings, sketches, samples, or product data as required by the Contract Documents. Contractor is responsible to submit such documents or samples in a timely manner for review by the Project Manager or Consultant. Shop Drawings are to be complete in every detail and clearly identify any deviation from what is required by the Contract Documents. It is the responsibility of the Contractor to submit sufficient information to allow the Project Manager and/or Consultant Repair of Sidewalk Trip Hazards Bid No. 2023-36R to properly evaluate and accept the submittal or shop drawing. Receipt of the shop drawings or submittals does not constitute acceptance Incomplete or partial submittals will not be reviewed. All shop drawings for components of a system must be submitted together for them to be reviewed. Where professional calculations or certification of performance criteria of materials, systems, and or equipment are required, the Project Manager or Consultant are entitled to rely upon the accuracy and completeness of such calculations and certifications submitted by the Contractor. Calculations, when required, must be submitted in a neat clear and easy format to follow. Contractor is solely responsible for the accuracy of all shop drawings and submittals and any approval by Project Manager will in no way relieve the Contractor from said responsibility for full compliance with the Contract Documents. D9.03 TOWN FURNISHED DRAWINGS, SUPPLEMENTAL DRAWINGS, & INSTRUCTIONS The Town, in its sole discretion, may furnish design drawings. It is the sole responsibility of the Contractor to bring to the immediate attention of the Project Manager any discrepancies between the drawings and existing conditions, excluding hidden or unforeseen conditions, discovered prior to commencing and during the Work. The Contractor is solely responsible for verifying the accuracy of the drawings prior to commencing the Work and is responsible for any errors or revisions of the Work, which might have been avoided by notifying the Town prior to commencement. This also applies to any revisions or omissions identified by the Contractor. The Contractor must submit all requests for information entitled Request for Information (RFI). During the performance of the Work, should any errors, omissions, conflicts, ambiguities, or discrepancies be found in the drawings and/or specifications, the Project Manager or the Consultant will clarify in writing the intent of the drawings and the Contractor agrees to abide by the Project Manager’s interpretation and perform the Work in accordance with the decision of the Project Manager. In such event, the Contractor will be held to have included in its Contract Price the best materials suitable for the purpose and methods of construction. The Contractor will have no basis for any claim for additional costs resulting from their failure to identify any required revisions, omissions, or errors, not identified in writing to the Project Manager prior to commencing the Work. The Project Manager and Consultant has the right to approve and issue supplemental drawings and instructions setting forth written orders, instructions, or interpretations, provided such Supplemental drawings or instructions involve no change in the Contract price or this Contract time, unless a Change Order is issued in accordance with the Contract Documents. D9.04 AS-BUILT DRAWINGS During the Work, Contractor must maintain records of all deviations from the Drawings as approved by the Project Manager or Consultant and prepare two copies of As-Built Record Drawings showing correctly and accurately all changes and deviations made during construction to reflect the Work as it was actually constructed. It is the responsibility of the Contractor to check the As-Built Drawings for errors and omissions prior to submittal to the Town and to certify in writing that the As-Built Record Drawings are correct and accurate, including the actual location of all internal piping, electrical/signal conduits in or below the concrete floor. Indicate the size, depth, and voltage in each conduit. To record actual construction, Contractor must legibly mark on-site structures and site Work as follows: 1. Depths of various elements of foundation in relation to finish first floor datum. 2. All underground piping and ductwork with elevations and dimensions and locations of Repair of Sidewalk Trip Hazards Bid No. 2023-36R valves, pull boxes, etc. Changes in location. Horizontal and vertical locations of underground utilities and appurtenances are referenced to permanent surface improvements. Actual installed pipe material, class, etc. 3. Location of internal utilities and appurtenances concealed in the construction, referenced to visible and accessible features of the structure. Air conditioning ducts with locations of dampers, access doors, fans and other items needing periodic maintenance. 4. Field changes in dimensions and details. 5. Changes made by Project Manager’s or Consultant’s written instructions or by Change Order. 6. Details not on original Contract Drawings. 7. Equipment, conduit, electrical panel locations. 8. Project Manager’s or Consultant’s schedule changes according to Contractor’s records and shop drawings. Specifications and Addenda: Legibly mark each section to record: 1. Manufacturer, trade name, catalog number and Supplier of each product and item of equipment actually installed. 2. Changes made by Project Manager’s or Consultant’s written instructions or by Change Order. Approved Shop Drawings: Provide record copies for each process, equipment, piping, electrical system, and instrumentation system. As-built documents must be updated monthly as a condition precedent to payment. A final survey signed and sealed by a surveyor must be provided to the Town at no additional cost, including digital l (CAD and PDF) versions. For construction of new building, or building additions, field improvements, and or roadway improvements as-built drawings must be signed and sealed by a Florida Licensed Registered Land Surveyor. D9.05 RECORD SET Contractor must maintain in a safe place one record copy and one permit set of the Contract Documents, including, but not limited to, all Drawings, Specifications, amendments, Change Orders, RFIs, and Field Directives, as well as all written interpretations and clarifications issued by the Project Manager, in good order and annotated to show all changes made during construction. The record documents must be continuously updated by Contractor throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Construction Change Directives, and Field Directives as well as all written interpretations and clarifications, and all concealed and buried installations of piping, conduit, and utility services. Contractor must certify the accuracy of the updated record documents. The record documents must be clean, and all changes, corrections and dimensions must be given in a neat and legible manner in red. Upon Final Completion and as a condition precedent to Contractor’s entitlement to final payment, the Record Set must be delivered to the Project Manager by the Contractor. The Record Set of Drawing must be submitted in both hard copy and as electronic plot files. D10 CONTRACTOR RESPONSIBILITIES D10.01 LABOR & MATERIALS Unless otherwise provided herein, Contractor must provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities and services necessary for the proper execution and completion of the Work. All materials must be new unless otherwise specified in the Contract Documents. Repair of Sidewalk Trip Hazards Bid No. 2023-36R The Contractor will provide competent, suitably qualified personnel to lay out the work and perform construction as required by the Contract Documents. He will at all times maintain good discipline and order at the site. Minimal Disturbance All Work done by the Contractor, or any Subcontractor must be done with minimal disturbance to the residents of the Town. The noise level must be kept at reasonable levels. All Contractor personnel and Subcontractors must demonstrate and maintain a courteous and responsible demeanor toward all persons while conducting business in the Town. The Town reserves the right to require the Contractor to permanently remove personnel from Work under the Contract that fail to comply with the requirements of this section. D10.02 SUPERVISIONS OF THE WORK Contractor is responsible for all Project management, including any and all subcontracts necessary to ensure that the Work is performed in accordance with the Contract. Project Management includes, but is not limited to: obtaining bids from subcontractors and suppliers; coordinating the securing of all permits; obtaining licenses and inspections; ensuring that subcontractors comply with the requirements of the Contract; performing the Work in accordance with the Contract to the satisfaction of the Project Manager; paying all subcontractors; obtaining release of liens/claims fees; and obtaining temporary and final Certificates of Occupancy or Completion, as applicable. Contractor must have a competent English-speaking supervisor (“Supervisor”) who will represent the Contractor in the field and all directions given to the Supervisor will be as binding as if given to Contractor. Contractor will provide properly licensed personnel where such personnel are required by any rule, regulations, or law. Contractor and the Supervisor will give efficient and sufficient supervision to the Work, using their best skill and attention to ensure the Work is performed in accordance with the Contract Documents. The Project Manager and the Contractor as necessary during the course of the Work to review and agree upon the Work performed and outstanding issues. The Contractor must publish, keep, and distribute minutes and any comments thereto of each such meeting. D10.03 RELEASE OF LIENS/SUBCONTRACTOR’S STATEMENT OF SATISFACTION The Contractor warrants and guarantees that title to all Work, materials and equipment covered by an Invoice, whether incorporated in the Project or not, will pass to the Town upon the receipt of payment by the Contractor, free and clear of all liens, claims, security interests or encumbrances and that no Work, materials or equipment will have been acquired by the Contractor or by any other person performing Work at the site or furnishing materials and equipment for the Project, subject to an agreement under which an interest therein or an encumbrance thereon is retained by the seller or otherwise imposed by the Contractor by a Subcontractor or supplier or any other interested party. The Contractor must, starting with the second (2nd) Invoice, provide the Project Manager with completed Partial or Final Releases of Lien/Subcontractor's Statement of Satisfaction Form for the Project. As an option the Contractor may also submits a Consent of Surety if a payment bond has been provided, authorizing the release of payment by the Surety. Failure to submit such documentation will result in rejection of the Invoice. The Contractor must use the Town’s forms, which are available at the hyperlink provided in Article B9.01. Conditional Release of Liens are not accepted by the Town. Repair of Sidewalk Trip Hazards Bid No. 2023-36R D10.04 PROGRESS PAYMENTS Contractor may make application for payment for Work completed during the Project at intervals of not more than one invoice per month or upon completion and Final Acceptance of the Work. Contractor will be paid based on the line-item breakdown, contained in the Bid Form, with payments based on actual Work performed. All applications shall be submitted in triplicate and the Contractor shall only use the Town’s Contractor Payment Application Form or an invoice format approved by the Town. Supporting evidence to be included with any application for payment shall include, but is not limited to, an updated Project Schedule as required by Article B2.03 and a partial or final release of liens or consent of Surety relative to the Work, which is the subject of the application for payment and any other information required by the Project Manager. Each application for payment shall be submitted in duplicate for approval. The Town shall not pay more than five (5%) of the Total Contract price as mobilization should a schedule of values be required of the contractor Town may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 1. Defective Work not remedied. 2. Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or Town because of Contractor's performance. 3. Failure of Contractor to make payments properly to Subcontractors or for material or labor. 4. Damage to another contractor not remedied. 5. Liquidated damages and costs incurred by Town and/or Consultant for extended construction administration. 6. Failure of Contractor to provide any and all documents required by the Contract Documents. Contractor may be paid for materials or equipment purchased and stored at the Project(s) Site(s) or another location, subject to the sole discretion and approval of the Project Manager. Where a payment request is made for materials or equipment not incorporated in the Project but delivered and suitably stored at the site or at some other location agreed upon in writing, the written documentation must be submitted at the time of request for payment. Payment shall be conditioned upon submission by the Contractor of paid invoices and an executed Material Purchased/Stored On-Premises form to establish the Town’s title to such materials or equipment, or otherwise protect the Town’s interest, including applicable insurance in the name of Town and transportation to the Project site. Contractor retains sole liability to replace such stored materials or equipment as a result of damage or loss for any reason. D10.05 OWNERSHIP OF THE WORK The Contractor is solely responsible for all Work, until Final Completion of the Work. Contractor is liable for all damage, theft, maintenance, and safety until such time as the Town issues a notice of Final Completion. D11 LIQUIDATED DAMAGES The Contractor is obligated and guarantees to obtain final completion of projects within the timeframes established in the Contract, the Work Order, or any approved extension of time the Contractor may be granted by the Town. In the event of a delay in completion beyond the date established in the Contract Repair of Sidewalk Trip Hazards Bid No. 2023-36R or Work Order, the Contractor must pay to the Town for each and every calendar day of unexcused delay, which is hereby agreed upon not as a penalty but as liquidated damages. The per diem amount to be paid in liquidated damages shall be stated in each Work Order as applicable. The Contractor will be notified of any exceptions. The total amount of liquidated damages will not exceed the value of the Work Order. The Town has the right to deduct liquidated damages assessments from any payment due or which may thereafter become due to the Contractor under any contract the Contractor has with the Town. In case the amount available under contracts the Contractor has with the Town is less than the amount of liquidated damages due the Town, the Contractor must pay the difference upon demand by the Town. Should the Contractor fail to compensate the Town for any liquidated damages, the Town will consider this as a form of indebtedness and may deny any future Work under the Contract or any other Town contract until such indebtedness is paid in full to the Town. The Town will notify the Contractor in writing that it is incurring liquidated damages. D12 REQUESTS FOR INFORMATION The Contractor must submit a Request for Information (“RFI”) where the Contractor believes that the Contract Document’s specifications are unclear or conflict. All requests must be submitted in a manner that clearly identifies the specification section or drawing detail, if furnished, where clarification or interpretation is being requested. As part of the RFI, Contractor must include its recommendation for resolution. The Town must respond in writing. The RFI process is not intended to be used to correct defective Work performed by the Contractor. Solutions to correct defective Work, including means and methods are the sole responsibility of the Contractor. Should the RFI process be utilized to correct defective Work, the Contractor may be required to reimburse the Town for any costs incurred by the Town in responding to the RFI. Such reimbursements will be taken as a deduction against any payments due the Contractor. D13 WARRANTY Contractor warrants to the Town that all materials and equipment furnished under the Contract will be new unless otherwise specified and that all of the Work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by the Project Manager, the Contractor must furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by any other provisions within the Contract Documents. All Work must have a one (1) year warranty on labor from the date of acceptance of the Work by the Town. Contractor must provide a minimum written warranty of one (1) year on all equipment, parts, or material unless the manufacturer provides a longer warranty. Where the manufacturer of the equipment, parts, or material provides a warranty greater than one (1) year, or the time frame stipulated then the manufacturer’s warranty term will take precedence. Contractor will be required to provide the Project Manager with a copy of the manufacturer’s warranty prior to the Town issuing final payment. Manufacturer’s warranties will become effective upon Final Completion of the Project. All material and equipment furnished must be fully guaranteed by the Contractor against factory defects and workmanship. At no expense to the Town, the Contractor will correct any and all apparent and latent defects that may occur within the manufacturer’s standard warranty. The Contract Documents may supersede the manufacturer’s standard warranty. Manufacturer’s warranties will become effective upon Final Completion of the Project. Should the Contractor fail to perform any required warranty work the Town, at its sole discretion, may have the work performed by others, and deduct such costs from any monies due to the Contractor from the Town. Where such funds are not available, the Town will bill the Contractor Repair of Sidewalk Trip Hazards Bid No. 2023-36R and Contractor will reimburse the Town within thirty (30) calendar days. The Town may take any necessary and appropriate action provided under this Contract or with law to collect such payment due the Town. D14 SUBSTANTIAL COMPLETION, PUNCHLIST & FINAL COMPLETION The Work will be substantially complete when the Project Manager, in the reasonable exercise of his/her discretion determines that the Work is complete and there are no material or substantial variations from the Contract and the Work is fit for its intended purpose. Upon Substantial Completion, the Project Manager and the Contractor will sign the Substantial Completion Inspection Form. The signing of this form does not relieve the Contractor from its obligation to complete the Project. When the Contractor believes that the Work is substantially complete, the Contractor must request in writing that the Project Manager or Consultant inspect the Work to determine if Substantial Completion has been achieved. Where the Work requires the Contractor to obtain a Certificate of Completion no request for Substantial Completion inspection is to be submitted until the Contractor has obtained the Certificate(s) of Completion. The Project Manager or Consultant will schedule the date and time for any inspection and notify the Contractor and any other parties deemed necessary. During this inspection, the Project Substantial Completion Inspection Form will be completed as necessary. Any remaining Construction Work must be identified on this form, and it will be known as Punch List Work. The Punch List must be signed by the Project Manager and the Contractor confirming that the Punch List contains the item(s) necessary to complete the Work. The failure or refusal of the Contractor to sign the Project Substantial Completion Inspection Form or Punch List will not relieve the Contractor from complying with the findings of the Project Substantial Completion Inspection and completing the Project to the satisfaction of the Town. The Project Manager or Consultant, and the Contractor will agree on the time reasonably required to complete all remaining Work included in the Punch List. Upon Substantial Completion and the receipt and acceptance of any required documentation, including warranty documents, the Project Manager will determine that a Project has achieved Final Completion and authorize final payment. The acceptance of final payment will constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the Contract and identified by Contractor as unsettled at the time of the application for final payment. D15 ACCEPTANCE AND FINAL PAYMENT Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, Project Manager will, within ten (10) calendar days, make an inspection thereof. If Project Manager find the Work acceptable, the requisite documents have been submitted and the requirements of the Contract fully satisfied, and all conditions of the permits and regulatory agencies have been met, a Final Certificate for Payment will be issued by Project Manager, stating that the requirements of the Contract have been performed and the Work is ready for acceptance under the terms and conditions thereof. Before issuance of the Final Certificate for Payment, Contractor must deliver to the Project Manager a final release of all liens arising out of the Contract, receipts in full in lieu thereof; an affidavit certifying that all suppliers and subcontractors have been paid in full and that all other indebtedness connected with the Work has been paid, and a consent of the surety to final payment; the final corrected as-built drawings; operations and maintenance data, and the final bill of materials, if required, and payment application. Contractor must deliver the written Contractor’s and all Manufacturer’s warranties prior to issuance of the final invoice. Repair of Sidewalk Trip Hazards Bid No. 2023-36R If, after the Work has been substantially completed, full completion thereof is materially delayed through no fault of Contractor, and Project Manager so certifies, Town will, upon such certification of Consultant, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. Such payment will be made under the terms and conditions governing final payment, except that it will not constitute a waiver of claims. The acceptance of final payment will constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the Contract and identified by Contractor as unsettled at the time of the application for final payment. D16 NDPES REQUIREMENTS Contractor must comply with the State of Florida rules and regulations for the National Pollutant Discharge Elimination System (NPDES) including but not limited to all permitting, Notices of Intent, and the Storm Water Pollution Prevention Plan (SWPPP). All costs for NPDES and SWPPP must be included in the Bid price. For further information on compliance requirements for NPDES and SWPPP visit the State of Florida website at http://www.dep.state.fl.us/water/stormwater/npdes/. Contractor is responsible for obtaining, completing, and paying for any required NPDES application or permits that may be required. END OF SECTION SIGNATURE PAGE FOLLOWS Repair of Sidewalk Trip Hazards Bid No. 2023-36R SECTION E. CONTRACTOR’S BID
Official documents
City legislative record from the city's public agenda system. The Ask-Statura brief is an automated interpretation grounded in this item's metadata, not legal advice.