Review roadway and traffic modification regulations
Ask Statura about this item
What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.
Lifecycle
Item text
DATE: April 26, 2024 TO: The Honorable Mayor and Members of the Village Council FROM: Yocelyn Galiano, ICMA CM, Village Manager RE: Roadway and Traffic Modification Regulations Following discussion of potential future traffic calming project(s) along SW 72 Avenue on April 18, 2024, the Village Council requested a memorandum detailing the roadway regulations that govern the streets in…
Show the full text (99K chars)
DATE: April 26, 2024 TO: The Honorable Mayor and Members of the Village Council FROM: Yocelyn Galiano, ICMA CM, Village Manager RE: Roadway and Traffic Modification Regulations Following discussion of potential future traffic calming project(s) along SW 72 Avenue on April 18, 2024, the Village Council requested a memorandum detailing the roadway regulations that govern the streets in Pinecrest. Below please find said explanation of regulations that impact the Village roadway network. INTERLOCAL AGREEMENTS On November 8, 1996, the Village entered into an interlocal agreement (Road Transfer Agreement) with Miami-Dade County that transferred and conveyed the jurisdiction, ownership and control of all public roads within the corporate limits of the Village (Village roads) except for the following roads: a) SW 57th Avenue from SW 88th Street to Old Cutler Road b) Old Cutler Road within the boundaries of the Village of Pinecrest, including that portion of Old Cutler Road that intersects with SW 136th Street c) SW 88th Street from US 1 to SW 67 Avenue d) SW 136th Street from that portion that intersects with Old Cutler Road, westward to US 1 In accordance with language in the Road Transfer Agreement, the aforementioned exempt roads “remain within the jurisdiction of the Village but continue to be designated and maintained as County roads”. Further, county-wide funds continue to be used for street signs, traffic signals and other county-wide responsibilities irrespective of the transfer of ownership. Additionally, US 1 and the Palmetto Expressway situated within the corporate limits remained within the jurisdiction of the state. On May 11, 2001, the Village entered into an interlocal agreement (Roadway Signage Agreement) with the County that allows the Village to install and maintain street name signs, parking restriction signs, and speed limit signs on Village maintained streets. On October 6, 2017, the Village entered into an interlocal agreement (Traffic Engineering Function Agreement) with Miami-Dade County that allows the Village to install and maintain the following designated types of traffic calming devices, and/or signs (collectively “Traffic Calming Devices”) only on those municipal streets operated and maintained by the Village within its boundaries, and not less than 250 feet from existing traffic signals, County roadways, State roadways and the boundaries of the Village limits; or within school zones, or adjacent to bicycle facilities or hospitals: a) Traffic Circles b) Speed Humps c) In-street Pedestrian Crossing Signs d) Raised Intersections Any such Traffic Calming Devices (as previously listed) may be installed on local municipal streets only after the following two-step process is undertaken: 1) An appropriate traffic engineering study has been performed and signed and sealed by a Florida licensed professional engineer, and has received written approval by the Village Manager or his/her designee. A copy of such traffic study must be submitted to the County’s Department of Transportation and Public Works. 2) Construction design plans must utilize the standard County design or the standard Village design as provided as exhibits in the agreement (attached hereto for information as Exhibit A). Said plans must be signed and sealed by a Florida licensed professional engineer. If the design adheres to the adopted standards, no additional review or approval by the County is required prior to installation. To the extent the design plans deviate from the standard County design, such plans must be submitted to the County for its review and written approval. All said Traffic Calming Devices installed by the Village shall conform to the applicable requirements established by the following publications including latest revisions: a) Manual on Uniform Traffic Control Devices for Streets and Highways, U. S. Department of Transportation Federal Highway Administration b) Standard Highway Signs, U. S. Department of Transportation, Federal Highway Administration c) A Policy on Geometric Design of Highways and Streets, American Association of State Highway and Transportation Officials (AASHTO) d) Roundabouts: An Informational Guide, Federal Highway Administration, U. S. Department of Transportation e) Florida Roundabout Guide, Florida Department of Transportation f) Florida Department of Transportation' s Standard Specifications for Road and Bridge Construction. g) Florida Bicycle Facilities Planning and Design Handbook, Florida Department of Transportation h) Miami -Dade County Public Works Standard Details Manual i) Miami -Dade County Traffic Flow Modification(s) / Street Closure Procedure, Revised January, 2009, or any other comparative criteria available to municipalities as may be in existence or approved in time by the County, with the decision to elect one option or the other to be determined at the Village' s discretion FLORIDA STATUTES Chapter 316 of the Florida Statutes governs the state’s uniform traffic control regulations.
189, F.S., Municipal and County Speed Zones states that the maximum speed within any municipality is 30 miles per hour. With respect to residential districts, a municipality may set a maximum speed limit of 20 or 25 miles per hour on local streets and highways after an investigation determines that such a limit is reasonable. A municipality may set speed zones altering the speed limit, both as to maximum, not to exceed 60 miles per hour, and minimum, after investigation determines such a change is reasonable and in conformity to criteria promulgated by the Florida Department of Transportation, except that no changes shall be made on state highways or connecting links or extensions thereof, which shall be changed only by the Florida Department of Transportation. MIAMI-DADE COUNTY CODE Speed Zone Limits Speed zones throughout Miami-Dade County are governed by Section 30-4 - Establishment of county speed zones; enforcement and penalties. It states that all speed zones on County and municipal streets, roads and highways shall be set in accordance with the provisions of
189, Florida Statutes, as such may be amended from time to time. Traffic Flow Modifications Miami-Dade County has exclusive jurisdiction over traffic control within a municipality. As such, the municipal jurisdictions are required to submit a traffic study to the Miami-Dade County Transportation and Public works Department for their review and approval. The study must support the proposed traffic flow modification(s)/street closure(s) and show that County and State roadways would not be adversely impacted as a result of such traffic flow modification(s)/street closure(s). Miami-Dade County developed a uniform set of guidelines or warrants to be followed by local municipalities, the County and the State for implementing neighborhood and localized area traffic control; and developed a standardized set of procedures to be followed by local applicants desiring enhanced neighborhood traffic control. These guidelines are detailed in the Miami-Dade County Traffic Flow Modification(s) / Street Closure(s) Procedure which was last revised in 2009 (see Exhibit B), and must be followed by the Village for all traffic calming measures including but not limited to those listed in the Traffic Engineering Function Agreement. Among a number of steps, the procedure includes a step that requires concurrence from a specified number of affected residents and/or property owners as follows: • Traffic Circles: Requires 100% concurrence of affected residents and/or property owners from four (4) corners adjacent to the proposed circles. This may be extended to the full block should a larger representation be desired by the District Commissioner. • Traffic Flow Modifications other than Traffic Circles: Requires concurrence of two- thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots received). Non-voters are not counted (ballots not returned). • Municipal Jurisdictions: In lieu of concurrence from the affected residents and/or property owners, a municipality may pass a resolution after a public hearing requesting the Miami-Dade Transportation and Public Works Department consider the proposed traffic flow modification(s)/street closure(s). Exhibit A t9.0o' S. Oa w' e. Q 3 0 1 3 ` O o 1 TYPE' B' MEDIAN CURB f I U) r g o IMOf or wlm s' swnL faSTOMTION 31' RMa13 a TYPED' MEDIAN CURB SW 000 ST R / W LINE' yg" 4.• a' tr 0AI 24 la° D• TYPE' F CURB & GUTTER e. DD• See Miami Dade County Public Works Manual, Standard Rood Details: Curbing R 14. 1 to R 14. 5 TYPICAL 0.50' 001] 14' N R44. 1o. DD' NOTE: TYPICAL PER FHWA ROUNDABOUT GUIDELINE, MINIMUM BUFFER BETWEEN BACK OF CURB AND FRONT OF SIDEWALK TO BE 2'. . MONO. DESCNPTK) N UIaT9 OUANT. IPaTO 102 - 1 11D - s- t - I MAIN} aNANCE OF iRAFFlC OVAL aF VEMENT dt c dale • We. dl cone ter lol W. O. S. Y. 180 - a ASPNAI. T a RSE ( MLV 6 tnlch h S tcy¢ rc IndW¢¢ ¢ uaw NOn roaewa ¢ nd of fun Oe ETr l S. Y. 334 - 2 - 1 1 310- 2A T_ ASPHALTIC CCRETE T e 3 I I1dsM NC CORDRETE OURS AND GUTTER Tone 322 - 1 1 528 - 70- 28 CONCR SIDEWALK 4' Ulck 3000 S eenw • F1faIX PAVERS d~ 1 x. 578- - 1 SODDING Pmaacda Banta w match e. bn' aoe• Inds _' Y 05 - 4 700 - 40 - 01 PALMS CILMP TYPE B TO 2D HT w ROADSIDE SIGN induoln del Y et • 0 - 12 SF a¢ a Iona EA 700 - 1 - 12 71/ - 11 - 121 RFFLECOVE PAVEMENT MARKER. PERMANENT SS circle 34 • e of 4 Iq SOLID TRAFFIC STRIP THERMOPLASTIC 8 . 0 1 71 - 11 - 125 711- ) - 231 SOLID TRAFFC STRIPE. THERMaPLArnC 2s SOLID TRAFFIC STRPE. THERNOPIASOC 0' LLF. 711 - 11 - 224 71 - 11 - 112 SOLID 8 D TRRADC SRRIPEL . TTH TBICC 11 711_ 2 W . to TOTAL COST Cirde Ah od) I W16 - 9P W J Q I- . no. 304 CR 9 Typ. Flontl cure nde, . f . r to WZ i I iI 3 0 o Keep Right) R4 - 7 FDOT Indaa No. 300 Typ. 1 g' 1 N Pedealrion Goaainq) 1 11- 2 R4 - 7 W2 - 6 W76- 7P W16 - 9 W11 - 2 Yield) RI - 2 L•. e• d~ 1 x. qqy MIAMI - DADE COUNTY CIRCLE 50'- 50' RW MIAMI - DADE/ PUBLIC WORKS '.. ENWRNE I WASTE MANAGEMENT TRAFFIC ENGINEERING oIV151oN 010 1 002014 pn0o J. M. J. MUSING 09/ DN2D14 SHEET 1 OF 1 REV. DATE DATE DESCRIPTION BY: DESIGN DATE I FDOT 2010 Reemawe[ Sle waiA typ I- . no. 304 CR 9 Typ. Flontl cure nde, . f . r to Cerot Type F n. yn e. all. r Typ. RI - 2 FDOT Indaa No. 300 Typ. Cen• L N.. PaV• m TW. Type ' 9' Meelan Cvr end. Pa. w 11- 2 R4 - 7 W2 - 6 W76- 7P W16 - 9 R/ W UNE Type V M. elen are T'. R/ W LINE 8 Sae . Tt? i: C- : -: :: i {• y nBa 1 SW 000 ST 11 Sed' Tyli. i R/ W LINE1 LINE L a0 z 6• slow T/ W 16" Tallow Typ. W2- 6 ft4 - 7 R- 2 12" While Typ. W1 6- 9P W11 - 2 24• Whit. Typ. W16 - 7P 6" Yen— Typ. 8" White Typ. 00 6_ Whit. ( P— nt Edge MOCW") Typ. a. White - 2' S41pe k 4" Skip. Typ. 1•: :•: J W11 - 2 W16 - 71' 1.•1;.; 7-. tit r. e•. 4 w J wZ I J W16691' qqy MIAMI - DADE COUNTY CIRCLE 50'- 50' RW MIAMI - DADE/ PUBLIC WORKS '.. ENWRNE I WASTE MANAGEMENT TRAFFIC ENGINEERING oIV151oN 010 1 002014 pn0o J. M. J. MUSING 09/ DN2D14 SHEET 1 OF 1 REV. DATE DATE DESCRIPTION BY: DESIGN DATE nvDoo ms 7 771, HS 04 nvDoo ms AV 000 MS Q( 7- D ti MA JNE ni HS AV 000 MS Q( 7- D ti MA JNE ni z : L11. 4. f- I 19W4 lk I MY YYPE, fy mFOLAN CAM8 1 II mcK of OUPM so RMORATIOK 3 WIUS rIj 700— ! il— C tows- m cN —" Ic A - K — la V— a" 044 1 TYPED' MEDIAN CURB svv 000 ST 1W LINE JL TYPE' P- CURB S. GUTTER See Wcmt Code County Fl ki Pub tic Works Monvol. lavA coal Stc, dard Road Detolls: KlbfFq R 14. 1 to R 14. 6 19W4 lk I MY 700— ! il— C tows- m cN —" Ic A - K — la V— a" 044 1 F. i lavA coal Exhibit B TRAFFIC FLOW MODIFICATION(S)/ STREET CLOSURE(S) PROCEDURE PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION Revised January 2009 Traffic Flow Modification(s)/Street Closure(s) Procedure Page 2 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc TRAFFIC FLOW MODIFICATION(S)/ STREET CLOSURE(S) PROCEDURE TABLE OF CONTENTS Table of Contents Page 2 Introduction Page 3 Phase 1: Summary of Procedure Page 4 Phase 2: Summary of Procedure Page 5 Phase 1: Procedure Details Page 8 Phase 2: Procedure Details Page 15 Appendices: I. Policy on Traffic Calming Measures Page 26 II. Policy on Traffic Calming for Low Volume Narrow Streets Page 27 III. Policy on Speed Humps Page 28 IV. Report on Speed Humps Page 29 V. Traffic Flow Modification/ Street Closure Application Form Page 34 VI. Interdepartmental Review Page 36 VII. Sample Ballot 1: Traffic Circles, PWD Use Page 37 VIII. Sample Ballot 2: Traffic Calming Devices, PWD Use Page 38 IX. Sample Ballot 3: Residents/Property Owners and HOA Use Page 39 Traffic Flow Modification(s)/Street Closure(s) Procedure Page 3 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 4 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc IINNTTRRO ODDUUCCTTIIO ONN The Public Works Department and Metropolitan Planning Organization obtained the professional engineering services of Frederic R. Harris, Inc. to conduct a Street Closure/Traffic Flow Modification Study that was completed in July 1996. The primary objectives of the study were to: • Evaluate and recommend traffic control alternatives to street closures; • Develop a uniform set of guidelines or warrants to be followed by local municipalities, the County and the State for implementing neighborhood and localized area traffic control; and • Develop a standardized set of procedures to be followed by local applicants desiring enhanced neighborhood traffic control. A Steering Committee was assembled and periodically convened to meet with the Consultant to provide input throughout the study process. The Steering Committee consisted of representatives from the Florida Department of Transportation, Miami-Dade County and local municipalities; some of whom had previous experience with citizen requests for street closures. The draft report was developed as a series of Technical Memorandums that were reviewed by the steering committee and later compiled to form the final report. The Steering Committee developed standardized procedures and guidelines for use by the public, local officials, or other private sector interests requesting traffic flow modifications that may affect local neighborhoods as well as other roadway traffic patterns. The intent of these procedures was to provide Miami-Dade County and municipalities with a uniform approach to facilitate government action in response to requests to restrict local traffic access via street closures, other physical modifications or traffic calming alternatives. These proposed procedures were also intended to ensure that such issues are given appropriate study and timely response, and that the full range of traffic and community impacts is considered. The procedures addressed traffic issues in an incremental fashion with the least restrictive measures applicable to a particular situation tested first, then monitored and supplemented, modified or replaced with more stringent measures, if necessary. When non-traffic issues enter into the decision process, the procedures weigh both the traffic and non-traffic implications of a street closure or traffic flow modification. Although each citizen request is unique, the process applies equally to any residential traffic control situation and provides government officials with an objective tool to address neighborhood traffic control issues. On May 20, 1997, the Miami-Dade County Board of County Commissioners approved Resolution No. R-545-97 authorizing an eighteen-month pilot program to implement and evaluate traffic flow modification/street closure study recommendations. A subsequent extension was granted under Resolution No. R-66-00 on January 25, 2000. Since then, County staff has been using this procedure. It has been enhanced over the span of the last twelve years and updated and revised to appropriately address the needs of residents of Miami-Dade County in order to improve their safety as well as their livability standards. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 5 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc SSUUM MM MAARRYY O OFF PPRRO OCCEEDDUURREE Phase 1: INITIAL TRAFFIC STUDY BY MIAMI-DADE COUNTY PUBLIC WORKS 1.1 All applicants, whether residing within unincorporated Miami-Dade County or a municipality, may submit a request for a traffic flow modification(s)/street closure(s) to the Miami-Dade County Public Works Department (PWD) in the form of a letter or complete the application in Appendix V. 1.2 PWD will conduct the initial traffic study to confirm the applicant’s concerns and to identify and recommend traffic calming measures. Should the request be initiated through or by a municipality or the Florida Department of Transportation, then these agencies, at their option, may conduct traffic studies utilizing their staff or a traffic consultant. 1.3 PWD will make the determination of whether the location(s) falls within unincorporated Miami-Dade County or a municipality, and coordinate the review with the respective municipality. 1.4 PWD will make the determination of whether the review from various affected entities, such as Police, Fire, etc., is required. If review is not required, proceed to Step 1.6. 1.5 Should review be required, PWD will request the affected entities, including but not limited to, Police, Fire, respective municipality, etc., to review the request and provide comments. If review by any of the entities results in a denial as a result of concerns which cannot be resolved, or if the proposed traffic flow modification(s)/street closure(s) does not meet all criteria outlined under this process or applicable County and State laws, then the application will be denied. 1.6. PWD will make the determination if concurrence from the required affected residents and/or property owners is required. If concurrence is not required, proceed to Step 1.8. Required Concurrence: Traffic Circles: Requires 100% concurrence of affected residents and/or property owners from four (4) corners adjacent to the proposed circles. This may be extended to the full block should a larger representation be desired by the District Commissioner. Traffic Flow Modifications other than Traffic Circles: Requires concurrence of two- thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots received). Non-voters are not counted (ballots not returned). Municipal Jurisdictions: In lieu of concurrence from the affected residents and/ or property owners, a municipality may pass a resolution after a public hearing requesting PWD to consider the proposed traffic flow modification(s)/street closure(s). 1.7 PWD will mail out ballots to obtain concurrence from the affected residents and/or property owners. Should the required concurrence be secured, PWD will proceed to the next step. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 6 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Should the affected residents and/or property owners fail to reach a consensus to implement the proposed improvement, then the process ceases. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 7 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Reinitiating the balloting process: Should residents and/or property owners desire to reinitiate the balloting process, it can be initiated after ninety (90) calendar days from the date that ballots were opened, provided that the applicant is willing to pay the processing and mailing cost for the ballots. 1.8 PWD will schedule the construction of temporary or permanent traffic calming device as funds and contracts are identified. 1.9 PWD will assess the traffic impact and determine if the improvements are acceptable to the affected area residents and/or property owners. 1.9.1 Should the determination be made by PWD staff that temporary devices have caused adverse impact, such devices will be removed by PWD. 1.9.2 If improvements are not acceptable to affected area residents and/or property owners: 1.9.2.1 Residents and/or property owners may request removal of temporary traffic calming devices as per a requirement of Step 1.6. Such request must be initiated in the form of a petition signed by 10% of the affected residents and/or property owners. 100% of the adjacent affected residents and/or property owners is required for the traffic circles petition. Or 1.9.2.2 Residents and/or property owners may proceed to Phase 2 procedure, Step 2.1. 1.9.3 Improvements did not cause adverse impact and are acceptable to residents: proceed to Step 1.10. 1.10 PWD will initiate the design. 1.11 PWD will install permanent traffic calming devices as funds and contracts are identified. PHASE 2: TRAFFIC STUDY BY APPLICANT’S CONSULTANT 2.1 In the event that the action taken by PWD in accordance with Phase 1 procedure is unacceptable to the municipal jurisdiction, or the affected area residents and/or property owners, they have the option of engaging a traffic consultant, at their cost, in order to perform an independent traffic study. Should the request be initiated through or by a municipality or the Florida Department of Transportation, then these agencies, at their option, may conduct traffic studies utilizing their staff or a traffic consultant. 2.2 The consultant conducts a pre-implementation traffic study to identify and confirm traffic concerns (i.e., traffic intrusion, excessive traffic volume, speeding, traffic accidents, etc.) and to determine if the collected traffic data meets the PWD criteria for traffic calming devices. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 8 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 2.3 The consultant identifies traffic calming alternatives and generates staged alternative plans. 2.4 The consultant performs pre-implementation study to determine potential impacts of proposed traffic calming devices on roadways within and outside of the study areas, and documents findings in the form of a report. 2.5 PWD makes the determination whether the location is within a municipality or unincorporated Miami-Dade County and coordinates the review with the respective municipality. 2.6 PWD makes determination if the review from various affected entities, such as Police, Fire, etc., is required. 2.7 PWD requests various affected entities, to include Police, Fire, etc., to review the request and provide their comments. 2.8 PWD reviews comments from various entities and makes determination whether to approve or deny the request. 2.9 PWD makes determination if concurrence from the affected residents and/or property owners is required. If concurrence is not required, proceed to Step 2.11. Required Concurrence from affected Residents and/or Property Owners: Traffic Circles: Requires 100% concurrence of affected residents and/ or property owners from four (4) corners adjacent to the proposed circles. This may be extended to the full block should a larger representation be desired by the District Commissioner. Traffic Flow Modifications excluding Traffic Circles: Requires concurrence of two-thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots received). Non-voters are not counted (ballots not returned). Municipal Jurisdictions: In lieu of concurrence from the affected residents and/or property owners, a municipality may pass a resolution after a public hearing requesting PWD to consider the proposed traffic flow modification(s)/street closure(s). 2.10 Applicant obtains concurrence from the affected residents and/or property owners, if required. In the event that the affected residents and/or property owners do not approve the proposed improvements, return to Step 2.3. 2.11 Applicant’s contractor installs temporary traffic calming devices upon securing approvals and permits from appropriate entities. 2.12 Applicant’s consultant conducts post-implementation study to determine if traffic calming measures are operating at an acceptable level to the residents and/or property owners. 2.13 If the post-implementation study results, as well as the traffic calming devices are acceptable to residents and/or property owners, the process is completed unless residents and/or property owners desire further aesthetic enhancements. Should further aesthetic enhancements be required, proceed to the next step. If the post-implementation study Traffic Flow Modification(s)/Street Closure(s) Procedure Page 9 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc results are unacceptable, return to Step 2.3. 2.14 Applicant’s consultant designs permanent traffic calming devices if the temporary devices are installed. 2.15 Applicant’s contractor installs permanent traffic calming devices upon securing approvals and permits from appropriate entities. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 10 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc PROCEDURE DETAILS PHASE 1: INITIAL STUDY BY MIAMI-DADE COUNTY PUBLIC WORKS (PWD) 1.1 Submittal of Application for Traffic Flow Modification(s)/Street Closure(s) In order for an applicant to submit an application for a traffic flow modification(s)/street closure(s), including the re-opening of a previously closed street(s), the applicant, whether residing in unincorporated Miami-Dade County or within a municipality, shall follow the procedures outlined herein: 1.1.a Submit the request in the form of a letter or complete the application form in Appendix V , and 1.1.a.1 Identify any traffic concerns, such as: • Traffic intrusion • Excessive traffic volume • Speeding • Traffic accidents • Other 1.1.a.2 Explain how long these problems have existed and the conditions that have caused these problems. 1.1.a.3 Identify the type of traffic control measure that is being requested and include a map illustrating the location(s) of proposed traffic flow modification(s)/street closure(s). 1.1.a.4 Identify on whose behalf the application is being made. • Homeowners’ Association • Individual • Other 1.1.a.5 All applicants, whether residing in unincorporated Miami-Dade County or within a municipality, must submit their letter or a completed application to PWD at the following address: Chief, Traffic Engineering Division Miami-Dade County Public Works Department 111 N.W. First Street, Suite 1510 Miami, Florida 33128-1970 Traffic Flow Modification(s)/Street Closure(s) Procedure Page 11 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 1.1.b. If the request for traffic flow modification(s)/street closure(s) is due to reasons other than traffic, such as crime, etc., the following procedures shall be utilized: 1.1.b.1 Creation of a Special Taxing District: Contact PWD, Special Taxing District Division to obtain procedure details. 1.1.b.2 Reverting of the Public Right-of-way to Adjacent Property Owners: 1.1.b.2.1 If the location falls within unincorporated Miami-Dade County, please contact PWD, Right-of-Way Division to obtain additional information. 1.1.b.2.2 If the location falls within a municipality, contact the respective municipality and follow their established procedures. 1.1.b.3 Converting of a public roadway to a private street to be maintained by the Homeowners’ Association (HOA): See 1.1.b.2.1 and 1.1.b.2.2 Miami-Dade County has exclusive jurisdiction over traffic control within a municipality. As such, the municipal jurisdictions are required to submit a traffic study to PWD for their review and approval. The study must support the proposed traffic flow modification(s)/street closure(s) and show that County and State roadways would not be adversely impacted as a result of such traffic flow modification(s)/street closure(s); creating a Special Taxing District or due to reverting of the right-of-way or converting a public street to a private street. 1.2 Initial Traffic Study by PWD PWD will conduct an initial study to confirm traffic concerns and to identify and recommend the traffic calming measures. Should the request be initiated through or by a municipality or the Florida Department of Transportation, then these agencies, at their option, may conduct traffic studies utilizing their staff or a traffic consultant. The scope of the initial study, depending on the nature of the complaint, may include twenty- four (24), forty-eight (48), or seventy-two (72) hour counts, turning movement counts, license plate survey, spot speed studies, etc. Requests for traffic flow modification(s)/street closure(s) and reopening of previously closed streets, will be considered by PWD on a case-by-case basis, for streets meeting the following criterion. 1.2.a The streets for which modification(s) are proposed must be local or collector residential street(s) and not arterial roadways or part of the State Highway System. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 12 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 1.2.b The proposed closure(s) shall not create street(s) longer than 600 feet, as per Miami-Dade County Code, Section 28-14.6. 1.2.c The street(s) proposed for closure shall have sufficient right-of-way to adequately construct T-turn around or cul-de-sacs as per PWD Standards Details. 1.2.d Pre-implementation data confirms that a problem exists. 1.2.e The traffic study reveals that the proposed traffic flow modification(s)/street closure(s) meets the criteria for the installation of traffic calming devices on Appendices I, II and III, and the proposed measures will not adversely affect the traffic on nearby streets, by the diverted traffic. 1.2.f The projected vehicular volumes on any other adjoining street do not exceed the threshold limits stated in Phase 2, Step 2.4.a. 1.2.g The changes in traffic flow will not create any liability to the County. 1.3 Requests within a Municipality 1.3.a If the request for traffic flow modification(s)/street closure(s) falls within unincorporated Miami-Dade County, PWD coordinates the review as per Step 1.5.a. 1.3.b If request for traffic flow modification(s)/street closure(s) falls within a municipality, PWD will request affected entity to coordinate the review, as per Step 1.5.b. 1.4 Review Required from Various Entities PWD will make the determination if the proposed traffic calming measures will impact other entities and if review is required from affected entities, to include Police, Fire, etc. If review is required, then proceed to next step. If review is not required, proceed to Step 1.6. 1.5 Preliminary Review by Various Entities 1.5.a If the request for traffic flow modification(s) or street closure(s) falls within unincorporated Miami-Dade County, then PWD, Traffic Engineering Division, shall coordinate a review with agencies potentially affected by the traffic flow modification(s)/street closure(s), which may include, but not be limited to, the following entities: • Miami-Dade County Fire Rescue (MDFR). • Affected Municipal Fire Department. • Miami-Dade Police Department (MDPD). • Affected Municipal Police Department. • Miami-Dade County Planning and Zoning Department (MDP&Z). Traffic Flow Modification(s)/Street Closure(s) Procedure Page 13 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc • Miami-Dade County Public Schools (MDCPS). • Miami-Dade Transit (MDT). • Florida Department of Transportation (FDOT). 1.5.a.1 PWD, Traffic Engineering Division, shall review all comments brought forth by the aforementioned entities. If all agencies and departments concur, then the Director of PWD will approve the application. However, under the following conditions the application for traffic flow modification(s)/street closure(s) will be denied. 1.5.a.1.1 Comments made by any entity revealed concerns, which cannot be resolved. 1.5.a.1.2 The proposed traffic flow modification(s)/street closure(s) or extenuating circumstances do not meet all criteria outlined under this process or applicable State laws. These reviews shall be relevant to the agency reviewing the proposed traffic flow modification(s)/street closure(s). The scope of the traffic review shall be determined on a case-by-case basis by PWD. 1.5.b If the request affects local streets within a municipality, then PWD will request the municipality to coordinate the review with agencies potentially affected by the traffic flow modification(s)/street closure(s), which may include, but not be limited to, the following entities: Municipal Fire Department. Miami-Dade County Fire & Rescue (MDFR). Municipal Police Department. Miami-Dade County Police Department (MDPD). Miami-Dade County Planning and Zoning Department (MDP&Z). Miami-Dade County Public Schools (MDCPS). Miami-Dade Transit (MDT). Florida Department of Transportation (FDOT). PWD, Traffic Engineering Division. These reviews shall be relevant to the agency reviewing the proposed traffic flow modification(s)/street closures(s). The scope of the traffic review shall be determined on a case-by-case basis by PWD. 1.5.b.1 The municipal representative shall review all comments brought forth by the aforementioned entities. The municipality, under the following conditions, shall deny the application for traffic flow modification(s)/street closure(s): 1.5.b.1.1 Comments made by any entity revealed concerns, which cannot be resolved. 1.5.b.1.2 The proposed locations or extenuating circumstances do not meet all criteria outlined under this process or applicable State laws. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 14 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 1.5.c If the preliminary review performed by the various affected entities results in denial of the request, then the process ceases. 1.5.d If the preliminary review performed by the various affected entities results in concurrence with the request, then the municipality endorses the request and forwards it to PWD, Traffic Engineering Division, for their review and approval. If the request is approved by PWD, proceed to the next step. 1.6. Is Concurrence from the Affected Residents and/or Property Owners Required? PWD, depending on the proposed traffic calming devices, will determine if concurrence from the affected residents and/or property owners is required. Required Concurrence: Traffic Circles: Requires 100% concurrence of affected residents and/or property owners from four (4) corners adjacent to the proposed circles. This may be extended to the full block should a larger representation be desired by the District Commissioner. Traffic Flow Modifications other than Traffic Circles: Requires concurrence of two- thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots received). Non-voters are not counted (ballots not returned). Municipal Jurisdictions: In lieu of concurrence from the affected residents and/or property owners, a municipality may pass a resolution after a public hearing requesting PWD to consider the proposed traffic flow modification(s)/street closure(s). The affected area within unincorporated Miami-Dade County will be established by the County’s staff. If the location falls within a municipality, the affected area will be established by both the City’s and the County’s staff. The affected area may include, but is not limited to, those properties where normal travel routes to and from the affected area are to be altered by the traffic flow modification(s)/street closure(s) and/or properties that are significantly impacted by the diverted traffic. 1.6.a If concurrence from the required affected residents and/or property owners is required, proceed to next step. 1.6.b If concurrence from the required affected residents and/or property owners is not required, proceed to Step 1.8. 1.7. Approval of the Plan by Homeowners 1.7.a PWD, under certain circumstances, may elect to obtain concurrence from the affected residents and/or property owners. 1.7.b PWD will mail out ballots to obtain concurrence of the affected residents and/or property owners. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 15 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 1.7.c If the location is within a municipality, that jurisdiction, in lieu of the concurrence from the affected residents/property owners may elect to have their elected body vote on the proposed traffic flow modification(s)/street closure(s) after a public hearing and may submit the resolution to PWD requesting consideration of the proposed traffic flow modification(s)/street closure(s). 1.7.d If the required number of affected residents and/or property owners as per Step 1.6 do not approve the proposed improvements by PWD, then the process ceases. 1.7.e If the residents and/or property owners desire to reinitiate the process, such process can be reinitiated after ninety (90) calendar days from the previous opening date of the ballots. However, the applicant will be charged with the mailing and processing cost, which will be determined on a case-by-case basis. 1.8 Implementation of Temporary Traffic Calming Measures 1.8.a If the request for traffic flow modification(s)/street closure(s) falls within unincorporated Miami-Dade County, PWD will implement the improvements as funding and contracts are identified. 1.8.b If the request falls within a municipality, PWD will coordinate with the municipality for the installation of the traffic calming devices. 1.9 Evaluation of Temporary Traffic Calming Measures: If the evaluation of the temporary devices by PWD reveals that: 1.9.a The improvements implemented by PWD did not cause an adverse impact to traffic and are acceptable to the residents and/or property owners, proceed to Step 1.10. 1.9.b The improvements implemented by PWD are unacceptable to the residents and/or property owners, or create unexpected operational and/or safety concerns, then: Either the removal of temporary devices are requested through the process as per step 1.6, or a more restrictive traffic flow modification(s)/street closure(s) may be considered as per Phase 2, Step 2.1. 1.10 Design of Permanent Traffic Calming Devices 1.10.a If the location falls within unincorporated Miami-Dade County, PWD will develop construction plans for permanent traffic calming devices as funding and contracts are identified. 1.10.b If the location falls within a municipality, PWD will coordinate the design of permanent traffic calming devices with the municipality. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 16 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 1.11 Installation of Permanent Traffic Calming Devices 1.11.a If the location falls within unincorporated Miami-Dade County, PWD will install permanent traffic calming devices, as funding and contracts are identified. 1.11.b If the location falls within a municipality, PWD will coordinate the installation with the municipality. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 17 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc PHASE 2: TRAFFIC STUDY BY APPLICANT’S CONSULTANT 2.1. Applicant Engages a Traffic Consultant to Perform a Traffic Study In the event that the action taken by PWD in accordance with Phase 1 procedures is unacceptable to the municipal jurisdiction, or the residents and/or property owners, they have the option of engaging a traffic consultant, at their cost, to conduct an independent traffic study. Should the request be initiated through or by a municipality or the Florida Department of Transportation, then these agencies, at their option, may conduct traffic studies utilizing their staff or a traffic consultant. 2.1.a If the location falls within unincorporated Miami-Dade County, this study is coordinated by PWD. 2.1.b If the location falls within a municipality, the study is coordinated by the municipality and reviewed by the PWD. 2.2. Conduct Pre-implementation Traffic Study The traffic consultant hired by the applicants shall perform a pre-implementation traffic study. This study shall identify and confirm the applicant’s concerns (i.e., traffic intrusion, excessive traffic volume, speeding, traffic accidents, etc.) and determine if the collected traffic data meets PWD traffic calming criteria. On a case-by-case basis, PWD, Traffic Engineering Division, may require the following data depending on the type and complexity of the concerns: 2.2.a License Plate Survey: If the reason for the request is due to traffic intrusions, this survey will be required for confirmation of cut-through traffic. Sampling during the morning and afternoon peak hour periods will be considered adequate. 2.2.b Average Daily Traffic: If the reason for the request is due to an excessive amount of traffic in the area, a sampling of twenty-four (24) will be acceptable, and forty eight (48), or seventy-two (72) hour counts will be preferred. 2.2.c Speed Studies: If the reason for the request is due to speeding, then speed studies are required to confirm vehicular speed. A speeding problem can be verified when the 85th percentile speed of all vehicles is at least 10 mph greater than the posted speed limit. A non-peak hour daytime minimum sampling of 100 vehicles will be considered acceptable. A twenty-four (24) hour speed study utilizing traditional dual hoses will be preferred. 2.2.d Traffic Accident History: If the reason for the request is due to traffic accidents, then traffic accident reports for the last three (3) years are reviewed to confirm accident history. The proposed traffic calming measure shall mitigate significant crashes. 2.2.e Other data and/or studies as needed. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 18 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc PWD, on a case-by-case basis, may require additional traffic data or studies if needed. 2.2.f. If the pre-implementation study reveals that the traffic data does not support PWD Policy for Traffic Calming Measures (Appendices I, II and III) then a final decision of denial is rendered and the process ceases. PWD will notify the applicant of the denial. 2.2.g If the pre-implementation study confirms that a problem exists and the traffic data meets PWD Policy for Traffic Calming Measures (Appendices I, II and III), the applicant may proceed to the next step. 2.3. Identify Traffic Calming Alternatives The consultant shall adopt an area-wide systematic approach to the development of traffic calming alternatives. This approach must work within the overall framework of the existing roadway classification system and encourage community participation. There are three (3) levels of traffic calming ranging from I to III to distinguish those least restrictive (passive) traffic control measures from those that are most restrictive (active). Among the categories, there could be many design variations unique to each device. Ideally, the least restrictive measures to address traffic concerns should be employed first, followed by more active and physical traffic calming devices. This incremental approach allows a cost-effective opportunity to identify the real traffic problem, if any, and better evaluate the impact of more restrictive measures. Keeping the above-staged approach in mind and a handful of traffic calming alternatives available for use on local roads, a typical request for a traffic flow modification(s)/street closure(s) might proceed accordingly: 2.3.a The traffic consultant will assess the community’s needs. 2.3.b The consultant will generate staged alternative traffic calming plans, including design plans for temporary and permanent traffic calming measures, for approval by PWD, as well as cost estimates. 2.3.b.1 PWD will implement the lowest level of (Level I through Level III) traffic control measures on a temporary basis that, in the consultant’s opinion, will satisfy the applicant’s concerns. 2.3.b.2 Allow traffic to stabilize and reevaluate traffic patterns after six (6) months. 2.3.b.3 If Level I measures is selected and its impacts are unacceptable, then proceed to Level II and reevaluate more restrictive traffic calming alternatives. If Level II impacts are unacceptable, then proceed to Level III and reevaluate. 2.3.b.4 If the impacts of Level I, II or III measure, so selected are acceptable, PWD Traffic Flow Modification(s)/Street Closure(s) Procedure Page 19 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc will implement permanent traffic control measures, as funding and contracts are identified. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 20 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc The following categories of traffic calming alternatives are most effective when used in combination with each other: LEVELS OF TRAFFIC CALMING LEVEL I LEVEL II LEVEL III Education Neighborhood Speed Watch Program Law Enforcement Movement Restrictions One-Way Streets Multi-Way Stop Control Textured Pavement Gateway Treatments Border Landscaping Treatment Chokers Roundabouts Traffic Circle Speed Humps Raised Median through Intersections (Right Turn Only) Mid-block Raised Islands/Medians Semi Diverter Diagonal Diverter Street Closure Speed Humps The consultant shall also prepare a cost-estimate for the traffic calming alternatives identified above and proceed to the next step for a pre-implementation study. 2.4. Perform Pre-implementation Study to Determine the Potential Impact of Traffic Calming Measures on Roadways within and outside of the Study Area The consultant shall conduct a pre-implementation study to determine the potential impact of the proposed traffic calming devices/street closure(s), within and outside of the study area. Depending on the type, complexity and requirements of the area in question, PWD may, on a case-by-case basis, require analysis per Step 2.4.d and 2.4.e, which must conform to the following criterion: 2.4.a Volume Criteria: 2.4.a.1 Future traffic volumes due to traffic diversion on any of the Residential Local Streets may not exceed 1,500 vehicles per day (150 vehicles per hour (VPH) during the peak hours) if a traffic flow modification(s)/street closure is implemented. The threshold values define those limits when a local residential street begins to lose its livability and are used for analysis purposes only. They do not guarantee that the traffic flow modification(s) or closure(s) will be approved. 2.4.a.2 Future traffic volumes due to traffic diversion on any of the Residential Collector Streets may not exceed 3,000 vehicles per day (300 VPH during the peak hours) if a traffic flow modification(s)/street closure(s) is implemented. These threshold values define those limits when a residential collector street begins to lose its livability and are used for analysis purposes only. They do not guarantee that the traffic flow modification(s) or closure(s) will be approved. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 21 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 2.4.b Level of Service (LOS) Criteria: 2.4.b.l Future overall intersection Level of Service (LOS) must not exceed LOS “D” or if operating at LOS "E" must not degrade to LOS "F". 2.4.b.2 The same criterion applies for an individual intersection approach within the critical intersection approach. 2.4.b.3 If intersection or approach is already at LOS “F”, then diverted traffic volumes must not be more than 10% of the existing traffic volumes without diversion. 2.4.c Determine Affected Area: The affected area may include, but is not limited to, those properties where normal travel routes, to and from the affected area, are to be altered by the traffic flow modification(s)/street closure(s) and/or properties that are significantly impacted by the diverted traffic. 2.4.c.1 If the request for traffic flow modification(s)/street closure(s) falls within unincorporated Miami-Dade County, PWD will establish affected area boundaries on a case-by-case basis and obtain concurrence from FDOT if their facilities are impacted. 2.4.c.2 If the request for traffic flow modification(s)/street closure(s) falls within a municipality, both the City’s, and County’s staff will determine the boundaries of the affected area on a case-by-case basis, and obtain concurrence from the Florida Department of Transportation (FDOT), if their facilities are impacted. 2.4.d Conduct Traffic Analysis within the Study Area: For critical locations, if any, provide projection of the expected diverted traffic within the study area. This will require the following steps: 2.4.d.1 Peak-hour turning movement counts (TMC). 2.4.d.2 Twenty-four (24), forty eight (48), or seventy-two (72), hour counts on those streets that are proposed to be closed or modified. 2.4.d.3 Twenty-four (24), forty eight (48), or seventy-two (72) hour counts on those streets that may be impacted by proposed traffic flow modification(s)/street closure(s). 2.4.d.4 LOS analysis at critical locations that will be affected by redistributed traffic. 2.4.d.5 A schematic diagram for both morning and afternoon peak hours showing existing and redistributed traffic and Average Daily Traffic (ADT). Traffic Flow Modification(s)/Street Closure(s) Procedure Page 22 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 2.4.e Conduct Traffic Analysis outside the Study Area Projection of the expected diverted traffic at critical intersections, if any, adjacent to and surrounding the affected area. Particular attention shall be paid to the impacts on the State Highway System and County roadways, including: 2.4.e.1 Peak-hour TMC. 2.4.e.2 Queuing analysis and storage requirements at signalized intersections. 2.4.e.3 LOS analysis at critical signalized and un-signalized existing intersections. 2.4.e.4 A schematic diagram showing the results of the TMC and ADT analyses for critical locations. 2.4.e.5 Phasing modification requirements at existing signalized intersection. 2.4.e.6 A detailed evaluation of the impacts caused by the traffic flow modification(s)/street closure(s) on emergency vehicle response times and fire hydrant accessibility, as well as other services such as mail delivery, school bus routing, transit service, trash pick-up, etc. Each individual case will dictate which of the above items are required, depending on the complexity and requirements of the study area. 2.4.f The Report: The consultant will document the study in the form of a report. PWD will require the following items as part of this report: • A drawing that shows the exact location of existing and proposed traffic flow modification(s)/street closure(s). • Boundary of the affected area. • Critical intersection geometries. • Analysis of the critical intersections and roadway links per
4.d and 2.4.e. • Comparison of before and after LOS. The consultant will indicate the optimum traffic calming measure from each of Levels I, II and III, which adequately satisfies the applicant’s concern. The Level I measure generally should be implemented first. However, depending on the severity of the case at hand and/or unusual circumstances a higher level of measures can be implemented. If the results are not satisfactory, then the next level measure will be implemented until Level III is reached. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 23 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Any traffic study performed for traffic flow modification(s)/street closure(s) should be compiled by the traffic consultant in the form of a formal report, signed and sealed by a Florida Registered Professional Engineer. If the location falls within unincorporated Miami-Dade County, the applicant shall submit three (3) copies of the report to PWD, Traffic Engineering Division, which, in turn, forwards a report to the FDOT if State facilities are impacted. If the location falls within a municipality, applicant shall submit three (3) copies of the report to the municipality, which in turn, forwards a report to PWD and the FDOT if State facilities are impacted. 2.5 Is the Request within a Municipality? 2.5.a If the request for traffic flow modification(s)/street closure(s) falls within unincorporated Miami-Dade County, PWD coordinates the review as per Step 2.7.a. 2.5.b If request for traffic flow modification(s)/street closure(s) falls within a municipality, PWD will request the affected entity to coordinate the review as per Step 2.7.b. 2.6 Is Review from Various Entities Required? PWD will make the determination if the proposed traffic calming measures will impact other user entities and if review is required from affected user entities, such as police, fire, etc. If review is required, proceed to next step. If review is not required, proceed to Step 2.8. 2.7 Preliminary Review by Various Entities 2.7.a If the request for traffic flow modification(s)/street closure(s) falls within unincorporated Miami-Dade County, then PWD, Traffic Engineering Division, shall coordinate a review with agencies potentially affected by the traffic flow modification(s)/street closure(s), which may include, but not be limited to, affected Municipal Police and Fire Departments, MDFR, MDPD, MDP&Z, MDCPS, MDT, FDOT. 2.7.a.1 PWD, Traffic Engineering Division, shall review all comments brought forth by the aforementioned entities. If all agencies and departments concur, then the Director of PWD will approve the application. However, under the following conditions, the application for traffic flow modification(s)/street closure(s) will be denied. 2.7.a.1.1 Comments made by any entity revealed concerns, which cannot be resolved. 2.7.a.1.2 The proposed locations or extenuating circumstances do not Traffic Flow Modification(s)/Street Closure(s) Procedure Page 24 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc meet all criteria outlined under this process or applicable State laws. 2.7.b If the request affects local streets within a municipality, then the municipality coordinates review with other agencies potentially affected by the traffic flow modification(s)/street closure(s), which may include, but not be limited to, affected Municipal Fire and Police Departments, MDFR, MDPD, MDP&Z, MDCPS, MDT, FDOT, PWD, Traffic Engineering Division. 2.7.b.1 The municipal representative shall review all comments brought forth by the aforementioned entities. The municipality, under the following conditions, shall deny the application for traffic flow modification(s)/street closure(s): 2.7.b.1.1 Comments made by any entity revealed concerns, which cannot be resolved. 2.7.b.1.2 The proposed locations or extenuating circumstances do not meet all criteria outlined under this process or applicable State laws. 2.7.c If the preliminary review performed by the various affected entities results in denial of the request, the process ceases. 2.7.d If the preliminary review performed by the various affected entities results in concurrence of the request, then the municipality endorses the request and forwards it to PWD, Traffic Engineering Division. These reviews shall be relevant to the agency reviewing the proposed traffic flow modification(s)/street closure(s). The scope of the traffic review shall be determined on a case-by-case basis by PWD. 2.8 Approval or Denial of the Request 2.8.a If the location falls within an unincorporated area, PWD makes the determination on the traffic flow modification(s)/street closure(s). 2.8.a.1 If the traffic flow modification(s)/street closure(s) is denied by PWD, the process ceases. 2.8.a.2 If the traffic flow modification(s)/street closure(s) is approved by PWD, then proceed to the next step. 2.8.b If the location falls within a municipality, that entity makes recommendations on traffic flow modification(s)/street closure(s). 2.8.b.1 If the municipality denies the traffic flow modification(s)/street closure(s), the process ceases. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 25 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 2.8.b.2 If the traffic flow modification(s)/street closure(s) is endorsed by the municipality, the request is forwarded to PWD for review and approval. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 26 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 2.9 Is Concurrence from the Affected Property Owners Required? Depending on the traffic calming devices, PWD will determine if concurrence from the affected residents and/or property owners is required. Required Affected Residents and/or Property Owners: Traffic Circles: Requires 100% concurrence of affected residents and/or property owners from four (4) corners adjacent to the proposed circles. This may be extended to the full block should a larger representation be desired by the District Commissioner. Traffic Flow Modifications other than Traffic Circles: Requires concurrence of two- thirds (2/3) of the affected residents and/or property owners, who elected to vote (ballots received). Non-voters are not counted (ballots not returned). Municipal Jurisdictions: In lieu of concurrence from the affected residents and/or property owners, a municipality may pass a resolution after a public hearing requesting PWD to consider the proposed traffic flow modification(s)/street closure(s). 2.9.a If concurrence of the affected residents and/or property owners is required, proceed to the next step. 2.9.b If concurrence of the affected residents and/or property owners is not required, proceed to Step 2.11. 2.10 Approval of Traffic Plan As a result of the above-referenced steps, the affected residents and/or property owners must support the traffic calming flow modifications derived. Residents (one per household) must be either property or business owners, or tenant, within the affected area by the proposed traffic flow modification(s)/street closure(s). A public workshop, organized by the applicant’s traffic consultant, will be held and affected residents and/or property owners and business owners will be invited to participate. The purpose of the workshop will be to determine the proposed alternative(s) having the greatest community support. The public workshop should include participation by the municipality, PWD and FDOT officials. 2.10.a If the location is within unincorporated Miami-Dade County, PWD will mail out ballots to obtain concurrence from the affected residents and/or property owners. 2.10.b If the location is within a municipality, and PWD is funding the installation of the devices then the County shall mail out ballots to obtain concurrence from the required affected residents and/or property owners. 2.10.c If the location is within a municipality, and that municipality is funding the installation of the devices then such municipality shall mail out ballots to obtain concurrence from the required affected residents and/or property owners. (see Appendices VII, VIII and IX for sample ballots). Traffic Flow Modification(s)/Street Closure(s) Procedure Page 27 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 2.10.d A municipality, in lieu of the concurrence from affected residents and/or property owners, may elect to have their elected body vote on the proposed traffic flow modification(s)/street closure(s) after a public hearing and may submit the resolution to PWD for review of the proposed traffic flow modification(s)/street closure(s). 2.10.e If the required number of affected residents and/or property owners do not approve the proposed improvements, then the process ceases. 2.10.f If the residents and/or property owners desire to reinitiate the process, such process can be reinitiated after ninety (90) calendar days from the previous opening date of the ballots. However, the applicant will be charged with the mailing and processing cost, which will be determined on a case-by-case basis. 2.10.g If the request for traffic flow modification(s)/street closure(s) falls within unincorporated Miami-Dade County, then the applicant agrees to pay for all costs directly associated with the traffic flow modification(s)/street closure(s) beyond the installation of signs and markings. 2.10.h If the request affects local streets within a municipality, then determination will be made by the local entity and either the applicant or the municipality will share the costs directly associated with the traffic flow modification(s)/street closure(s) beyond the installation of signs and markings. 2.10.i Depending on the complexity of the traffic flow modification(s)/street closure(s), PWD may direct the Citizens Transportation Advisory Committee (CTAC), Transportation Planning Technical Advisory Committee (TPTAC), or MPO, to provide input prior to the final recommendations by PWD. 2.10.j If CTAC, TPTAC or MPO technical reviews recommend against the proposed traffic calming alternative(s), then that decision will be final. 2.10.k If the location falls within unincorporated Miami-Dade County, then PWD will notify the applicant of the approval or denial of the traffic flow modification(s)/street closure(s) request. 2.10.l If the location falls within a municipality, then PWD will notify the applicant and the municipality, of the approval or denial of the traffic flow modification(s)/street closure(s) request. 2.10.m If the required number of the affected residents and/or property owners does not approve the proposed improvements, then the process ceases. 2.10.k If the residents and/or property owners desire to reinitiate the process, such process can be reinitiated after ninety (90) calendar days from the previous opening date of the ballots. However, the applicant will be charged with the mailing and processing cost, which will be determined on a case-by-case basis. 2.10.l If the required number of the affected residents and/or property owners concur with the traffic flow modification(s)/street closure(s) plan approved by PWD, proceed to Traffic Flow Modification(s)/Street Closure(s) Procedure Page 28 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Step 2.11. 2.11 Installation of Temporary Traffic Calming Devices 2.11.a The applicant’s consultant develops a plan for the temporary and permanent traffic flow modification(s)/street closure(s). 2.11.b If the jurisdiction falls within unincorporated Miami-Dade County, then the applicant submits construction plans to PWD, Traffic Engineering Division, for approval of the temporary traffic flow modification(s)/street closure(s), including all signs and markings. 2.11.c If the jurisdiction falls within a municipality, then the applicant submits construction plans to the municipality for approval of the temporary traffic flow modification(s)/street closure(s) including all signs and markings. 2.11.d Municipality forwards plans to PWD, Traffic Engineering Division, for traffic engineering review and approval. 2.11.e Applicant engages a contractor to install temporary traffic control devices, which will be allowed only for a 90-day trial period. 2.11.f At the expiration of the 90-day trial period, the applicant shall remove the temporary traffic calming devices, unless the Director of the Public Works Department grants an extension, or constructs permanent devices. 2.12 Conduct Post-implementation Study to Assess if the Impact of Implemented Devices are Acceptable Once the temporary traffic calming devices are implemented, they need to be evaluated prior to the installation of the permanent traffic calming devices. 2.12.a Applicant requests traffic consultant to collect traffic data after the traffic pattern has been established over a period of thirty (30) days and shall be completed within the remaining sixty (60) days. 2.12.b Traffic consultant analyzes the data and submits reports either to PWD or the municipality, whichever has jurisdiction. 2.13 Post-impact Analysis Results If the study reveals that the impact of the temporary traffic control devices are unacceptable, then the consultant shall go back to Step 2.3 to identify more restrictive traffic calming alternatives. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 29 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc If it is determined that the temporary traffic control devices are ineffective, then the request for permanent installation shall be denied and the applicant shall direct the contractor to remove the temporary traffic control devices at the expiration of the 90-day trial period. 2.13.a If the location falls within unincorporated Miami-Dade County, then PWD will notify the applicant of the approval or denial of the permanent traffic flow modification(s)/street closure(s). 2.13.b If the location falls within a municipality, and if the request is initiated by the municipality, then PWD will notify the municipality. The municipality, in turn, will notify the applicant of the approval or denial of the permanent traffic flow modification(s)/street closure(s). If the study reveals no adverse impacts and temporary devices are acceptable, then proceed to Step 2.14. 2.14 Design of Permanent Traffic Control Devices 2.14.a If the location falls within unincorporated Miami-Dade County, then construction plans are prepared by the applicant’s consultant and are submitted to PWD for approval of the permanent traffic flow modifications or street closures, including all signs and markings. 2.14.b If the location falls within a municipality, then construction plans are prepared by the applicant’s consultant and are submitted to a municipality for approval of the permanent traffic flow modifications or street closures, including all signs and markings. The municipality shall then forward plans to PWD, Traffic Engineering Division, for traffic engineering review and approval. 2.15 Installation of Permanent Traffic Calming Devices Applicant directs private contractor(s) to install permanent closure, at their expense, upon obtaining necessary approvals and permits from the appropriate agencies. In situations where a traffic flow modification(s)/street closure(s) in one municipality affects an adjacent municipality, then both municipalities shall mutually agree to such modification(s). Miami-Dade County has the sole discretion, subject to all applicable laws, to approve, modify, remove, continue or deny any traffic flow modification(s)/street closure(s) request regardless of any support or lack thereof via the petition process. The approval or denial issued by the Director of PWD for a traffic flow modification(s)/street closure(s) is final. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 30 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDICES Traffic Flow Modification(s)/Street Closure(s) Procedure Page 31 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX 1 Public Works Department – Traffic Engineering Division Policy on Traffic Calming Measures Must meet the first criteria and at least one of the remaining criteria in order for the Public Works Department to consider traffic calming measures: Criterion Residential Local Streets Residential Collector Streets Minimum Traffic Volume >1,500 VPD <3000*** >3,000 VPD <8,000*** >150 VPH <300*** >300 VPH <800 85th Percentile Speed+ 10 MPH> Speed Limit 10 MPH> Speed Limit Correctable Accidents per year >3 per year >6 per year Cut Through Traffic during the a.m. or p.m. peak hour >25% >50% Pedestrian Crossing Volume during the a.m. or p.m. peak hour >25 >50 Concurrence from affected residents/property owners.* 2/3 of returned ballots** 2/3 of returned ballots ** VPD = Vehicles per day; VPH = Vehicles per hour + It is the speed at which 85% of motorists travel. * Affected residents/property owners to be determined on a case by case basis. ** For traffic circle 100% concurrence from adjacent affected residents and or property owners is required. Municipal Jurisdictions: In lieu of concurrence a resolution is acceptable from municipalities. *** The traffic volume within a municipal boundary could be reduced by a total of 30%, and speed by 50% at the request of and for those municipalities, which provide funding for their traffic calming program. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 32 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX II POLICY ON TRAFFIC CALMING DEVICES FOR LOW VOLUME NARROW STREET General Requirements: • The street must be a local residential street. • The street width must be less than 20 feet. • The posted speed limit must be 30 mph or greater. • The street is not on an emergency vehicle route. • The street is not on a school bus route. • The street must not be on a curve. • The proposed TCD will have no adverse effect on pedestrians, bicycle safety or drainage. • The street does not have any sidewalks. Criteria: The Street must meet the first criteria and any one of the other criteria: • 85th percentile speed must be 5 mph over the posted speed limit, • Traffic volume shall not be less than 500 vehicles per day or more than 1000 vehicles per day. • Cut-through traffic must be over 25%. • Pedestrian volume must be over 15 pedestrians per hour. • Two or more correctable-type accidents per year. OR • 85th percentile speed must be greater than or equal to posted speed limit. • Cut-through traffic must be greater than or equal to 40%. • Traffic volume shall not be less than 500 vehicles per day or more than 1000 vehicles per day. • Pedestrian volume must be over 15 pedestrians per hour. • Two or more correctable-type accidents per year. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 33 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX III POLICY ON SPEED HUMPS PURPOSE: The purpose of this policy is to provide guidelines for the installation of speed humps along local residential streets within Miami-Dade County. POLICY: Speed humps will be considered, on a case-by-case basis, and only on local residential streets, which meet the following criterion: CRITERION: • The street must be a local residential street. Speed hump shall not be constructed on collector and arterial roadways. • The street shall not have more than one traffic lane in each direction. • The street must be at least 750 feet long, with no intersecting roadways in between. • Traffic volumes on the street must equal or exceed 750 vehicles per day. • The street is posted at or has a speed limit of 30 MPH or less. • The traffic engineering study has determined that the 85th percentile speed on the street is at least 10 MPH over the speed limit. • The speed humps will not be considered within 250 feet of a traffic signal, within 50 feet of an intersection, in front of a driveway, within an intersection or adjacent to fire hydrants. • The speed humps will not be considered in, or on the approaches to, a horizontal or a vertical curve where visibility of the hump is restricted. • The street should not be located along an emergency response route, regional transit or school bus route and must be approved by the respective agencies for the installation of speed humps. • Installation of these devices shall not cause the traffic to divert to other neighborhood streets. • 2/3 of the residents/property owners of the block(s) concur with the installation of the speed hump. • The District Commissioner approves the use of PTP funding for the installation. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 34 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX IV REPORT ON SPEED HUMPS Traffic Flow Modification(s)/Street Closure(s) Procedure Page 35 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 36 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 37 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 38 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 39 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 40 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 41 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Traffic Flow Modification(s)/Street Closure(s) Procedure Page 42 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX V Traffic Flow Modification/Street Closure Applicant Form Applicant: ___________________________________ Date: __________________________ Contact Name: ________________________________ Phone: ________________________ Local Address: _________________________________________________________________________ Location: _________________________________________________________________________ 1.a.1 Rank your neighborhood’s traffic problems and provide a brief description of each (for instance, time when the problem is most serious, or specific issue, such as a pothole). ( ) Traffic intrusion____________________________________________________ ( ) Excessive traffic volume_____________________________________________ ( ) Speeding________________________________________________________ ( ) Accidents________________________________________________________ ( ) Other (please explain) ______________________________________________ ________________________________________________________________ 1.a.2 How long have these problems existed? What conditions have caused these problems? ______________________________________________________________________ ______________________________________________________________________ 1.a.3 Please check the type of action requested. ( ) Traffic Circle ( ) Median Treatment ( ) Street Closure ( ) Special Taxing District ( ) Reverting the right-of-way ( ) Other (please specify)_______________________________________________ ________________________________________________________________ List locations where traffic flow modification(s)/street closure(s) is requested and provide an area map identifying these devices________________________________________ Traffic Flow Modification(s)/Street Closure(s) Procedure Page 43 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc ______________________________________________________________________ Traffic Flow Modification(s)/Street Closure(s) Procedure Page 44 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc 1.a.4 This request is made on behalf of homeowners by: ( ) Homeowners Association ( ) Individual ( ) Other (please specify) ______________________________________________ 1.a.5 Please return the completed application form to: Chief, Traffic Engineering Division Miami-Dade County Public Works Department 111 N.W. First Street, Suite 1510 Miami, Florida 33128-1970 For Office Use Only Project Number _____________________________ Date Application Received: ____________ Date Preliminary Analysis Completed ______________ Identified Problems: ( ) Exist ( ) Perceived Date of First Neighborhood Workshop ______________ Traffic Team: ( ) Yes ( ) No Director Action: ( ) Favorable ( ) Unfavorable Consensus Reached: ( ) Yes ( ) No Date of Project Implementation _______________________ Project Review Date: _______________________________ Project Successful: ( ) Yes ( ) No Traffic Flow Modification(s)/Street Closure(s) Procedure Page 45 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX VI Traffic Flow Modification/Street Closure Interdepartmental Review To: Director, Public Works Department 111 N.W. 1st Street, Suite 1610 Miami, Florida 33128-1970 ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ We have reviewed this request and based on the reasoning stated above, we recommend the following action: ( ) Request Approved ( ) Request Denied Signature: ____________________________ Date: ___________________ Print Name: _____________________________________________________ Reviewing Agency: _______________________________________________ Address: ________________________________________________________ ________________________________________________________ Please attach additional sheets as necessary. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 46 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX VII Sample Ballot 1: Traffic Circles, PWD Use February 1, 2008 Mr. & Mrs. 0000 SW 00 Street Miami, Florida 33143-5952 Dear Mr. & Mrs. OFFICIAL NEIGHBORHOOD TRAFFIC CALMING RESIDENT AND/OR PROPERTY OWNER BALLOT The Miami-Dade County Public Works Department (PWD) has completed a traffic study at NW 10 Avenue and NW 50 Street. As a result of this study, a traffic circle is being proposed for the intersection of NW 10 Avenue and NW 50 Street. (See attached sketch) Should 100% of the residents and/or property owners adjacent to the proposed traffic circle concur with the proposed improvement, the PWD will proceed with the installation of this device, at no cost to the residents and/or property owners. In the event that 100% of these residents and/or property owners fail to reach a consensus, PWD will not pursue this matter any further. Please read through the ballot, check the appropriate box, complete the pertinent information and return this original ballot to PWD no later than Friday, February 29, 2008. A self-addressed return envelope with pre- paid postage is enclosed for your convenience. All submitted ballots (one ballot per lot) must be original, completed in ink. Ballot: I, the undersigned resident and/or property owner do hereby indicate my preference by checking the appropriate box, FOR or AGAINST the installation of the proposed traffic circle at the intersection of NW 10 Avenue and NW 50 Street. FOR AGAINST Signature Property Address Print Name Phone Number Date Your presence is welcome at the opening and tabulation of the received ballot envelopes on Friday, March 7, 2008, at 10:00 a.m., at the Stephen P. Clark Center, 111 NW 1st Street, 15th floor, rear conference room. Should you have any questions or require additional information, please contact Mr. Muhammed M. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 47 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Hasan, P.E., Chief, Traffic Engineering Division, at (305) 375-2030. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 48 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX VIII Sample Ballot 2: Traffic Calming Devices, PWD Use November 18, 2007 Mr. & Mrs. 0000 SW 00 Street Miami, Florida 33143-5952 Dear Mr. & Mrs. OFFICIAL NEIGHBORHOOD TRAFFIC CALMING RESIDENT AND/OR PROPERTY OWNER BALLOT The Miami-Dade County Public Works Department (PWD) in response to the request from the residents is proposing to construct a median diverter along SW 74 Street west of SW 52 Avenue in order to enforce the existing right turn restriction (See attached sketch). Should two-thirds (2/3) of the affected residents and/or property owners concur with the proposed median diverter, PWD will proceed with the installation of this device at no cost to the residents and/or property owners, upon securing funding from the District Commissioner. In the event that two-thirds (2/3) of these residents and/or property owners fail to reach consensus, PWD will not pursue this matter any further. Please read through the ballot, check the appropriate box, complete the pertinent information, and return this original ballot to PWD no later than Friday, December 7, 2007. A self-addressed return envelope with pre- paid postage is enclosed for your convenience. All submitted ballots (one ballot per lot) must be original and completed in ink. Ballot: I, the undersigned resident and/or property owner do hereby indicate my preference by checking the appropriate box FOR or AGAINST the installation of the proposed median diverter along SW 74 Street west of SW 52 Avenue. FOR AGAINST Signature Property Address Print Name Phone Number Date Your presence is welcomed at the opening and tabulation of the received ballot envelopes on Friday, December 14, 2007, at 10:00 a.m., at the Stephen P. Clark Center, 111 NW 1st Street, 15th floor, rear conference room. Should you have any questions or require additional information, please contact Mr. Muhammed M. Hasan, P.E., Chief, Traffic Engineering Division, at (305) 375-2030. Traffic Flow Modification(s)/Street Closure(s) Procedure Page 49 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc APPENDIX IX Sample Ballot 3: Residents/Property Owners and HOA Use OFFICIAL NEIGHBORHOOD TRAFFIC CALMING RESIDENTS’ AND/OR PROPERTY OWNERS’ BALLOT The Miami-Dade County Public Works Department (PWD), in response to the request for street closures, is proposing half closures at NE 88 St and NE 90 Street east of NE 10 Avenue that will prevent vehicles from entering NE 88 Street and NE 90 Street from NE 10 Avenue (See attached sketch). Please note that initially the half closures will be constructed using signs, plastic batons and pavement markings in order to receive input from the residents and make any needed adjustments to the design. It will be revaluated after ninety (90) days. Subsequently, should this device be acceptable to all parties involved, it will be made permanent utilizing concrete curb and gutter. Should two-thirds (2/3) of the affected residents and/or property owners concur with the proposed half closures, PWD will proceed with the installation of these devices. All submitted ballots (one ballot per lot) must be original and completed in ink. Ballot: We, the undersigned resident and/or property owner do hereby indicate our preference by checking the appropriate box FOR or AGAINST the installation of the proposed half closure along NE 88 St and NE 90 Street east of NE 10 Avenue. Name: Address: Signature: FOR AGAINST Name: Address: Signature: FOR AGAINST Name: Address: Signature: FOR AGAINST Name: Address: Signature: FOR AGAINST Name: Address: Traffic Flow Modification(s)/Street Closure(s) Procedure Page 50 \\miamidade\nas2\PWWM2\TE-OPERATIONS\00 Standards and references\Traffic Flow Modification-Street Closure_Original\TRAFFIC FLOW MODIFICATION(S) STREET CLOSURE(S) PROCEDURE_2009.doc Signature: FOR AGAINST
Official documents
City legislative record from the city's public agenda system. The Ask-Statura brief is an automated interpretation grounded in this item's metadata, not legal advice.