Statura IntelligenceStatura IntelligenceBETA
← Meeting Prep
Report/Recommendation· 2.· Village Council· Tue, Sep 13, 2022

Receive quarterly update on Miami Palmetto Senior High school renovation

Status
pending
Importance
38/100
Track
Statura briefing · workspace aware

Ask Statura about this item

Report/RecommendationintroducedVillage Council

What this item does, why it matters to your business, and what to watch next, in plain English. Follow-ups stay in the same thread.

Lifecycle

IntroducedSep 13, 2022
Adopted
Effective

Item text

MIAMI PALMETTO SENIOR HIGH GOB PROJECT #01777200 Architect – Zyscovich Contractor Thornton Construction PROJECT SCHEDULE 09/01/2022 MIAMI PALMETTO SHS 2 MDCPS GOB PROJECT #01516800 ADDRESS: 7431 SW 120th STREET, PINECREST, FL 33156 MDCPS PALMETTO SENIOR HIGH SCHOOL PARTIAL REPLACEMENT AND RENOVATIONS ARCHITECT:

Show the full text (6K chars)

MIAMI PALMETTO SENIOR HIGH GOB PROJECT #01777200 Architect – Zyscovich Contractor Thornton Construction PROJECT SCHEDULE 09/01/2022 MIAMI PALMETTO SHS 2 MDCPS GOB PROJECT #01516800 ADDRESS: 7431 SW 120th STREET, PINECREST, FL 33156 MDCPS PALMETTO SENIOR HIGH SCHOOL PARTIAL REPLACEMENT AND RENOVATIONS ARCHITECT: ZYSCOVICH, INC. CIVIL ENGINEER: ROSS ENGINEERING INC. LANDSCAPE ARCHITECT: CURTIS AND ROGERS DESIGN STUDIO INC. STRUCTURAL ENGINEER: NIFAH & PARTNERS CONSULTING ENGINEERS INC. GENERAL CONTRACTOR: THORNTON CONSTRUCTION CO., INC. CONSTRUCTION SCHEDULE BREAKDOWN PHASE START FINISH PHASE I 07/25/18 01/06/20 (Completed) PHASE I (PART 2 – BLDG 2) 07/19/19 10/05/20 (Completed) PHASE II (BLDG 7A) 03/31/20 03/08/21 (Completed) PHASE II (PART 2 - 7B & 4) 03/31/20 08/20/21 (Completed) PHASE III (BASKETBALL) 01/24/21 08/17/22 (Completed) PHASE III (BLDG 6B) 03/31/20 09/25/22 (Ongoing) PHASE IV (Part 1 -BLDG 6A – Band Room) 03/31/20 09/25/22 (Ongoing) PHASE IV (Part 2 -BLDG 6A – (Auditorium) 03/31/20 09/25/22 (Ongoing) PHASE IV (Part 3 -BLDG 7C – (Elec Rm/Site) 08/17/22 10/28/22 (Ongoing) SCOPE OF WORK & BREAKDOWN OF PHASES PHASE I BUILDING 1A / 1B NEW 3-STORY ADMINISTRATION & CLASSROOM BUILDING BUILDING 5A SCIENCE LABS RENOVATIONS PHASE I (PART 2) BUILDING 2 MEDIA BUILDING (MEDIA CTR, SCIENCE & COMPUTER LABS & CCTV STUDIO) PHASE II BUILDING 7A NEW 1-STORY ARTS WING (DANCE, PHOTO LAB, 2D & 3D ART LAB, VOCAL) PHASE II (PART 2) BUILDING 7B NEW CAFETERIA BUILDING (KITCHEN, DINING AND EXTERIOR SERVING BAY) BUILDING 4 NEW 1-STORY LANGUAGE ARTS LAB (BLACK BOX THEATRE) PHASE III SITE NEW BASKETBALL COURTS (TWO COURTS) PHASE III (PART 2) BUILDING 6B ART CLASSROOM RENOVATION PHASE IV Building 6A Band Room PHASE IV (Part 2) Building 6A Auditorium PHASE IV (Part 3) Building 7C Electrical Room, FPL Vault Room, Boiler Room PRESENTATION TITLE 3 FINAL DESIGN RENDERING ORIGINAL AERIAL BUILDING 1A MAIN ADMINISTRATION OFFICES BUILDING 1A / 1B ADMINISTRATION AND CLASSROOM BUILDING BUILDING 1A / 1B • Administration / Reception Attendance • Production Work Room • Records / Bookkeeping • Careers Room • Guidance Counselors • Student Services • Clinic • Journalism • Computer Labs MAIN COURTYARD Buildings 1A/1B, Building 2 and Building 3’s Outdoor Seating throughout Main Courtyard BUILDING 1A / 1B BUILDING 1A / 1B BUILDING 2 MEDIA CENTER Media Center Computer Labs Wrestling Room MEDIA Media with Library Reading Rooms, Periodicals, Stacks and Extended Learning Area BUILDING 2 - MEDIA Media Specialist Station, Periodicals, Reading Breakout Areas, Interior Circulation BUILDING 2 Hall of Fame / Strength / Courage / Dedication Corridor of Champions BUILDING 2 - CCTV STUDIO CCTV Studio with Production & Processing Studio, CCTV Production Control Room, Distribution Room, (2) Editing Rooms, A/V Storage, Reception Area, Office and Telecom Room BUILDING 2 SCIENCE Science Lab Science Demo Science Storage BUILDING 3 - MODULAR Exterior Paint throughout entire Campus BUILDING 4 BLACK BOX THEATER BUILDING 4 BLACK BOX THEATER BUILDING 6 - AUDITORIUM New 765 Seating, Lighting, Sound System, Control Booth, Curtains, Sound Attenuation Boards, Ticket Booth, Concession Stand, Showcase Rooms, Security Camera System, WAP, and Flooring. Renovations to the Band Room, Drama Room, Dressing Rooms, Dressing Room Restrooms, Prop Storage, Material’s Storage, and Teacher Planning. BUILDING 7A – ART WING DANCE / 2D & 3D ART / PHOTOGRAPHY / VOCAL /GROUP RESTROOMS / CONCESSION STAND BUILDING 7 A Art Patio BUILDING 7A VOCAL • VOCAL ROOM • PRACTICE ROOMS • ROBE WARDROBE • ENSEMBLE BUILDING 7B • Exterior Serving Bay • Main Dining • Serving Line • Group Restrooms • Food Prep • Freezer and Cooler • Laundry • Paper Storage • Equipment Storage • Teacher Lounge • Receiving Work Area, Office and Restroom BUILDING 7B – DINING BUILDING 7B KITCHEN BUILDING 7B KITCHEN BEFORE / AFTER DINING BEFORE / AFTER MAIN ENTRANCE BEFORE / AFTER ADMINISTRATION BEFORE / AFTER ADMINISTRATION BEFORE / AFTER TYPICAL CLASSROOMS BEFORE / AFTER CLASSROOM CORRIDORS BEFORE / AFTER COURTYARD BEFORE/AFTER • Drafting Lab • Web Design Lab • Health/Dental Lab • Resource Center • Business Practice Lab • Child Care Lab BUILDING 2 BEFORE / AFTER MEDIA CENTER BEFORE / AFTER SCIENCE • Science Classrooms • Science Demo • Science Labs • Science Storage BUILDING 4 BLACK BOX THEATER • Black Box Theater • Storage Rooms • Control Booth • Sound System • Lighting • Curtains • Group Restrooms • Roll Up System for Outdoor Performance • Lawn Seating BUILDING 7A 2D AND 3D ART • 2D Art Studio • 3D Art Studio • Large 2D and 3D Materials Storage • Kiln Room • Art Patio BUILDING 7A DANCE • Floor to Ceiling Mirrors • Wooden Floor • Marley Flooring • Dressing Room • Lockers BASKETBALL COURTS X PRESENTATION TITLE Two New Basketball & Volleyball Courts With Plexi-Pave Finish

Official documents

City legislative record from the city's public agenda system. The Ask-Statura brief is an automated interpretation grounded in this item's metadata, not legal advice.